3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Feb. 6, 2007 BILCW07 Global Design Effort 1 CF&S EDR Plans Main Linac Parallel Session Tom Lackowski Atsushi Enomoto, Jean Luc Baldy, Vic Kuchler.
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Stefan Moeller Exp. Areas Conventional October 24, Experimental Areas - Conventional Facilities Stefan Moeller.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
1 Process Water and Air Treatment 01 June 2007 Emil Huedem, Maurice Ball, Lee Hammond Fermilab.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
ARUP Studies Update ILC Interaction Region Design Requirements John Osborne CERN, Yung Loo & Matt Sykes (ARUP) CFS-ADI Joint Meeting - University of Tokyo.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
April 5, 2005 PPD Informal FLARE Review T. Lackowski 1 FLARE Conventional Civil Construction.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Template for DUSEL Meeting with Potential Experiments.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
PHG - Detector Estimates - Daresbury - July 12-13, 2010 ILC - Global Design Effort 1 What is included in the Cost Estimates for the ILC Detectors? Peter.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
SUPERB site status report for layout v12
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
CBETA Technical Review
Conventional Facility & Siting (CF&S) Overview for the Positron Source
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
Detector hall in mountain regions
Status of Cryogenics Facilities Design
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
Tom Lackowski Revised 10/12/2011
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
JLEIC Accelerator R&D Meeting
Presentation transcript:

3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

3/20/11 ALCPG11 Global Design Effort 2 CFS must advance the IR Region and Detector Hall design for the TDR. –Improved understanding of the Detector Requirements for CFS. –Regional CFS Designs that satisfy the Detector Requirements –A much more complete cost estimate –The design(s) presented and costed in the TDR must have the concurrence of each of the Detector Collaboration.

We can move forward towards the TDR CFS goals with some direction from the Collaborations. –Specific, or exact information is NOT necessary; Placeholders or Ranges will advance our efforts. –CFS would like to focus on those items that are cost drivers –We need requirements, not system designs at this point Requirements are based on detector and physics optimum performance. Requirements are the same for all regions 3/20/11 ALCPG11 Global Design Effort 3

3/20/11 ALCPG11 Global Design Effort 4 RDR Cost Distribution of IR RDR Costs

3/20/11 ALCPG11 Global Design Effort 5 RDR Cost Distribution of IR Civil Engineering Costs

3/20/11 ALCPG11 Global Design Effort 6 RDR Costs Further Distribution of IR Underground Costs

Some issues, such as studies to determine ground behavior with respect to settlements and vibration may be out of reach for the TDR for all regions. John’s talk describes a proposed study at CERN. –(Granted my geotechnical course work was done a while ago, but the geotechnical predictive models and formulas with bore hole test data are bases on empirical data and provide at best a range of potential motion) 3/20/11 ALCPG11 Global Design Effort 7

3/20/11 ALCPG11 Global Design Effort 8 Requirements Outline Site –Access Roads Weight Limits –Parking (# of people) –Storage Hardstands –Cryo and Gas Storage (Mixing) –Fire Brigade Access Site Utilities Water –Fire Protection –Primary Cooling –Potable (Drinking) –Sanitary Sewer

Date Event Global Design Effort 9 Utilities (continued) –Electrical Service –Communications Building(s) –Detector Sub-Assembly Space –Ancillary Space Control Room Office Tech Electronics Machine Shop Testing Access Control

3/20/11 ALCPG11 Global Design Effort 10 Building Requirements Buildings (Continued) –Mechanical HVAC –Temperature range - Stability –Humidity criteria –ODH –Special Ventilation for gases, fire protection Process Water loads –Water Temperature –Water Type – LCW / Chilled LCW / Chilled –Electrical Power distribution Lighting Fire Detection

3/20/11 ALCPG11 Global Design Effort 11 Detector Hall Access Shafts or Horizontal Access –Governing Load dimensions and weights –Services routed in shafts –Shaft environmental criteria (Ground Water Infiltration)

3/20/11 ALCPG11 Global Design Effort 12 Detector Hall Requirements Detector Hall –Footprint required to construct Detector –Detector Footprint in beam –Detector Footprint in Parked Area(Gross footprint including access platforms, servies, and detector opened for maintenance) –Platform dimensions and travel –Cranes, lifts and hoists –Ancillery Space Control Room

Detector Hall Requirements –# of people During Construction During Running Maintenance Periods Sub, sub point 3/20/11 ALCPG11 Global Design Effort 13

3/20/11 ALCPG11 Global Design Effort 14 So how do we get to our common TDR goals. –Write down (CFS) the goals and deliverables –Focus on what we know or can scale from existing detectors –Set a schedule (During THIS MEETING for the near future deliverables) Requirements Document –Outline complete; 30%; 60%; Final TDR Requirements w/ collaboration concurrance Design Development Drawings –Write the Requirements Documents –Identify points of contacts that will get the tasks done. (TODAY)

Let’s Start- Can we Concur Each detector will be designed to provide beam radiation shielding and no shielding external of the detector is required for unrestrictive occupancy and maintenance of the parked detector. Both the MDI and ILD detector will be supported and transported on independent platforms. 3/20/11 ALCPG11 Global Design Effort 15

Conclusion A reasonable goal is to have a “mostly complete” requirements document done by the next meeting in September. –This document should be put under some form of change control. Regional CFS Conceptual Document (Drawings and Text) and much of the cost estimate must be done by a year from now. 3/20/11 ALCPG11 Global Design Effort 16

Date Event Global Design Effort 17

Date Event Global Design Effort 18

Date Event Global Design Effort 19

Date Event Global Design Effort 20

Date Event Global Design Effort 21

Date Event Global Design Effort 22

Date Event Global Design Effort 23

Date Event Global Design Effort 24

Date Event Global Design Effort 25

Date Event Global Design Effort 26