Guidance and Control Programs at Honeywell Sanjay Parthasarathy Honeywell Aerospace Advanced Technology October 11, 2006

Slides:



Advertisements
Similar presentations
NextGen and Its Impact on Performance Worldwide Symposium on Performance of the Air Navigation System ICAO Montreal, Quebec, Canada March 26-30, 2007 Victoria.
Advertisements

1 Air-Ground Integration Ed Bailey, Airborne Project Leader & Ian Wilson, PATs Project Leader.
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL.
7 tasks identified Flight Arrival Interaction Detection Resolution Planning Resolution Implementation Monitoring Other Trajectory Changes Co-ordination.
Conflict Detection and Resolution
European ATFM From current operation towards the future Patrick Ky
FAA/Eurocontrol TIM 9 on Performance Metrics – INTEGRA Rod Gingell 16 May 2002.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Air Traffic Management
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Free Flight with Airborne Separation will result in an uncontrolled,
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
Presented to: REACT Workshop By: Jay Merkle Date:25 June 2008 Federal Aviation Administration High Density Airport Time- based RNAV/RNP NextGen/JPDO Demonstrations.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
Continuous Climb Operations (CCO) Saulo Da Silva
SES ll and SESAR -Presentation to BBGA Annual Conference Brian Humphries CBE President EBAA 12 Mar 2013.
Development of a Closed-Loop Testing Method for a Next-Generation Terminal Area Automation System JUP Quarterly Review April 4, 2002 John Robinson Doug.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
Applications from packages I to III
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Ames Research Center 1October 2006 Aviation Software Systems Workshop FACET: Future Air Traffic Management Concepts Evaluation Tool Aviation Software Systems.
Introduction to NextGen Relevance to Taiwan 29 May 2008 The views, opinions and/or findings contained in this report are those of The MITRE Corporation,
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
NASA Self-Separation from the Air and Ground Perspective Margaret-Anne Mackintosh, Melisa Dunbar, Sandra Lozito, Patricia Cashion, Alison McGann, Victoria.
Space Indexed Flight Guidance along Air Streams Mastura Ab Wahid, Hakim Bouadi, Felix Mora-Camino MAIA/ENAC, Toulouse SITRAER20141.
1/14 Development and Evaluation of Prototype Flight Deck Systems for Distributed Air-Ground Traffic Management ASAS Thematic Network - Workshop 3 Toulouse,
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
Will we ever automate the tasks of the ATCO? Job Brüggen Safety Manager LVNL Will we ever automate the tasks of the ATCO? Ir. Job Brüggen.
Study Continuous Climb Operations
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
1 September 28th, 2005 NASA ASAS R&D A IRSPACE S YSTEMS P ROGRAM Michael H. Durham Kenneth M. Jones Thomas J. Graff.
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
Optimal Approach procedures
1 ATM System Wide Modeling Capabilities in Fast-Time Simulation 1 st Annual Workshop – NAS-Wide Simulation in Support of NextGen Dec. 10th – George Mason.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
1 Call Identifier : FP TREN-3 Thematic Priority 1.4 Aeronautics and Space ERASMUS project Project overview Aeronautical Days - Vienna June 2006 En.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Ames Research Center 1 FACET: Future Air Traffic Management Concepts Evaluation Tool Banavar Sridhar Shon Grabbe First Annual Workshop NAS-Wide Simulation.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Seville, Spain June 2008 REACT: The FMS Perspective Keith Wichman – GE Aviation Systems.
ERASMUS – gen – V 1.1 – Call Identifier : FP TREN-3 Thematic Priority 1.4 Aeronautics and Space ERASMUS project Project overview September.
Visualization of Aircraft Approach and Departure Procedures in a DSS for Controllers Kristina Lapin, Vytautas Čyras, Laura Savičienė Vilnius University.
2 nd Workshop, April 2006 ASAS in Tomorrows Airspace Pierre Gayraud, THALES Bob Graham, EEC Tony Henley, BAe Systems Dr Anthony Smoker, IFATCA ASAS-TN2.
USE OF INTENT INFORMATION IN AIRCRAFT CONFORMANCE MONITORING
Honeywell Navigation, Communication and Control SAE G&C Committee Meeting Oct 19, 2005
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Basics of RNP. Outline  What is RNP?  Why implement RNP?  What does it mean for communities?
Digital In The Skies Simon Daykin NATS Chief Architect.
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
COmbining Probable TRAjectories — COPTRA
Friends and Partners of Aviation Weather
Continuous Climb Operations (CCO) Saulo Da Silva
NextGen and Its Impact on Performance
Data Communications Program
FPAW 2016 Summer Meeting 3 August 2016 Louis Bailey.
Basics of RNP.
Continuous Climb Operations (CCO) Saulo Da Silva
Trajectory-Based Operations(TBO) Saulo Da Silva
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
Communications Operating Concept & Requirements (COCR)
Presentation transcript:

Guidance and Control Programs at Honeywell Sanjay Parthasarathy Honeywell Aerospace Advanced Technology October 11, 2006

2HONEYWELL SP_Oct 2006 Update since Fall, 2005 Autonomous Systems programs - Micro Air Vehicle (MAV)  FCS Class 1 vehicle  Increase endurance - Organic Air Vehicle – 2 (OAV-2)  Phase 3a commenced  Obstacle Avoidance Demonstrated Successfully - Heterogeneous Urban RSTA Teams (HURT)  Planning and Control (P&C) software  Coverage Planner, Vehicle Tracker developed  Successful Demonstration using 4 UAVs Air Traffic Management (ATM) Modernization - Single European Sky ATM Research (SESAR) program  US Industry Input via Boeing, Rockwell-Collins and Honeywell - ERASMUS program kicked-off

3HONEYWELL SP_Oct 2006 ERASMUS Project: E n R oute A ir Traffic S oft M anagement U ltimate S ystem Funded by European Commission ERASMUS project proposes an air-ground cooperative work aiming at defining and validating innovative automation and concepts of operations for the En-route phase. The goal is to propose an advanced automation while maintaining the controllers in the decision loop. Three majors applications are proposed to be investigated:  Enhanced Medium Term Conflict Detection (MTCD);  “ATC autopilot”;  subliminal control. Team Lead: EuroControl Industrial Partner: Honeywell Kickoff meeting: May 11-12, 2006

4HONEYWELL SP_Oct 2006 ERASMUS Hypothesis: - Air Traffic Controller (ATC) perceives many situations as potential conflicts - Small changes in speed and/or Rate of climb can convert a conflict into a “non-conflict” - An “auto-pilot” for the ATC can reduce workload and increase safety - ATC need not consciously observe every small change to speed and altitude issued by the computer

5HONEYWELL SP_Oct 2006 En Route Air Traffic Soft Management Ultimate System (ERASMUS) - Air Traffic Controller (ATC) perceives many situations as conflicts  Lacks precise knowledge of aircraft trajectory  Human Factors – visualizes entire sector on limited screens  Lacks computational tools to advise if indeed there is a conflict Staggers traffic resulting in inefficient operations - Small changes in speed and/or Rate of climb can convert a conflict into a “non-conflict”  Need better 4D Trajectory Prediction Ground-based v/s on-board FMS Weather and aircraft parameters are main variables  Need Conflict Detection and Resolution (CD&R) algorithms - ATC need not consciously observe every small change to speed and altitude issued by the computer  Use 4D-trajectory predictions to optimize flights  Uplink minimal speed/altitude change  Human-in-the-loop; “subliminal control”; can be over-ridden Eases workload and increases airspace capacity

6HONEYWELL SP_Oct 2006 ERASMUS Objectives – 3 applications Subliminal control ATC Autopilot Enhanced MTCD Not Applicable Human decision (ultimate control in any cases) Machine decision High Low High Full automation path Low Courtesy of Eurocontrol

7HONEYWELL SP_Oct 2006 Future Research 4D Trajectory prediction and downlink to ATC Optimal flight path generation for aircrafts in sector - CD&R - “Green” ATM 4D Trajectory negotiation - Air-to-ground - Air-to-air Dovetails with Required Time of Arrival (RTA), Required Navigational Performance (RNP) RTA Region of RTA Speed Adjustment Cruise Descent Mach Descent CAS T/D RTA Decel First Constraint or Speed Transition Region of Off-Idle Descent T/D