Overview of Reg. 216. Overview of Reg. 216. Visit www.encapafrica.org2 What is Reg. 216?  Sets out USAID’s pre-obligation EIA process for new activities.

Slides:



Advertisements
Similar presentations
USAID Environmental Procedures [DATE][SPEAKERS NAMES]
Advertisements

PROJECT RISK MANAGEMENT
The Environmental Status Report for PL 480 Title II Activities.
Program Alternatives under 36 CFR Part 800 Dave Berwick Army Affairs Coordinator Advisory Council on Historic Preservation.
Writing a Preliminary Assessment (The example of the Environmental Review Report) [DATE][SPEAKERS NAMES]
USAID Africa Bureau EIA Procedures for Sub-Projects
2009 CDBG/CHIP Recipients’ Workshop Welcome to the COMPLIANCE SESSION ENVIRONMENTAL REQUIREMENTS Afternoon session will cover new CHIP FEDERAL LABOR STANDARDS.
Basic Concepts for Assessing Environmental Impacts [DATE][SPEAKERS NAMES]
USAID Environmental Procedures. EA Training Course 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific example of.
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Complying With The Federal Information Security Act (FISMA)
SPECIAL CONSIDERATION FOR PESTICIDES Jim Hester Agency Environmental Coordinator.
Involuntary Resettlement 0P 4.12: Financial Intermediaries and Resettlement Planning Instruments.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
Why Assess Environmental Impacts? The Big Picture Why does environment matter?
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Page CDBG Recipients' Workshop Community Finance Division NEPA Environmental Procedures.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
Environmental Review of the Use of Pesticides in USAID Projects: Rationale & Approaches.
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
What If I Have to Go Beyond an IEE?. EA Training Course Tellus Institute 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs)
Integrating Environmental Management Plans into Project Operational Manuals Agi Kiss Safeguards Training Workshop, Chisinau, Oct 28-31, 2008.
Positive Train Control Infrastructure: Section 106 Review Process under the Advisory Council on Historic Preservation’s May 2014 Program Comment For More.
Environmental Procedures Best Practices Review STRENGTHENING MISSION ENVRONMENTAL COMPLIANCE & PROJECT OUTCOMES.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Safeguard Training Workshop Zagreb, Croatia May 7, 2009 Ruxandra Floroiu (Environmental Engineer)
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Practice with Screening & Getting started with the Environmental Procedures Training Manual (EPTM) [DATE][SPEAKERS NAMES]
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
Writing the IEE (EPTM Chapter 4). EA Training Course Tellus Institute 2 Writing the IEE IEE Review  Used when at least one screening outcome is “IEE.
Office of International Research, Education, and Development, Virginia Tech Initial Environmental Evaluations & PERSUAPs Michael J. Mulvaney Assistant.
Tier I: Module 5 CERCLA 128(a): Tribal Response Program Element 4: Verification & Certification.
ADS 204 – Environmental Procedures. EA Training Course Tellus Institute 2 USAID ADS 204  Authority  Objective è Environmental sustainability.
Streamlining NEPA for Reusable Launch Vehicles Federal Aviation Administration Associate Administrator for Commercial Space Transportation May 2004.
22 CFR 216: Environmental Impact Assessment Jim Hester Agency Environmental Coordinator.
1 Exceptional Events Rulemaking Proposal General Overview March 1, 2006 US EPA.
USAID’s Environmental Procedures: The Big Picture.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
YMEP Environmental Training Overview of Training Program Four Modules: 1.USAID Environmental Guidelines Purpose and Overview 2.Environmental Screening.
USAID Environmental Guidelines Purpose and Overview
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Pointers and Pitfalls A guide to successful & effective IEEs [DATE][SPEAKERS NAMES]
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Practice with Screening & Getting started with the on-line IEE Assistant.
UNDP Guidance for National Communication Project Proposals UNFCCC Workshop on the Preparation of National Communications from non-Annex I Parties Manila,
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
Writing a Preliminary Assessment (The example of the Initial Environmental Examination) [DATE][SPEAKERS NAMES]
Resources for ESDM & Env. Compliance. ESDM and Env. Compliance Resources. Visit 2 All are available via... Key resources already introduced:
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
22 CFR 216 & Pesticides Andrei Barannik REA/asia & OAPA.
USAID Environmental Procedures applied to Subgrant or “Umbrella” projects.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
Implementation of FAO Environmental Impact Assessment Guidelines in the new FAO project cycle Alemneh Dejene Climate Impact, Adaptation and Environmental.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Required Documentation: Determination and Overview (EPTM Chapter 3)
What If I Have to Go Beyond an IEE?. EA Training Course 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs) How Do I Prepare.
FACM Training: Fumigation
5. Impact assessment world café: Pesticide use
Pointers and Pitfalls A guide to successful & effective IEEs Andrei Barannik REA/Asia & OAPA & Middle East.
3. Regulation 216: process and documentation
Environmental Impact Assessment:
National Environmental Policy Act (NEPA)
Exceptional Events Rulemaking Proposal
Pointers and Pitfalls A guide to successful & effective IEEs
Strategic Environmental Assessment (SEA)
Practice with Screening & Getting started with the Environmental Procedures Training Manual (EPTM) [SPEAKERS NAMES] [DATE]
Basics of Environmental Impact Assessment
Presentation transcript:

Overview of Reg. 216

Overview of Reg Visit What is Reg. 216?  Sets out USAID’s pre-obligation EIA process for new activities  Applies to:  All USAID programs or activities, (including non-project assistance.)  Substantive amendments or extensions to ongoing activities Reg. 216 is a FEDERAL REGULATION, not just an agency policy. Compliance is mandatory. !

Overview of Reg Visit Reg 216 Origin and Timeline U.S. National Environmental Policy Act (NEPA) becomes law on 1 Jan. (First national EIA requirements in any country.) Exec. Order requires all U.S. agencies to consider environmental impacts of actions abroad CFR 216 revised and finalized A generation of implementation. Current challenges: Satisfy host country environmental procedures without duplicating effort. Implement procedures effectively at the SO level Integrate into contracting, project management US NGO sues USAID over negligent pesticide use USAID develops environmental review procedures for all activities Post-1980

Overview of Reg Visit Review of the EIA Process Screen the activity Based on the nature of the activity what level of environmental review is indicated? Conduct a Preliminary Assessment A rapid, simplified EIA study using simple tools (e.g. the USAID IEE) ACTIVITY IS OF MODERATE OR UNKNOWN RISK SIGNIFICANT ADVERSE IMPACTS POSSIBLE SIGNIFICANT ADVERSE IMPACTS VERY UNLIKELY ACTIVITY IS LOW RISK (Based on its nature, very unlikely to have significant adverse impacts) ACTIVITY IS HIGH RISK (Based on its nature, likely to have significant adverse impacts) Phase II Phase I Understand proposed activity Why is the activity being proposed? What is being proposed? BEGIN FULL EIA STUDY STOP EIA process

Overview of Reg Visit Reg 216: The big picture Increasing risk/impact Most activities are cleared with: Like any EIA system, Reg. 216 features a tiered review system to focus review effort where it is needed. Categorical Exclusion Initial environmental examination Activities specified by the regulation as having minimal environmental impact A much shorter, simpler version of a full EIA study Full EIA Requires a professional team, 2+ person months Reg 216 specifies that an IEE must reach 1 of 2 decisions: Positive determination, (significant impacts likely, do full EIA) Negative determination, (no significant impacts, proceed with activity)

Overview of Reg Visit Screening under Reg Is the activity an EMERGENCY? NO 2. Is the activity VERY LOW RISK? 3. Is the activity HIGH RISK? Prepare Initial Environmental Examination (IEE) NO YES start Screening results & their meaning “EXEMPTION” No environmental review required, but anticipated adverse impacts should be mitigated “CATEGORICAL EXCLUSION” In most cases, no further environmental review is necessary. ATTENTION: You probably must do a full Environmental Assessment (EA) or revise the activity (or not yet clear) Prepare Environmental Assessment (full EIA study) Allowed by Reg. 216 But not recommended recommended

Overview of Reg Visit USAID Screening Categories: Exemptions 1. Is the activity an EMERGENCY? YES start TO ANSWER “YES”, THE ACTIVITY MUST MEET THE REG’S DEFINITION OF “EXEMPTION” !

Overview of Reg Visit USAID Screening Categories: Exemptions “Exempt” activities often have significant adverse impacts. Good practice requires mitigating these impacts, where possible. ! 1.International disaster assistance 2.Other emergency situations requires Administrator (A/AID) or Assistant Administrator (AA/AID) formal approval 3.Circumstances with “exceptional foreign policy sensitivities” requires A/AID or AA/AID formal approval Under Reg 216, EXEMPTIONS are ONLY...

Overview of Reg Visit USAID Screening Categories: Categorical Exclusions 1. Is the activity an EMERGENCY? NO 2. Is the activity VERY LOW RISK? YES start TO ANSWER “YES,” THE ACTIVITY MUST MEET THE REG’S DEFINITION OF “CATEGORIAL EXCLUSION” !

Overview of Reg Visit USAID Screening Categories: Categorical Exclusions 1.Education, tech. assistance, training 2.Documents or information transfers 3.Analyses, studies, academic or research workshops and meetings 4.Support to intermediate credit institutions where USAID does not review loans 5.Nutrition, health, family planning activities except where infectious medical waste is generated Under Reg. 216, ONLY a specific set of activities may receive categorical exclusions... No categorical exclusions are possible when an activity involves pesticides ! And certain other situations where USAID does not have direct knowledge or control Note: see 22 CFR 216.2(c)(2) for full list

Overview of Reg Visit USAID Screening Categories: EA Typically Required 1. Is the activity an EMERGENCY? NO 2. Is the activity VERY LOW RISK? 3. Is the activity HIGH RISK? NO YES start TO ANSWER “YES,” THE ACTIVITY WILL USUALLY BE ON THE REG’S LIST OF ACTIVITIES “FOR WHICH AN EA IS NORMALLY REQUIRED” !

Overview of Reg Visit USAID Screening Categories: EA Typically Required Penetration road building or improvement Irrigation, water management, or drainage projects Agricultural land leveling New land development; Programs of river basin development Large scale agricultural mechanization Resettlement Powerplants & Industrial plants Potable water & sewage, “except small-scale” Under Reg. 216, the following activities USUALLY require a full environmental assessment AND... Reg. 216 does not specify scales for these activities. !

Overview of Reg Visit USAID Screening Categories: EA Typically Required 1.Activities involving procurement or use of logging equipment. 2.Activities with the potential to significantly degrade national parks or similar protected areas or introduce exotic plants or animals into such areas. Sections 118 & 119 of the Foreign Assistance Act require an EA for... Reg. 216 allows you to proceed directly to an Environmental Assessment for these activities. However, we recommend doing a preliminary assessment (IEE) first. ! AND...

Overview of Reg Visit Review: Screening under Reg Is the activity an EMERGENCY? NO 2. Is the activity VERY LOW RISK? 3. Is the activity HIGH RISK? Prepare Initial Environmental Examination (IEE) NO YES start Screening results & their meaning “EXEMPTION” No environmental review required, but anticipated adverse impacts should be mitigated “CATEGORICAL EXCLUSION” In most cases, no further environmental review is necessary. ATTENTION: You probably must do a full Environmental Assessment (EA) or revise the activity (or not yet clear) Prepare Environmental Assessment (full EIA study) Allowed by Reg. 216 But not recommended recommended

Overview of Reg Visit What documentation is required?  The outcome of your screening process determines the documentation you must submit: Overall screening resultsEnvironmental documentation required All activities are exemptNone* All activities are categorically excluded Categorical Exclusion request* All activities require an IEEIEE covering all activities* Some activities are categorically excluded, some require an IEE An IEE that*:  covers activities for which an IEE is required AND  Justifies the categorical exclusions *plus a Compliance facesheet

Overview of Reg Visit Basic Reg. 216 compliance documents Initial Environmental Examination 1. Goals and purpose of project; list of activities 2. Baseline information 3. Evaluation of potential environmental impacts 4. Recommended findings, mitigation & monitoring Request for Categorical Exclusion 1.Goals and purpose of project: list activities 2.Justification for a Categorical Exclusion (must cite the appropriate section of Reg. 216.) The IEE is USAID’s “preliminary assessment” The RCE is a simple document used when ALL activities are “low risk” A “facesheet” accompanies both the IEE & the CatEx Request 1 2 3

Overview of Reg Visit No activities may be implemented without APPROVED Reg. 216 environmental documentation in hand. ! must satisfy additional requirements via a Pesticide Evaluation Report and Safe Use Action Plan (PERSUAP) IEEs for activities involving pesticides...

Overview of Reg Visit What does “approved” mean?  Both IEEs and RCEs must be cleared at the Mission Level & by the BEO  BEO concurrence not automatic or guaranteed  Back-and-forth dialogue is sometimes required Clearances: SO team leader MEO Regional Environmental Advisor (optional for T II) Mission Director Concurrence Bureau Environmental Officer Approval General Counsel Who signs?

Overview of Reg Visit Be aware... Consult with the MEO/BEO/ REA on difficult issues BEFORE submission. Submit a quality IEE (coming up) To avoid rejection or delay of IEEs, RCEs.. Categorical exclusions exist AT THE DISCRETION of the BEO !

Overview of Reg Visit An IEE is a likely result of the screening process... The most common screening result (particularly for the AFR portfolio) is that an IEE is required. The IEE is USAID’s “preliminary assessment” What is the purpose of a preliminary assessment? ?

Overview of Reg Visit Review: Purpose of the Preliminary Assessment Screen the activity Based on the nature of the activity what level of environmental review is indicated? Conduct a Preliminary Assessment A rapid, simplified EIA study using simple tools (e.g. the USAID IEE) ACTIVITY IS OF MODERATE OR UNKNOWN RISK SIGNIFICANT ADVERSE IMPACTS POSSIBLE SIGNIFICANT ADVERSE IMPACTS VERY UNLIKELY ACTIVITY IS LOW RISK (Based on its nature, very unlikely to have significant adverse impacts) ACTIVITY IS HIGH RISK (Based on its nature, likely to have significant adverse impacts) Phase II Phase I Understand proposed activity Why is the activity being proposed? What is being proposed? BEGIN FULL EIA STUDY STOP EIA process

Overview of Reg Visit Purpose of the IEE Provide documentation and analysis that: Allows the preparer to determine whether or not significant adverse impacts are likely Allows the reviewer to agree or disagree with the preparer’s determinations Sets out mitigation and monitoring for adverse impacts Like any preliminary assessment the purpose of the IEE is to... What determinations result from an IEE?

Overview of Reg Visit RecommendationReg. 216 terminology Implications (if IEE is approved) No significant adverse environmental impacts NEGATIVE DETERMINATION Activity passes environmental review With specified mitigation and monitoring, no significant environmental impacts NEGATIVE DETERMINATION WITH CONDITIONS The activity passes environmental review on the condition that the specified mitigation and monitoring is implemented Significant adverse environmental impacts are possible POSITIVE DETERMINATION Do full EA or redesign activity Not enough information to evaluate impactsDEFERRAL You cannot implement the activity until the IEE is finalized  For each activity addressed, the IEE makes one of 4 recommendations regarding its possible impacts: Recommended Determinations in the IEE

Overview of Reg Visit Note: If a “negative determination with conditions” is approved, those conditions become REQUIRED parts of project implementation & monitoring !

Overview of Reg Visit Applying Reg. 216 at the SO level  Reg. 216 was written with the idea that it would be applied at the project or activity level  Most IEEs are written at the SO level (in fact, all SOs require approved env documentation)  To make MEO, BEO workload more managable  To better consider environmental issues early in program design  The success of SO-level IEEs depends on:  Mitigation and monitoring conditions successfully transferred to projects (e.g., written into contractor/partner SOWs)  Effective implementation of sub-project review where required