ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson Frame Analysis Davis Moore Punit Dave Attenuator Shauna.

Slides:



Advertisements
Similar presentations
The Green Team is the Biggest Loser! By Student A Student B Student C Student D.
Advertisements

Design of a Baja SAE Vehicle
Filament Winding Machine. Project Name – Filament Winding Machine Project Number – P09226 Project Family – Competitive FSAE Autosports Systems Project.
ODU Formula SAE MAE 435 Midterm Report
ODU Formula SAE MAE 435 Final Report 4/23/13. Introduction Charles Pearson The 2013 Michigan FSAE Competition Competition Scoring: Static Events o Design.
Vacuum Vessel Production Readiness Review
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
Team members Duc Le Ron Pahle Thanh Nguyen Khoa Tran Sponsor Edwards Vacuum Ltd. Advisor Dr. Dave Turcic.
Fuel Cell Modeling Team Members: Albert Wong Faculty Advisor: Dr. Blekhman Department of Computer Science and Technology College of Engineering, Computer.
Mini-Baja Advisory Presentation April 27, 2007 Quentin Holmes Chris Meyer.
Members: Rob Brown Scott Cone Thuc Le Brandon Wilen David Winkleman Advisor: Dr. Turcic.
Development of the Mechanical Battery Texas A&M University – Kingsville Javier Lozano – MEEN Senior Luis Muratalla – MEEN Junior Eli Hatfield – EEEN Sophomore.
P09221: Innovative Composite Parts for a Formula SAE Racecar Team Members: David Holland Theodore Kusnierz Anthony Salvo Ryan Baldi Charles Thomas Martin.
P09221: Innovative Composite Parts for a Formula SAE Racecar Team Members: David Holland Theodore Kusnierz Anthony Salvo Ryan Baldi Charles Thomas Martin.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Finite Element Method Final Project “ Rear Suspension- Double A- Arms” Jaime Taha T.April 29 th 2003.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management.
Combined Loading Test Perform Bending Only Test to obtain Elastic Modulus and Poisson’s Ratio Compare the materials properties Perform Combined Loading.
GROUP MEMBERS: JOHN MERRITT FRANCES OTHERSEN CHRIS DAVIS JAMES CHAPMAN JOSEPH FANNING Baja SAE ® Series 2015 Status Update.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
SAE Brake Friction Materials Chemical Analysis Methodology Taskforce Update to BMC Greg Vyletel Meritor, Inc.
Team 14: The Design and Construction of an Ackerman-Steered Robot Members: Kyle Quinn Julio Sosa Robert Steel.
Team 4 “Flying Wind Turbine” Jason Landry Bryan MacDonald Scott Montgomerie Daniel Pollock Robert Ringrose Dr. Dale Retallack Team Members Supervisor.
ANKLE POSITIONING AND LOAD DEVICE Faculty Advisors: Dr. Stacie Ringleb and Dr. Sebastian Bawab Vasile Grigorita Dominick Hudson Jin Hyuk Kim Bryan Mazac.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
Adaptation of Van with a Wheelchair Lifting System Group Eight Members: Bill Fotoples- Team Leader Chad Wainscott- Technical Liaison/Web Page Specialist.
CON 4003 Construction Estimating Prof R. V. Locurcio.
ELENA – Electron Cooler Vacuum design Benjamin Moles March 26 th 2015 on behalf of Electron Cooler team : Gerard Tranquille Jean Cenede Lars Soby Lars.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
Suspension D.J. Conroy.
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
ODU Formula SAE MAE 435 Midterm Report.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
Lesson No. 07 Week No. 04 Lesson Name Hacksaw Frame & Blade.
Pedibus Team 22 Team Members: Kyle Anderson Stephen Avery Alejandro San Segundo Brett Willenbacher Team No.22 Slide 1 of 15 Alejandro San Segundo Midterm.
The Great Team1 Week 8 : Engineering Analysis Bunk Bed Converter Adam Brown Blaine Gardner Sarah Gleaton Jimmy Jiang Addisu Lemlem Lee Tschaepe 7/12/2006.
INTEGRATED DESIGN SYSTEM  AUTOCAD  STAAD  STR. DESIGN SYSTEM  MICRO SOFT EXCEL.
University of Alabama Formula SAE 2005 Presentation Event Thursday, May 19 th, 2005.
CON 4003 Construction Estimating Prof R. V. Locurcio.
K-12 Teaching Application Support and Software Ongo-08 Client Dr. John Lamont Prof. Ralph Patterson Advisor Dr. Gregory Smith Team Members Sean Boyle Tony.
COMBINED LOADING.  Analyze the stress developed in thin-walled pressure vessels  Review the stress analysis developed in previous chapters regarding.
VirtuLab: Web- Based Flow Visualization Facility Project Update Group Members: Sydni Credle Karen Davis Justin Scott Professor:Mentor: Dr. LuongoDr. Shih.
ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson Element Analysis Davis Moore Punit Dave Attenuator Shauna.
2015 SAE Aero Design East Team
MAE 435 Progress Report Team: Formula SAE Due Date: 2/8/2016 Advisors: Dr. Bawab; Nathan Luetke Presenter: Ryan P.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
Six Sigma Project Coding Performance Improvement Project Global Communication, Inc.
BALLS OF STEEL Ben Petersen Chris Bowland Matt Jones.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
Development of a Mechanical Battery Texas A&M University - Kingsville Luis Muratalla – MEEN Senior Jonathan Boehm – CEEN Sophomore Gary Garcia & Richard.
WyoBaja 2011 SAE Mini Baja Competition Team Leader Suspension Frame
Steel Fabrication & Erection of Belle Chasse Primary School ET-493 Final Proposal Spring 2015 Instructor: Chris Koutsougeras Advisor: Edward Rode’ Derek.
Suspension Cody Dykman Jesse Ramer Jesson Salyards Frame Warren Starbuck Brett Schuler Doug Romoth Drive Train Josh Voorhees Corey Saner Spencer Garland.
DRY TREATMENT STANDARD
Complementary ISTC Projects #3888, 3889p
Tilt N’ Store Design Analysis
ODU SAE FORMULA MAE 435.
MAE 435 Progress Report 28 March 2016
Name: Project: MSD IT – December 2017
SAE Baja Senior Design Project
DS595/CS525: Urban Network Analysis Prof. Yanhua Li
Knee Loading Device Status Update 2
Tilt N’ Store Design Analysis
Chapter 14: Research Synthesis (Meta-Analysis)
Name: Project: MSD IT – December 2017
LCLS Vacuum System Plans (July 07)
Mechanics of Materials Engr 350 – Lecture 39 What’s On the Final Exam?
Presentation transcript:

ODU SAE FORMULA MAE 435

Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson Frame Analysis Davis Moore Punit Dave Attenuator Shauna Richards Carbon Fiber A-arms Dan Gregor Aaron Vandegraff

Overview Schedule Frame Analysis Attenuator Carbon Fiber A- Arms Conclusion

Schedule

Frame Computer Analysis Complete! Actual Testing of Main Hoop Hard Test starts Nov. 19 th using strain gauges Horizontal bending Longitudinal Torsion

Frame continued Quality Assurance 2 of 4 QA tests complete Weld Quality, (in progress) 37 of 42 test sites completed 8 unsat, (Being Fixed) QA still in progress Welding finished soon Wall Thickness (Pending) Alternative Frame Rules, (50% done) Proposed Method based on Hard analysis results.

Attenuator Materials Difficulty Estimated ship time 2 days Changed to 2 weeks! New Material Galvanized Steel 25 mm thickness, 1” cell size Current Status Fabrication completed! Soft Testing calculations altered Hard Testing moved to next week

Carbon Fiber A-arms Actual testing of assembly, Nov. 9 th Verify will meet track conditions Destructive testing required for 1000 lbs Going to complete testing and fully analyze, SF=1.2

Conclusion Frame  Weight test Nov 19 th Attenuator  Drop test next week A-Arms  Pull tests Nov. 9 th Complete the paper!

Questions?