Survey techniques for experiments and advanced 3 D Digital Reconstruction Aurelie Maurisset, Christophe Bault, Andrea Catinaccio October 1 st 2010 Ref.

Slides:



Advertisements
Similar presentations
WP7 ATLAS ID Barrel End Services T.J.FRASER UCL Aim: Using experience gained from work on the current ATLAS SCT Barrel, attempt an improved design and.
Advertisements

SPEARHEAD LASER SCANNING. SUNCOR FERRIER BATTERY #1 Complete laser scan plus the new tanks and piping added into the scan.
30 Juin 2009C.BAULT1 REVERSE ENGINEERING BY LASER SCANNER 3D What is Reverse Engineering? Several kinds of measure instruments Tests done on a mockup Scan.
CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
Warship 2010 The Application of Integrated Computing Technology to the Design, Construction and Lifecycle Support of Warships The Royal Institution of.
Stephen Gibson, ATLAS Offline Alignment, 2 nd July Incorporating FSI with the Offline Alignment Overview ATLAS Group, University of Oxford Stephen.
S. M. Gibson, IWAA7 November ATLAS Group, University of Oxford, UK S. M. Gibson, P. A. Coe, A. Mitra, D. F. Howell, R. B. Nickerson Geodetic Grids.
Virtual Engineering Lab Faculty of Engineering – Cairo University Construction Management Applications January 11 th 2010.
CERN, the 9th of Nov FEA Updates on Structures (overall ID model) University of Geneva: G. Barbier, F. Cadoux, A. Clark, D. Ferrère, M. Weber.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Photo Realistic 3D Cloud of Points
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Services Product design Concept design
CAD services for mechanical integration of large experiments Tatiana KLIOUTCHNIKOVA Introduction to a discussion aiming to collect comments and.
AIDA Infrastructure for very forward calorimeters Design proposal Mechanical support structure Designers:In collaboration with: Eric DavidFrancois-Xavier.
Virtual reality. Tasks 3D digital model from planes 3D digital model of existing objects Office work Field observations Solid modeling Photogrammetry.
Tracking Integration Challenges Y. meeting 2013/9/25.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
Infrastructure for LHCb Upgrade workshop CAD integration EDMS: February 2015.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
© 2013 Autodesk Autodesk ® ReCap ™. © 2013 Autodesk What is Reality Capture? Reality capture is the process of taking the analog world around us and putting.
Unclassified U.S. ARMY TANK AUTOMOTIVE RESEARCH, DEVELOPMENT AND ENGINEERING CENTER Reverse Engineering Re-defined Requirements TARDEC 25 AUG Presented.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
Photogrammetry for Large Structures M. Kesteven CASS, CSIRO From Antikythera to the SKA Kerastari Workshop, June
Automated Reconstruction of Industrial Sites Frank van den Heuvel Tahir Rabbani.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 Pixel Detector General –July Evidence of galvanic corrosion in EU barrel cooling tubes. Recovery plan implemented, this problem now solved but…..
A. Behrens BE-ABP-SU-EM 1 Forum on Tracking Detector Mechanics 04 July 2012 Survey and Large Scale Metrology of Tracking Detectors for LHC Experiments.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
How 3D models and photos are organized in the database ADO-PO meetingTatiana KLIOUTCHNIKOVA.
2 nd PH-DT Training Seminar CERN TODAY An introduction to rapid prototyping techniques by C.Bault, PH-DT-EO NEXT on 3 th October at 11:00 Overview.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Laser Notcher Status Dave Johnson PIP Meeting June 26,2012.
UPDATE ON ID INTEGRATION Alice TB, E.Rosso ALICE TECHNICAL BOARD CERN, Ettore Rosso / CERN 1. 3 rd Cone 2. V0_L and Si_3 support 3.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Lukasz Krzempek TE-VSC-DLM 28th WP8 Bi-weekly meeting Tuesday, 24 November 2015 Vacuum layout (Experimental side)
9th July 2009Christophe BAULT1 REVERSE ENGINEERING: TEST OF CATIA CMS Tracker mock-up scanned with Faro Laser Scanner CMS Tracker mock-up scanned with.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
SURVEY EXISTING TECHNIQUES AND REQUIREMENTS Jean-Christophe GAYDE, Pascal SAINVITU (CERN EN-MEF-SU-EM) Infrastructure For LHCb Upgrade Workshop February.
R ADIATION P ROTECTION ASPECTS LSS1 - TAN REGION Cristina Adorisio (CERN - DGS/RP)
Comments on Engineering talk by A. Catinaccio at Inner Tracker Engineering Meeting CERN ) Fixed length barrel layout drawing by C. Bault (Strawman.
AIDA 1 Mezzanine board Resistors and capacitors near the ASiCs have now been relocated to the underside of the PCB. Cooling pads have been extended.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
DT News CJ Survey techniques for experiments and advanced 3D Digital Reconstruction Andrea Catinaccio, Aurelie Maurisset, Christophe Bault DT Science-Techno.
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
Approach for Large Scale Metrology for
Application Presentation
LBNF CAD models, Drawings and Component list
INSTALLATION SEQUENCE
Preliminary Y-chamber specifications – First draft
WP9 ITS Mechanics and Cooling
Mini-drawers, FE-ASIC , Integrator
Services Layout – Update
On the accuracy of port assembly at Wendelstein 7-X
3d Model integration from design to inspection and construction
Engine Part ID Part 1.
Engine Part ID Part 2.
Engine Part ID Part 2.
Application Presentation
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
Presentation transcript:

Survey techniques for experiments and advanced 3 D Digital Reconstruction Aurelie Maurisset, Christophe Bault, Andrea Catinaccio October 1 st 2010 Ref. CERN-PH, options for future common projects in Mechanical Engineering:

A. Catinaccio - CERN2 Introduction Aurelie will present: standard survey and new laser scanning techniques for experiments A long and essential collaboration with the Survey team (BE-ABP) throughout the years of construction and installation of our detectors. Christophe will present: application examples of the laser point cloud and CAD reconstruction As a brief introduction I will show a typical application of survey to build and install a detector - and how we came to new requirements for surface scanning / reverse engineering techniques (3D).

Sequence of Assembly & Survey of the Atlas ID Barrel ASIC power 5.3 W FEA A. Catinaccio - CERN3

Adjustment and positioning by external references (theodolite and photogrammetry) ASIC power 5.3 W FEA A. Catinaccio - CERN4 Atlas ID barrel installation

Several other applications - measurements needed for Integration and Installation 5

6 ID EC’s Installation: 1 st creation of virtual envelope By Photogrammetry and Romer arm

Virtual positioning and probing (envelope of the front IDEC-A re-constructed) A. Catinaccio - CERN7 ID EC’s Installation: 2 nd installation of virtual envelope ~ 3D scan

A. Catinaccio - CERN8 For future interventions and upgrades Document as installed services Define an envelope for cables and pipes Visualize free space for future routing Accuracy: 1…2mm

A. Catinaccio - CERN9 Laser Scan of services on the flange Feb. 2009

A. Catinaccio - CERN10 Scan of services on the flange Photo Laser scan

Laser scan of ID services