High Efficiency Home with full Warehouse/Guesthouse and Cabana House By: Sutton Yanosky.

Slides:



Advertisements
Similar presentations
Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
Advertisements

The Unit Owners Association of the Madison, A Condominium Building Revitalization (Work Completed & Upcoming Work)
East Hampton High School July 2013 – July 2014 Design Phases.
Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Measuring Carpentry and Miscellaneous Items
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Skyscraper Construction
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Grimsby Secondary School
Civil Engineering & Architecture 2.3 Residential Design.
Architectural Drawing
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Robert Adkins Et 494 Instructor: Dr. Cris Koutsougeras Advisor: Mr. Rode 12/04/2013.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Estimating Waste Week 3 CTC-415. What is waste Waste is material that needs to be supplied but may not be used All material items except steel beams and.
Steel Building Apartment- Design and Build
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Single Family Homes in the Shenandoah Valley Va, Florence Ave Waynesboro, Class Sq.Ft. Zip 244.
Rocky River Design and Engineering Academy Drafting Technology Related Course Offerings Instructor: J. S. Gretsuk.
Sutton Yanosky ET 493 Dr. Cris Koutsougeras Advisor : Ed Rode.
Instructor: J. S. Gretsuk.  24 state of the art computers  Drafting table work stations  Laser Printer  Color Plotter  Blueprint Machine.
Constructing Homes and Other Buildings
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
A group of friends recently took a vacation at one of New York’s Finger Lakes and Shortly After decided to invest in a newly built and furnished home.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Finishing the Building
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Construction Drawing Occupational Safety and Fundamentals
HOME MODEL. P e r s p e c t i v e HOME MODEL 4.00m X 5.50m Floor Area = 22 sqm. Turn-over unit 4.00m 5.50m 1.4m 4.00m.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
 Overview of Interior Finishes  Types  Examples.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Orthographic Drawings
IET 120 CONSTRUCTION PROJECT Name: Jesse Webb-Greenhill.
Building Your Future with Mountain Peak Homes Corinne T. Moritz Bella Vista Subdivision, Mountain Peak Homes1.
Turtle Creek Apartment Project Update Able Construction September 15, 1999.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
Introduction to Building Trades Denver High School.
BUILDING A BETTER ESSAY: BLUEPRINT TO HOUSEWARMING.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Eps: Campus rainworks challenge
Foundations of Technology Construction
Major Steps In Building a SFR
Tucson Amateur Astronomy Association
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Upcoming Activities Fun Fact Click here to view the live WEBCAM
Design of a Commercial Shopping Center
Multistory Office Building
Design of a Commercial Shopping Center
Multistory Office Building
Chapter 10 Construction Basics.
Southampton Our cottage/retirement home: The house construction phase
House Construction Budget Plan
Foundations of Technology Construction
Minuteman Vocational Technical Regional High School Progress
© OnCourse Learning.
Trillo Apparel Company Revised Delivery Plan
Multi-Family Fourplex Apartment
Community Practice Asset Management.
Presentation transcript:

High Efficiency Home with full Warehouse/Guesthouse and Cabana House By: Sutton Yanosky

Project and Overall Objectives My project will be the development of a high-efficiency home from top to bottom. The owner has a location and has already met with a team of engineers, architect and the parish executives, confirming all building permits that will be necessary throughout the project duration. All necessary funding is already in place for the entire project. My duties in this project will be to act under the general contractor as an assistant project manager for the building I will also be performing much of the actual manual labor during the job process. I will form structural connection details, site plans, foundation details and more for the project using AUTOCAD 2013 software. In addition I will form multiple materials lists for each phase of the project and use Excel and Primavera software to form accurate scheduling and project management techniques to keep the project on pace for completion by the project deadline. I will also use techniques for project management learned in previous classes by executing project network analysis techniques, as well as linear programming methods to monitor project costs versus a final project budget proposal. I will complete all necessary architectural drawings for the addition buildings structures (Apartment and Cabana area). All funding is already accompanied for by the builder.

Initial Clearing Stages- Find home location deep into the woods

BUILDING PHASES Site Plan Foundation Framing (Exterior Concrete) All other Framing Exterior Finish Plumbing HVAC Electrical Insulation (Vapor Barrier) Drywall Interior Finish Landscape Move in/close

Location was found December 2013 House location is about 600 feet into woods About 3 acres were cleared and the slab area was built up and prepped for pour and framework Land clearing begun shortly after home location was found in early January 2014.

Prepping for Slabwork

Slab Pour Day and Night, Jan 2014

House Slab Pour The slab was poured all in one very long day. Pump trucks ran in and out until almost 11 p.m that night. This slab was a monster, with enormous beams and footings Project slab material totaled over 215 cubic yards of concrete.

Up-to-date Project Details Site plan, blueprints, grade surveying and temporary electrical hook-up have all been established. (January 2014). Foundation Phase - currently in progress Concrete slab and wall foundation are in the process of build.

Concrete Structural Walls Phase 1

Exterior Concrete walls Framework

Tasks to perform Spring 2014 This Semester Duties Develop full project schedule and timeline Attain all necessary permits for project Use CAD to draw up header/beam/truss/steel- to-concrete connection details/openings schedules Formulate Materials take off list for each phase of the construction process Contact various sub- contractors and get quotes to compare project phase pricing. (Electrical,Plumb,HVAC, etc) Work with and ahead of contractors to order materials needed for upcoming deadlines. Formulate cost estimate for overall project as well as a monthly update towards budget. Begin design phase of poolside cabana and apartment structures.

Fall Form Hard/Soft Project Cost Analysis 2. Cost Savings Analysis estimate of money saved using specialized materials and working independently of private contractors 3. House completion total cost estimate 4.Begin next project – Guest House and Pool House/Cabanna Structure Begin project management aspects of guesthouse and cabanna/pool yard construction. Attain building permits if needed Draw up necessary project on CAD with all necessary details Form project schedules and charts Form material take-offs for both new projects Form cost estimate for materials and for total job. Overall Combined Project Completion timeline, material take off and cost estimate.

Schedule January 2014 – Find house location and attain building permits Jan-Feb 2014 – Clear and prepare lot for foundation and build. February 2014 – Finish foundation and begin exterior concrete walls Set steel post and beam in proper location to hold 2 nd floor weight. (W-Beams) March (5-10) – Pour and Cure Concrete Walls March (10 – 28) – Frame all interior steel walls and install posts/beams and joists Have materials list for Foundation and steel walls/joists framing. Finish necessary detail drawings for project. Form cost estimate for clearing, foundation and framing phase.

Up to date progress…. Material Take-Off for foundation forming Material List for Foundation Reinforcement and Slab pour. Material list for concrete walls/safe room and porches. Foundation and Slab materials list for Cabana Framing and Joisting Material list for 2 apartment addition

Progress….. Floor plan drawn for apartments and cabana. Foundation plan and foundation details drawn for apartments and cabana. Elevation drawings complete for poolside cabana. Currently working on Cabana framing/roofing materials/price list and ceiling and rafter drawings. (about half way done) Currently working on Interior framing list for main house. (about half done) Plan to complete by end of this week.

Self Assessment It’s a little difficult to truly judge but I would say I am much ahead in some aspects and a little behind on others. The overall building project is behind almost a month from original schedule due to weather and now framing materials had to be custom ordered and are taking longer than expected. Due to this, the job has not had much progress so the 2 additional structures scheduled for later are now being put into action. All the drawings I have completed and material lists for are a good bit ahead of originally planned but as far as the house, I am a couple of weeks behind, but should be able to be caught up by the end of this weekend.

April and May 2014 March 31-April 14 - Complete framing of steel roof system. Have April 14 th -20 th - Dry in Building- all plywood for roofing and tar paper applied. April 21 st -26 th – Complete roof, all shingles, flashing, vents and caps complete Materials list complete and current project cost estimate for Roofing phase. Order all electrical, alarm, doors, windows, concrete sealents, plumbing, HVAC and soffit and fasia framing materials. April 28 th -May 10 th – Finish electrical rough in May 5 th – 11 th – Complete plumbing rough in May 5 th – 11 th – Complete HVAC rough in Get all 3 electrical, HVAC and plumbing inspections. May 11 th -17th th – Finish sealing all exterior concrete walls May 11 th – 17 th – Order all brick supplies and have ready for delivery.

May/June 2014…. May 19 th – 31 st – Begin and finish all soffit and fascia framing and installation. May 23 rd -28 th – Install all exterior windows and doors into building. Produce materials take off list and up-to-date project cost analysis. Include all brick, lentils and masonry orders into May’s materials list. Order all caulk, sanding materials and paints needed for interior. Order all interior openings Order all baseboard, crown moldings, casings and all trim materials for job Hire painter and carpenters. June 2 nd – 14 th – Complete Sheetrock phase ( hanging, finishing and texturing) June 2 nd – 6 th – Install all exterior hose bibs, electrical, plumbing and HVAC pipes or hoses and all necessary touch-ups to sealant before brickers begin. June 9 th – 30 th – Begin and finish brick phase. Complete monthly materials and cost update. Check job status for completion estimation dates compared to initial goal. Hire stucco contractor and all materials to complete soffit.

July 2014 June 30 th – July 4 th – Complete stucco phase of project and install all interior doors. June 30 th - Painters spray base coat throughout home. July 1 st -20 th – complete all trim work, get electrical, HVAC and plumbing hooked up. July 7 th – 26 th – complete painting phase July 28 th – Aug 1 st – get all supplies ordered for flooring, cabinets, counters, sinks, toilets, hardware, fixtures, etc. Complete materials take off for orders Complete updated cost for job. Begin forming plan for guest house and cabana area. Draw foundation details and prep for foundation phase.

August 2014 August 4 th -16 th – Finish flooring in house. August 4 th -8 th – Order and pickup shutter material August 4 th – 8 th – Install all hardware, fixtures, ceiling fans, smoke alarms, exterior lighting,etc, August 11 th -16 th – Install all sinks, toilets and appliances into home. August 11 th -16 th – Order and plan for landscaping phase and dig pond. August 18 th – 22 nd – Make/Paint and install all shutter for entire house. August 18 th – 31 st - Dig fish pond and finish landscaping and laying new grass for new property. Form August material take off and cost estimate.

September 2014 Sept 1 st – 5 th -Finish guesthouse and cabana foundation Sept 1 st -8 th – Install all appliances, Finalize home, and finalize materials and cost estimation sheets. Sept 1srt – 8 th - Estimated cost savings analysis for monthly utilities and overall building savings. Sept 8 th – 13 th – Finish all framing and roofing of cabana. Finish framing and decking of guesthouse. Sept 15 th – 19 th – Finish all plumbing and electrical for cabana, Sheetrock/Finish and texture guesthouse. Sept 22 nd – 27 th – Finish all interior and exterior finishes for cabana – build bar, grill area and finish bathroom. Sept 22 nd – 27 th – Finish all trim work and install all doors and openings. Sept 29 th – October 4 th – Paint the ceilings and floors in the guesthouse Form materials and price estimation for guest house and cabana.

October 2014 Oct 6 th – 11 th Finish guesthouse trim work and final paint coat. Oct 6 th – 11 th – Install all hardware Oct 13 th – 16 th – Install flooring in guesthouse Oct 17 th – 24 th – Install all cabinets and counter tops Order all appliances, sinks, toilets and all other necessary equipment to close project. Oct 17 th – 24 th – Apply all final touch work, paint, trim, etc. Oct 17 th – Hook up final plumbing, HVAC and electrical. Oct 17 th – 24 th – Install and hook up all appliances. Oct 27 th -31 st -Perform final materials take off and cost estimate Oct 27 th – 31 st -Form combined total project costs and materials list for house, cabana and guesthouse. November Finalize project and initiate move it