Appmon: a tool for monitoring of application jobs Current status of T2.1 Subtask: Monitoring of application jobs coordinator: A. Kryukov (SINP MSU), V.

Slides:



Advertisements
Similar presentations
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Introduction to EGEE hands-on Gergely Sipos.
Advertisements

Metadata Progress GridPP18 20 March 2007 Mike Kenyon.
INFSO-RI Enabling Grids for E-sciencE Workload Management System and Job Description Language.
Appmon: a tool for monitoring of application jobs T2.1 Subtask: Monitoring of application jobs coordinator: A. Kryukov (SINP MSU), V. Edneral (SINP MSU),
Grid Resource Allocation Management (GRAM) GRAM provides the user to access the grid in order to run, terminate and monitor jobs remotely. The job request.
CERN LCG Overview & Scaling challenges David Smith For LCG Deployment Group CERN HEPiX 2003, Vancouver.
Workload Management meeting 07/10/2004 Federica Fanzago INFN Padova Grape for analysis M.Corvo, F.Fanzago, N.Smirnov INFN Padova.
A Computation Management Agent for Multi-Institutional Grids
MTA SZTAKI Hungarian Academy of Sciences Grid Computing Course Porto, January Introduction to Grid portals Gergely Sipos
INFSO-RI Enabling Grids for E-sciencE EGEE Middleware The Resource Broker EGEE project members.
1c.1 Assignment 2 Preliminaries Review Full details in assignment write-up. ITCS 4146/5146 Grid Computing, 2007, UNC-Charlotte, B. Wilkinson. Jan 24, 2007.
Introduction to EMF Server Communication and Cases Beta Testing November 4, 2009.
1-2.1 Grid computing infrastructure software Brief introduction to Globus © 2010 B. Wilkinson/Clayton Ferner. Spring 2010 Grid computing course. Modification.
Basic Grid Job Submission Alessandra Forti 28 March 2006.
Asynchronous Web Services Approach Enrique de Andrés Saiz.
Summary of issues and questions raised. FTS workshop for experiment integrators Summary of use  Generally positive response on current state!  Now the.
K. Harrison CERN, 15th May 2003 GANGA: GAUDI/ATHENA AND GRID ALLIANCE - Development strategy - Ganga prototype - Release plans - Conclusions.
Example Gridification via command-line Application Developer Training Day IV. Miklos Kozlovszky Ankara, 25. October, 2007.
Task 6.1 Installing and testing components of the LCG infrastructure to achieve full-scale functionality CERN-INTAS , 25 June, 2006, Dubna V.A.
03/27/2003CHEP20031 Remote Operation of a Monte Carlo Production Farm Using Globus Dirk Hufnagel, Teela Pulliam, Thomas Allmendinger, Klaus Honscheid (Ohio.
1 Overview of the Application Hosting Environment Stefan Zasada University College London.
PanDA Multi-User Pilot Jobs Maxim Potekhin Brookhaven National Laboratory Open Science Grid WLCG GDB Meeting CERN March 11, 2009.
Nadia LAJILI User Interface User Interface 4 Février 2002.
02/07/09 1 WLCG NAGIOS Kashif Mohammad Deputy Technical Co-ordinator (South Grid) University of Oxford.
Stuart Wakefield Imperial College London Evolution of BOSS, a tool for job submission and tracking W. Bacchi, G. Codispoti, C. Grandi, INFN Bologna D.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
Submitting jobs to the grid Argonne Jamboree January 2010 R. Yoshida (revised March 2010) Esteban Fullana.
CERN IT Department CH-1211 Genève 23 Switzerland t Monitoring: Tracking your tasks with Task Monitoring PAT eLearning – Module 11 Edward.
Andrew McNab - GridSite/EDG/GGF - 29 Sept 2003 GridSite, EDG and GGF Andrew McNab, University of Manchester
CHEP03 Mar 25Mary Thompson Fine-grained Authorization for Job and Resource Management using Akenti and Globus Mary Thompson LBL,Kate Keahey ANL, Sam Lang.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Direct gLExec integration with PanDA Fernando H. Barreiro Megino CERN IT-ES-VOS.
MTA SZTAKI Hungarian Academy of Sciences Introduction to Grid portals Gergely Sipos
1 P-GRADE Portal: a workflow-oriented generic application development portal Peter Kacsuk MTA SZTAKI, Hungary Univ. of Westminster, UK.
Getting started DIRAC Project. Outline  DIRAC information system  Documentation sources  DIRAC users and groups  Registration with DIRAC  Getting.
DDM Monitoring David Cameron Pedro Salgado Ricardo Rocha.
V.Ilyin, V.Gavrilov, O.Kodolova, V.Korenkov, E.Tikhonenko Meeting of Russia-CERN JWG on LHC computing CERN, March 14, 2007 RDMS CMS Computing.
US LHC OSG Technology Roadmap May 4-5th, 2005 Welcome. Thank you to Deirdre for the arrangements.
Proposal of interface between GUS + Call Center and Experiments GDB Meeting – Klaus-Peter Mickel GridKa Karlsruhe.
1 Grid2Win: porting of gLite middleware to Windows Dario Russo INFN Catania
EGEE-III INFSO-RI Enabling Grids for E-sciencE Ricardo Rocha CERN (IT/GS) EGEE’08, September 2008, Istanbul, TURKEY Experiment.
INFSO-RI Enabling Grids for E-sciencE GILDA and GENIUS Guy Warner NeSC Training Team An induction to EGEE for GOSC and the NGS NeSC,
Last update 21/01/ :05 LCG 1Maria Dimou- cern-it-gd Current LCG User Registration, VO management and Authorisation Procedures VOMS workshop
Security and Data Sharing Interaction SDSC Auditorium Friday 830a-1000am.
Korea Workshop May GAE CMS Analysis (Example) Michael Thomas (on behalf of the GAE group)
Overview Background: the user’s skills and knowledge Purpose: what the user wanted to do Work: what the user did Impression: what the user think of Ganga.
Daniele Spiga PerugiaCMS Italia 14 Feb ’07 Napoli1 CRAB status and next evolution Daniele Spiga University & INFN Perugia On behalf of CRAB Team.
Client installation DIRAC Project. DIRAC Client Software  Many operations can be performed through the Web interface  Even more to come  However, certain.
Status of Globus activities Massimo Sgaravatto INFN Padova for the INFN Globus group
WP1 WMS release 2: status and open issues Massimo Sgaravatto INFN Padova.
Manchester Computing Supercomputing, Visualization & eScience Seamless Access to Multiple Datasets Mike AS Jones ● Demo Run-through.
EGEE 3 rd conference - Athens – 20/04/2005 CREAM JDL vs JSDL Massimo Sgaravatto INFN - Padova.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks gLite – UNICORE interoperability Daniel Mallmann.
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
David Adams ATLAS ATLAS Distributed Analysis (ADA) David Adams BNL December 5, 2003 ATLAS software workshop CERN.
Grid Activities in CMS Asad Samar (Caltech) PPDG meeting, Argonne July 13-14, 2000.
INFSO-RI Enabling Grids for E-sciencE Ganga 4 Technical Overview Jakub T. Moscicki, CERN.
Mobile Analyzer A Distributed Computing Platform Juho Karppinen Helsinki Institute of Physics Technology Program May 23th, 2002 Mobile.
David Adams ATLAS ADA: ATLAS Distributed Analysis David Adams BNL December 15, 2003 PPDG Collaboration Meeting LBL.
EGI-InSPIRE RI Grid Training for Power Users EGI-InSPIRE N G I A E G I S Grid Training for Power Users Institute of Physics Belgrade.
Client installation Beijing, 13-15/11/2013. DIRAC Client Software Beijing, /11/2013 DIRAC Tutorial2  Many operations can be performed through the.
Geant4 GRID production Sangwan Kim, Vu Trong Hieu, AD At KISTI.
HTCondor-CE. 2 The Open Science Grid OSG is a consortium of software, service and resource providers and researchers, from universities, national laboratories.
Grid2Win: Porting of gLite middleware to Windows platform
BOSS: the CMS interface for job summission, monitoring and bookkeeping
Creating and running applications on the NGS
Brief overview on GridICE and Ticketing System
OMII evaluation: Preliminary results Current status of T6
Patricia Méndez Lorenzo ALICE Offline Week CERN, 13th July 2007
Grid Deployment Board meeting, 8 November 2006, CERN
gLite The EGEE Middleware Distribution
Presentation transcript:

Appmon: a tool for monitoring of application jobs Current status of T2.1 Subtask: Monitoring of application jobs coordinator: A. Kryukov (SINP MSU), V. Edneral (SINP MSU), A. Soukharev (BINP), collab. V. Kalyaev (SINP MSU) Presented by A. Demichev CERN-INTAS meeting, 14 March 2005, CERN

Subtask T2.1 : Monitoring of application jobs  Existing LCG job-monitoring system offers information only about a few discrete states of a job in grid (e.g., submitted, active, done);  output and error messages can be obtained only after completion of job execution.  Suggested extension allows users to have intermediate job output (through time intervals specified by users ) for detailed job execution control CERN-INTAS meeting, 14 March 2005, CERN

T2.1: Monitoring of application jobs (2) CERN-INTAS meeting, 14 March 2005, CERN

T2.1: Monitoring of application jobs (3)  No LCG MW modification required (wrappers + additional server);  Access to the intermediate job output via Web-interface;  Authorization is based on the standard GSI certificates and proxy certificates  Starting Web-page for interested users (with instructions): CERN-INTAS meeting, 14 March 2005, CERN

T2.1: Monitoring of application jobs: Web-interface CERN-INTAS meeting, 14 March 2005, CERN

T2.1: Monitoring of application jobs: Web-interface (2) CERN-INTAS meeting, 14 March 2005, CERN

T2.1: Monitoring of application jobs: Web-interface (3) CERN-INTAS meeting, 14 March 2005, CERN