Evaluation of Low Volume Roads Rodrigo Archondo-Callao Senior Highway Engineer, ETWTR January 10, 2008 The World Bank.

Slides:



Advertisements
Similar presentations
The Economics Of Road Investment
Advertisements

Project Selection (Ch 4)
9-0 Chapter 9: Outline Net Present Value The Payback Rule The Discounted Payback The Average Accounting Return The Internal Rate of Return The Profitability.
Chapter McGraw-Hill Ryerson © 2013 McGraw-Hill Ryerson Limited 9 Prepared by Anne Inglis Net Present Value and Other Investment Criteria.
Net Present Value and Other Investment Criteria
0 Net Present Value and Other Investment Criteria.
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
Engineering Economics in Canada Chapter 10 Public Sector Decision Making.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Net Present Value and Other Investment Criteria Chapter Nine.
Castellanza, 20 th October and 3 rd November, 2010 FINANCIAL INVESTMENTS ANALYSIS AND EVALUATION. Corporate Finance.
Engineering Systems Analysis Richard de Neufville © Massachusetts Institute of Technology Economic Evaluation Slide 1 of 22 Economic Evaluation l Objective.
Economic Analysis Concepts. 2 Is the project justified ?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive.
Cost-Benefit Analysis. 2 Cost Benefit Analysis Identify & evaluate all costs & benefits Discount Assess project(s) by calculating Benefit/Cost Ratio (B/C)
Unit 3 (cont.): Economic Analysis— Cost-Benefit Analysis 2.
Benefit Cost Ratio Asso. Prof. Dr. Vanchai Rijiravanich Siam University Jan
Economic Analysis Concepts. 2 Is the project justified ?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive.
Chapter 9 Net Present Value and Other Investment Criteria McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Multi Criteria Decision Modeling Preference Ranking The Analytical Hierarchy Process.
(c) 2001 Contemporary Engineering Economics 1 Chapter 17 Economic Analysis in the Public Sector Framework of Benefit- Cost Analysis Valuation of Benefits.
Engineering Economics in Canada Chapter 10 Public Sector Decision Making.
COST–EFFECTIVENESS ANALYSIS AND COST-UTILITY ANALYSIS
(c) 2001 Contemporary Engineering Economics 1 Chapter 17 Economic Analysis in the Public Sector Framework of Benefit- Cost Analysis Valuation of Benefits.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Net Present Value and Other Investment Criteria Chapter Nine.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
Good Decision Criteria
ALI SALMAN1 LECTURE - 11 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
An initiative of the ACP Group of States funded by the European Union Global Climate Change Alliance: Intra-ACP Programme Training Module Mainstreaming.
Capital Budgeting Decisions. What is Capital Budgeting? The process of identifying, analyzing, and selecting investment projects whose returns (cash flows)
Economic Analysis: Applications to Work Zones March 25, 2004.
WLI REGIONAL KNOWLEDGE EXCHANGE WORKSHOP ON DECISION-SUPPORT TOOLS AND MODELS SEPTEMBER, 2013, JERBA, TUNISIA Economic analysis of improved water.
AT Benefit Cost Analysis Model Highway Design, Project Management and Training Section Technical Standards Branch Presented by Bill Kenny, Director: Design,
Center for Risk Management of Engineering Systems University of Virginia Prioritization Methods For Multimodal Investments, Including Return on Investment.
Evaluating the Options Analyst’s job is to: gather the best evidence possible in the time allowed to compare the potential impacts of policies.
Economic evaluation Definition - the comparative analysis of alternative courses of action in terms of both their cost and consequences.
AltaViz – GDOT’s Alternative Visualization Analysis Tool for the Atlanta Managed Lane System Plan February 25, 2011 Atlanta Model User Group Meeting Jennifer.
Roads Economic Decision Model (RED) January 2008 Rodrigo Archondo-Callao Senior Highway Engineer, ETWTR The World Bank.
Maintenance & Rehabilitation Strategies Lecture 5.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
Forecasting and Evaluating Network Growth David Levinson Norah Montes de Oca Feng Xie.
CAPITAL BUDGETING_LECT 091 The Concept of Opportunity Cost The concept of opportunity cost is used in CBA to place a dollar value on the inputs required.
Capital Budgeting Decide how to invest money so that its value is maximized.
International Institute for Geo-Information Science and Earth Observation (ITC) ISL 2004 RiskCity Exercise: Spatial Multi Criteria Evaluation for Vulnerability.
13-1 Agenda for 30 July (Chapter 9) Assessment of various commonly used methods for deciding how capital is to be allocated. Net Present Value (NPV) The.
Road Network Evaluation Tools (RONET) Version 2.00 January, 2009 Rodrigo Archondo-Callao.
ECONOMIC EVALUATION. Economic evaluation: what is it?  Economic evaluation is the traditional tool for prioritizing road investment  It provides a monetarised.
HDM-4 Analysis Options The World Bank Christopher R. Bennett Director - Data Collection Ltd.
1 The HDM Approach to Multi- Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.
Road Investment Decision Framework
TRANSPORTATION ENGINEERING (CVE 503) Presented by: Engr. Stephen Agyeman Sunyani Polytechnic Civil Engineering Department.
Part I Project Initiation.
16BA608/FINANCIAL MANAGEMENT
Capital Budgeting and Cost Analysis
Factors to consider System component costs Methods
Analysis Manager Training Module
FamilySource Network Impact Study Results Year 6:
Project Management – PTM721S
Paving a Gravel Road Case Study
Unsealed Road Deterioration
Project Feasibility Analysis
Introduction and Applications
Project Appraisal Guidelines for National Roads
Economic Evaluation Objective of Analysis Criteria Nature
Presentation Module 3c Cost-Benefit-Analysis (CBA)
By Muhammad Shahid Iqbal
Overview of Capital Budgeting
Costing and Finance P R Upadhyay.
RED Model Case Study: Economically Justified Levels of Road Works Expenditures on Unpaved Roads January 2008 Rodrigo Archondo-Callao Senior Highway.
Capital Expenditure Decisions
Net Present Value and Other Investment Criteria
Cost Benefit Analysis in the Transport Sector… …and Evaluations
Presentation transcript:

Evaluation of Low Volume Roads Rodrigo Archondo-Callao Senior Highway Engineer, ETWTR January 10, 2008 The World Bank

World Bank Technical Paper No. 496

Road Transport “Tracks”“Roads”“Highways”

Functional Classification

Primary Road Network Roads with 2 or more lanes Paved roads Traffic greater than 500 AADT Long distance traffic Essentially serves an economic function Focus is the reduction of transport costs Cost Benefit Analysis (CBA) using the HDM-4 model

Secondary Road Network Road with 1.5 to 2 lanes Unpaved roads or paved roads Traffic less than 500 AADT Medium distance traffic Economic and social function Focus is the reduction of total transport costs, measuring also the social impact Cost Benefit Analysis (CBA) using RED model or HDM-4 model

Tertiary Road Network Roads with 1 to 2 lanes Unpaved roads and tracks Traffic lower than 50 AADT difficult to measure Short distance traffic Essentially serves a social function Focus is the social impact, measuring the efficiency of the investments and/or a multi- criteria index Cost Efficiency Analysis (CEA) or Multi- Criteria Analysis (MCA)

Analytical Instruments Cost Benefit Analysis (CBA)  Net Present Value Cost Efficiency Analysis (CEA)  Total Beneficiary Population per Investment Multi Criteria Analysis (MCA)  Priority Index

Cost Benefit Analysis (CBA) Total Society Costs Improve Standard Government Costs Road User Costs CBA

Comparison of Alternatives with CBA To compare project alternatives, the Net Present Value is used to select the optimal alternative (the one with higher NPV) and to eliminate project that are not economically feasible (NPV<0) The Internal Rate of Return (IRR) or the Benefit/Cost and NPV/Investment ratios are not recommended to compare project alternatives Alternatives NPV Optimal Alternative: Higher NPV Project CBA

Comparison of Projects with CBA To compare the economic priority of projects, it is recommend the use of the indicator NPV per Investment or a budget constraint optimization algorithm, such as EBM-32 contained on the HDM-4 and RED models. Projects Selected Alternative Overlay Reseal Overlay NPV / Investment PRIORITYPRIORITY CBA

Projects Eligibility with CBA To define if a project is eligible, it is recommended to utilize the NPV (NPV > 0) or the IRR (IRR > x%), at a given x% discount rate. Projects Eligible Not Eligible NPV IRR % % % CBA

Cost Efficiency Analysis (CEA) It compares the cost of interventions with its predicted impacts and it is used in the situations where the benefits cannot be measured in monetary terms, or where the measurement is difficult. It includes provisions that (a) the objectives of the intervention are indicated and are clearly part of a ampler program of objectives (such as reduction of the poverty); and (b) the intervention represents the smaller cost alternative of obtaining the indicated objectives. It produces efficiency indicators such as Total Beneficiary Population per Investment. CEA

Comparison of Alternatives with CEA To compare project alternatives, the investment cost is used to select the optimal alternative The selected alternative will be the one with the lowest investment cost that will provide the road all-weather access Alternatives Investment Optimal Alternative: Lower Investment Project CEA

Comparison of Projects with CEA To compare the economic priority of projects, it is recommended the use of the efficiency indicator Total Beneficiary Population per Investment Projects Alternative with Lowest Cost Resurface Grading Resurface Total Beneficiary Population / Investment PRIORITYPRIORITY CEA

Projects Eligibility with CEA To define if a project is eligible it is recommended to define a minimum acceptable efficiency indicator Total Beneficiary Population per Investment Projects Total Beneficiary Population per Investment Eligible Not Eligible CEA

Projects Eligibility with CEA CEA

CEA Indicators Investment Cost per Total Beneficiary Population 100 US$ per person Total Beneficiary Population per Investment Cost 0.01 persons per US$ Total Beneficiary Population per Investment Cost in thousands of dollars 10 persons per 1,000 US$ CEA

Multi Criteria Analysis (MCA) It adopts criteria such as traffic, proximity to educative, health, and economic centers, which receive weights (points) concerning their perceived importance. The added number of the points that each section receives is computed simply adding the points assigned for each criterion, or with the use of a more complex formula. MCA

Multi Criteria Analysis Example Inhabitants benefited per km Percentage of extreme poverty Productive area Average traffic Functional classification Location in the optimal network Number of health centers Number of schools Existence of public transport Environmental feasibility MCA

Multi Criteria Analysis Example Factor = Value / Maximum Value MCA