1 MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
January 14, 2004 TJR - - UPDATED 1/25/04 1 MICE Beamline Analysis Using g4beamline Including Jan 25 Updates for Kevin’s JAN04 Beamline Design Tom Roberts.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
TJR Feb 10, 2005MICE Beamline Analysis -- TRD SEPT041 MICE Beamline Analysis – TRD SEPT04 Tom Roberts Muons, Inc. February 10, 2005.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
AFC engineering group meeting on the 26 th of Jan 2004 MICE Absorber Focus Coil work schedule for the next 6 months By Wing Lau, Oxford.
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.
March 30, 2004 TJR1 MICE Upstream Particle Identification Tom Roberts Illinois Institute of Technology March 30, 2004.
TJR Sept 22, 2004MICE Beamline Analysis -- SEPT041 MICE Beamline Analysis – SEPT04 Tom Roberts Muons, Inc. September 22, 2004.
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
1 PID status MICE Analysis phone conference Rikard Sandström.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
M. Bonesini PID Meeting1 M. Bonesini INFN Milano MICE TOF0 construction & planning.
MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Cooling Channel layout Presented by Stephanie Yang & Wing Lau.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
The CKOV support By P Lau. Hall space available to the Ckov & TOF 0 Beam line 3.
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Diffuser Mounting Design Stephanie Yang.
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
Paul drumm; 3rd December 2004; AFC MM 1 Why? Goal: Ultimate (CCLRC defined) Safety & Design Review –How do we get there? We need a Process –What is needed?
1 RF Power infrastructure Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Phone meeting on PID Detectors 25 Jan 2006 Implementation of PID detectors in the general MICE layout By Wing Lau, Oxford.
1 paul drumm; ; FAC-PR MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
MICE PID, 6 Dec 2007 V. Palladino Introduction to the meeting Introduction to the meeting 1 ) TOF I shielding (Vittorio introduces discussion) 2) Discussion.
MICE Collaboration meeting RAL 21 – 24 Oct 2005 Summary of Design & Safety review progress By Wing Lau – Oxford University.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 PID Support Design Stephanie Yang.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
May 12, 2004 TJR1 Effects of Downstream Iron Shield Position on MICE Good- Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
May 12, 2004 TJR1 Effects of Upstream ParticleID Counters on MICE Good-Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Main progress on Design & Safety Review: EmCAL -- Received the revised TRD write up from Ludovico Design & Safety Audit sheets need to be revised to correspond.
Project manager report paul drumm CM16 October 2006.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
MICE PID & trigger Detectors MICE CM11, LBL Feb 12, 2005 for the PID team Bonesini, Cremaldi, Gregoire, Kahn, Roberts, Sandstrom, Summers, Tilley, Tonazzo,
1 MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Integrated Design & Safety Review Presented by Wing Lau & Paul Drumm.
MICE PID size &scraping MICE CM16, RAL, Oct V. Palladino, Univ & INFN Napoli for R. Sandrstrom and others contributing to this effort Yagmur, Holger,
Design & Safety Review Work Group meeting 10 March 2005 Progress update Wing Lau, Oxford.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
How to Add a WDCE Course Meeting Date on a Course Section Schedule Updated
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
911Shield Initial APP Download. 911Shield Initial Setup Screen  Once the App is installed on your device it will require setup information as shown on.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
1 MICE UK meeting at RAL 05 May 2005 Integrated Design & Safety Review Presented by.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
Infrastructure EHN1 extension Lau Gatignon, 7 March 2016.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
Status of the MICE Construction Project
MICE CM31 Schedule summary
Insert subhead here Project Status.
Bear Project Title Name Class Date
The Detector System of the MICE Experiment
Updating Databases With Open SQL
Updating Databases With Open SQL
Presentation transcript:

1 MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau

2 Work carried out so far: Design audits: Beam line & target (needs further revision) Fibre tracker (TRD to be modified to insert book marks) Cherenkov 2 (complete) Iron Shielding (TRD to be modified to insert bookmarks) Safety audits: Cherenkov 2 (Done) Iron Shielding (Done) Beam line & target (needs further revision)

3 Work expected to be done before the next MICE Collaboration Meeting: Design audits: Engineering infrastructures Safety audits: Engineering infrastructures Fibre trackers

4 Example of the work done so far: For the table summarising the work done to date, click: For the example on Cherenkov 2 Design audit, click: on the corresponding box in that table.

5 So far we have only received fed back from Ghislain on the Cherenkov 2 and the magnetic shielding design. We need the following urgently: A schedule with milestone dates on the PID components so that we can work out a realistic time table for the Design & Safety review on components: Cherenkov 1; TOF 0, 1 & 2; Calorimeter We also need to have a common design on the support structures on alll the PID components. Paul has asked me to initiate this and I would like to have the endorsement of this group before I can make a start. Action list