UNC Modification Proposal 0229 Guidelines document.

Slides:



Advertisements
Similar presentations
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Advertisements

NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Review of industry code governance 26 March 2010.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Smart Grid Forum - Update DCMF Meeting – 7 February 2013 Gareth Evans Head of Profession – Engineering Ofgem.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
IT Governance Review Presentation to SAAG – January 11 th, 2011.
Lessons Learned Process – A Strawman.  Lessons Learned  “To pass on any lessons that can be usefully applied to other projects”  “The data in the report.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF WSA Presentation from Workstream A looking at the Network Modelling aspects.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Long-term Electricity Supply Contracts (Negotiated Pricing Agreements - NPAs) 20 April 2010.
Environmental Standing Group. 2 Background  Ofgem issued an open letter on 15 th April 2008 to consider issues associated with carbon assessment for.
January 24, 2016 energynetworks.org 1 The SoC Project A PRESENTATION BY THE REGULATION GROUP OF THE ENERGY NETWORKS ASSOCIATION PRESENTED BY ANDREW NEVES.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Contestability Working Group Consultation Report and Recommendations NIE Networks / SONI Joint Presentation 26 January 2016.
Structure of Charges: Update and next steps DCMF 10 September 2008.
Industry Dialogue on xoserve Services 14 th September 2007.
Legal Text Production Options for Discussion. Legal Text Production 2 Issues with current approach Issues with the current approach to legal text production.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
12 November energynetworks.org 1 PRESENTED BY MO SUKUMARAN, ON BEHALF OF WSB Presentation from Workstream B Pricing Modelling (EDCM/CDCM) Common.
Transitional Exit Capacity Proposals -Update
Modification Proposal 0283 Update
INTERCONNECTION GUIDELINES
Code Governance Review UNC Modification Proposals
Introduction of Code Contingency Guidelines Document
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
Ofgem RIA – UNC Modification Proposal 0229
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Steps during and after a Pre-commercial Procurement
Steps during and after a Pre-commercial Procurement
2003 consultant contract reform agenda
NTS Entry Charging Review Update
UNC Mod 273 – Governance of Feasibility Studies
CSEPs Reconciliation Proposals
Mod 0452 (PARCA) – Further thoughts
The Necessary Criteria for a UNC Modification Proposal
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
MOD 258A Demand Estimation Sample Point – Shipper Report.
Introduction of Code Contingency Guidelines Document
Lessons Learned Process – A Strawman
Steps during and after a Pre-commercial Procurement
Transmission Workstream 1st September 2005
Proposed Transitional Gas Exit Arrangements
Transmission Workstream 2nd December 2010
Proposed amendments to the AUG Guidelines
Modification proposal 330
Options for the Development of a Demand Side Response Mechanism
Measurement Error Notification Guidelines for NTS to LDZ and LDZ to LDZ Measurement Installations Review 2014.
UNC Modification Proposal 0229
Steps during and after a Pre-commercial Procurement
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Commercial Arrangements For Gas Quality Service – Introduction
UNC Modification 0229 Role of the UNC Committee
Transmission Workstream 05 November 2009
UNCC - PAC Proposal for the Election Process to the PAC
Presentation transcript:

UNC Modification Proposal 0229 Guidelines document

Background  Ofgem RIA states that it is ‘minded to accept’ Mod 0229  NGD presented its concerns with the associated guidelines at January 2010 Distribution Workstream  As agreed at Workstream, DNOs have since engaged with Proposer and discussed these  No agreement on issues forthcoming guidelines remain unchanged.

DNO concerns  DNOs accept that 0229 principles essentially sound. However our opinion is that:  Proposal as drafted (including guidelines)  Perceived as unduly complex  Could give rise to challenges and process ‘stop points’  Possibly unlikely to result in timeline to conclusion  Unmitigated risks exist  AUGE tender controlled by UNC Committee  Not acceptable for UNC Committee to select AUGE and then for Transporters to be forced to contract with selected party.  Eventualities - Suitability of candidate/or no candidates?

DNO concerns (continued)  Multiple opportunities for parties to challenge/agree output of AUGE (AUGS) – undermines purpose of independent agent  Risk that challenges driven by commercial interests - undermines ‘neutrality’ of AUGE  Once appointed need to let AUGE conclude  Risk of changes to Guidelines which could impact Transporter contractual arrangements  Guidelines appear to be unclear as to the specific output i.e. the ‘methodology’ or ‘Statement’ or ‘AUGS’? Also timing and deliverability not clear.  Complexity threatens delivery within timescales – likelihood that ‘zero volumes’ could result.  Process for AUGE/AUGS output unduly protracted – no output for up to 2 years from implementation.

DNO opinion:  No issues with Mod 0229 principles (includes appointment of independent AUGE & production of AUGS)  Must be a simplified AUGE tendering and appointment process – wholly a Transporter responsibility (see suggested amendments)  Should addresses the scenario where AUGE is not appointed  Should permit challenge and review but process should conclude in an acceptable timescale  Reliance on AUGE as ‘independent’ authority ensures AUGS not influenced by commercial drivers/interests  Ofgem has requested legal text – NGD has commenced work  Funding arrangements appear not to be addressed  Assuming Ofgem directs to implement – need to identify and consider next steps?