API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.

Slides:



Advertisements
Similar presentations
DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management.
Advertisements

Icahn Conversion to T. Rowe Price ITS ABOUT BEING THERE. DaVita Inc. Conversion to T. Rowe Price.
Program Management Office (PMO) Design
C2-SENSE WP2 Bojan Božić, Gerald Schimak, Refiz Duro C2-SENSE WP2 Meeting Paris
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
Section 305 Technical Subcommittee Boston, MA: June 14, 2014.
Don Wells Hess Corporation
IS4799 Information Systems and Cybersecurity Capstone Project
Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess)
Instructional Materials Process and Progress Update Chief Academic Officer Quarterly Meeting November 13, 2012.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
Planning for the International Assessment and Review process
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
© Chevron 2013 D EEP S TAR ® A Global Deepwater R&D Consortium Task Report Update: DeepStar Study AUV Interface Standards for Deepwater Fields Reporting.
Best Practices Working Group June 19-21, 2001 Munich, Germany.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
Z26 Project Management Introduction lecture 1 13 th January 2005
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Report on UNSD activities since the last meeting of the Expert Group on International Economic and Social Classifications Meeting of the Expert Group on.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
Update on Current EGNRET Projects APEC EGNRET 23 Meeting Christchurch, New Zealand ~ November 10-12, 2004 Jean Ku National Renewable Energy Lab, USA Cary.
Second Annual Japan CDISC Group (JCG) Meeting 28 January 2004 Julie Evans Director, Technical Services.
API RP 17 N Update Subsea System Reliability and Integrity Management Presented by: Mark Siegmund - API 17N Chairman Jan 18, 2011.
Don Wells Hess Corporation
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Take Charge of Change MASBO Strategic Roadmap Update November 15th, 2013.
1 Meeting on April 18, 2013 Washington DC Workshop on a Joint HDPE Roadmap for Current and Future Service.
1 Commonwealth Project Management Division Bob Haugh Project Management Division November 15, 2010 Revision of.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
API RP 6HP (draft 5.2) Status Presentation Tech Session II Summer Standards Conference.
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
SCORM Status. 2 Stabilization, Clarification and Issue Resolution Bug Fixes, Corrections & Clarifications SCORM 2004 January 2004 SCORM nd Edition.
Introducing the Science and Technology Roadmap 1 st GEO/EGIDA Workshop Bonn, Germany, May 09 th - 11 th, 2011.
API 17N Subsea Production System Reliability and Technical Risk Management Don Wells Hess Corporation.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
1 Program Release 2008 Update to the Administrative Council August 9, 2007.
JCN, Justice Cooperation Network European treatment and Transition management of High Risk Offenders.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
Accelerator Safety Workshop SLAC Scott L. Davis Accelerator Safety Program Manager – SC Office of Science, U.S. Department of Energy Summary and.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
GIT 6 Update on Local Leadership Management Strategy Local Leadership management strategy submitted on December 15 th to Bay Program Office Management.
19th January 2012 Don Wells (Hess)
Future Directions Update Project Timeline Report to the Steering Committee - 6/04 Briefing to Coordination Group - 6/1/04 Comments due - 5/14/04 Briefing.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
PRIIA 305 Technical Subcommittee Systems Engineering Processes for Passenger Equipment Acquisition and Life Cycle Support Presented at: NGEC Executive.
API SC19 HPHT Template (Proposed as SC19TR1)
Task Group Status January ,11, 2017
Updates from SC18 Summer Meeting
UK Link Technology Refresh
Implementing the Transportation/Land Use Connection Program
API 17Q Proposed Technical Changes to Rev 0
Status report on the activities of TF-CS/OTA
Overview of the FEPAC Accreditation Process
API RP 17A - Discussion Points
API 17Q – Subsea Equipment Qualification
Specification on float equipment
First 8 slides are what was presented in San Fransisco…
API SC 10, Work Group 3 Update:
PMP sub-group on CPC calibration
Don Wells Hess Corporation
Executive Order No. 23 Update Air & Waste Management Association Conference November 16, 2018 Presentation will focus on the latest policy development.
Report of the Technical Subcommittee
Scene setter European Commission DG Environment
DSC ChMC Switching Programme Update 10th July 2019
Presentation transcript:

API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation

History / Status Document released in 2009 Specification contains: – Life Cycle Process (LCP) – Define, Plan, Implement, Feedback (DPIF) Loop – 12 Key Practices (KP) – Technology Qualification Process – Technology Readiness Level

Initial Plan / Path Forward Process – Split into 5 subgroups (now 6) – Industry Leaders – Common Template Introduce IM into the scope of 17N: – Define IM – Expand the Life Cycle Processes – Reassessment through remediation – Define TRL progression

Detail Expand the Life Cycle Process – Provides balance and depth to the document – Communication of goals & requirements 4 Feasibility Concept Selection FEEDDetailed Design Manufacturing & Assembly SIT, Installation, & Commissioning OperationDecommissioning

Detail Change to a Dual-DPIF loop – Add Remediation cycle – Facilitates Integrity Management

Specification Development (Greenfield Projects)

Specification Development (Brownfield Projects).. and acceptance criterion

Deadline for comments on ‘November 1 st issue’ December 10 th November 1 st Issue of complete document (Main section and ALL Annexes) October 14 th August 21 st January 31 st Final API RP 17N Issue Deadline for comments on ‘August 21 st issue’ Issue of document (Main section and Annexes A & C) API RP 17N Meeting to discuss high level comments and comments from decomworld conference API RP 17N Meeting November 1 st to introduce comments spread sheet and close out outstanding comments. API RP 17N Meetings Key dates October 15 th October 28 th January 13th Meeting to close out outstanding comments. Current Progress Progressed Plan as Presented in Previous Meetings

Progress Workshop held in Washington – Solicited Input from outside of 17N – Minutes and Summary Document distributed to all participants – Feedback incorporated into 17N

Progress Workgroups Submitted Input – Using Common Template Edited into a Single Document – Astrimar Circulated for Comment within 17N Committee – 3 rounds, 1,000+ – Last Comments Due Dec 10 th – Clarification Discussions at Jan 13 th meeting

Progress Comments have been Prioritized – Are currently being included Not full Fidelity for all comments / subjects – Decommissioning – Obsolescence – Field Life Extension – Human Factors – Configuration Management / MOC – Final Document Due January 31+

17Q History Plans for API 17Q – Last meeting, we were asked to blend 17Q into 17N – Work indicated that this was not best approach – Rationale Different Subjects Qualification Not Unique to 17N Expect Revision at a Different Rate – Qualification /Verification details from 17N will be Incorporated into 17Q

17Q Plans Path Forward – 17Q Committee to establish current Status January 30th – Define an “Ideal” version – Define a “Minimum” version – Make decision on Path Forward Minimum Version of Document – with planned future revision Ideal Version plus Technical Report & Work Plan Organizational Needs Funding Needs Schedule

Plans Original Plans included a “Pre-Ballot” Workshop – Change of Plans Not a New Document Large Active Committee Potential to Circulate to Washington Workshop attendees – OK? OTC Paper submitted – Presentation as part of API 17 Session

Next Complete Planned Activities – Deliver Summary Report on Completion Recommended Next Steps Issue Document to API Format, Ballot, etc. Question How do we “Deliver” to Industry – API University – Industry Training

Thanks You’s To Everyone Involved – Workgroup Leaders – Participants – Workshop Attendees – Astrimar – BSEE Large Amount of Effort by everyone Large amount of detail developed, considered and Worked Even with the Growth in Scope, effort continued and quality maintained A great deal of quality work was completed!