Forecasting for Water Resources Planning. Learning Objective(s):  The student will:  Understand the need for forecasts.  Be able to describe what a.

Slides:



Advertisements
Similar presentations
UNIT 1 CONCEPT OF MANAGERIAL ECONOMICS (continue)
Advertisements

UNIT 1 CONCEPT OF MANAGERIAL ECONOMICS (continue)
PROJECT RISK MANAGEMENT
Topic 2. DECISION-MAKING TOOLS
Reserve Risk Within ERM Presented by Roger M. Hayne, FCAS, MAAA CLRS, San Diego, CA September 10-11, 2007.
Tools Dr. Saeed Shiry Amirkabir University of Technology Computer Engineering & Information Technology Department.
The Delphi Technique: A Tool For Long Range Travel and Tourism Planning Chapter 39 Research Methodologies.
Chapter 3 Forecasting McGraw-Hill/Irwin
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Problem Analysis Intelligence Step 2 - Problem Analysis Developing solutions to complex population nutrition problems (such as obesity or food insecurity)
Forecasting McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Qualitative Forecasting Also known as Technological or Judgmental Forecasting Use Long Term No history Historical patterns are not expected to apply Several.
Chapter 4 Basic Probability
EFFECTIVE PREDICTIVE MODELING- DATA,ANALYTICS AND PRACTICE MANAGEMENT Richard A. Derrig Ph.D. OPAL Consulting LLC Karthik Balakrishnan Ph.D. ISO Innovative.
Chapter 4 Basic Probability
Supply Chain Management (SCM) Forecasting 3
Chapter 14 Risk and Uncertainty Managerial Economics: Economic Tools for Today’s Decision Makers, 4/e By Paul Keat and Philip Young.
Marketing Management Indicator 1.03 Employ marketing-information to develop a marketing plan.
© Harry Campbell & Richard Brown School of Economics The University of Queensland BENEFIT-COST ANALYSIS Financial and Economic Appraisal using Spreadsheets.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 12-1 Chapter 12 Simple Linear Regression Statistics for Managers Using.
Chapter 10 Hypothesis Testing
Reporting & Ethical Standards EPSY 5245 Michael C. Rodriguez.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J A-1 Operations.
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
UNIT 2: Planning The Planning Process and Types of Plans.
Relevant Analysis - 1 RELEVANT ANALYSIS FOR TACTICAL DECISIONS X Y Z Which one do we choose???
SIMULATION USING CRYSTAL BALL. WHAT CRYSTAL BALL DOES? Crystal ball extends the forecasting capabilities of spreadsheet model and provide the information.
Science This introductory science course is a prerequisite to other science courses offered at Harrison Trimble. Text: Nelson, Science 10 Prerequisite:
Business Statistics: A First Course, 5e © 2009 Prentice-Hall, Inc. Chap 4-1 Chapter 4 Basic Probability Business Statistics: A First Course 5 th Edition.
Chapter 2 Risk Measurement and Metrics. Measuring the Outcomes of Uncertainty and Risk Risk is a consequence of uncertainty. Although they are connected,
Engineering Economic Analysis Canadian Edition
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
Chapter 5 Choice Under Uncertainty. Chapter 5Slide 2 Topics to be Discussed Describing Risk Preferences Toward Risk Reducing Risk The Demand for Risky.
Linear Programming Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Risk and Capital Budgeting 13.
Inventory Management and Risk Pooling (1)
CHAPTER 28 Translation of Evidence into Nursing Practice: Evidence, Clinical practice guidelines and Automated Implementation Tools.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Fundamentals of Hypothesis Testing: One-Sample Tests Statistics.
Sensitivity and Importance Analysis Risk Analysis for Water Resources Planning and Management Institute for Water Resources 2008.
1 Scenarios and More California Water Plan Advisory Committee Meeting April 14 th, 2005.
QM Spring 2002 Business Statistics Probability Distributions.
Uncertainty Management in Rule-based Expert Systems
Term Project Overview GEO 207 Natural Disasters. Introduction Description of the hazard and area you are discussing. The area should be a community (town,
Basic Business Statistics Assoc. Prof. Dr. Mustafa Yüzükırmızı
Research Design. Selecting the Appropriate Research Design A research design is basically a plan or strategy for conducting one’s research. It serves.
Issues concerning the interpretation of statistical significance tests.
Risk Analysis in Capital Budgeting. Nature of Risk Risk exists because of the inability of the decision-maker to make perfect forecasts. the risk associated.
Basic Business Statistics, 11e © 2009 Prentice-Hall, Inc. Chap 4-1 Chapter 4 Basic Probability Basic Business Statistics 11 th Edition.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Sensitivity and Importance Analysis Charles Yoe
US Army Corps of Engineers BUILDING STRONG ® STEP 2: INVENTORY AND FORECAST Planning Principles & Procedures – FY 11.
David Moser USACE Chief Economist
Chapter 7 Planning and Decision Making. Planning Planning is the process of creating a direction for one or more parts of the organization. The purposes.
Technology Forecasting. Forecasting predict or estimate a future event or trend. "rain is forecast for Lahore“ The use of historic data to determine the.
Management Fundamentals - Chapter 81 How do managers plan?  Planning The process of setting objectives and determining how to best accomplish them. 
Framing your Research: Refining your Problem Statement and Rationale Dr. Carl Middleton, Center for Social Development Studies, Chulalongkorn University.
Business Statistics: A First Course, 5e © 2009 Prentice-Hall, Inc. Chap 4-1 Chapter 4 Basic Probability Business Statistics: A First Course 5 th Edition.
Risk assessment and Natural Hazards. Concept of vulnerability (e.g. fatalities in two contrasting societies) Deaths 1 …………………………………………
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Uncertainty & Variability Charles Yoe, Ph.D.
F5 Performance Management. 2 Section C: Budgeting Designed to give you knowledge and application of: C1. Objectives C2. Budgetary systems C3. Types of.
Approaches to quantifying uncertainty-related risk There are three approaches to dealing with financial and economic risk in benefit-cost analysis: = expected.
Author: Constance E. Helfat
1 The roles of actuaries & general operating environment
Introduction to Economics
CASE STUDY BY: JESSICA PATRON.
THE BUSINESS ANALYSIS PROCESS MODEL
Chapter 7: RISK ASSESSMENT, SECURITY SURVEYS, AND PLANNING
Part III Exchange Rate Risk Management
BEC 30325: MANAGERIAL ECONOMICS
Scientific forecasting
Environmental forecasting
Presentation transcript:

Forecasting for Water Resources Planning

Learning Objective(s):  The student will:  Understand the need for forecasts.  Be able to describe what a scenario is.  Know when/why assumptions are used in forecasts and scenarios.

Forecasting for Water Resources Planning What is a forecast?  It is a more or less informed judgment about the future, future condition(s), or scenario.

Forecasting for Water Resources Planning Why forecast?  We forecast to project or assess possible future conditions that are often uncertain so we can formulate plans and provisions in the present to accommodate evolving circumstance and uncertainties in the future.

Forecasting for Water Resources Planning What do we forecast?  We forecast variables, combinations of variables, and scenarios.

Forecasting for Water Resources Planning What do we use in forecasting?  Information – Data – Fact(s) – Evidence of all types  Technique(s) – Qualitative vs. Quantitative  Knowledge  Expertise and experience

Forecasting for Water Resources Planning And less informed forecasts?  Assumptions enter the picture.  When uncertainty is significant so is the criticality of corresponding assumptions.  The information and input that inform(s) a forecast reduce uncertainty, assumptions address the remaining uncertainty.

Forecasting for Water Resources Planning So, forecasts are based on...  Certainties and foreseeable developments and occurrences.  Reasonable certainty & expectation. (i.e. fairly certain “stuff”)  Assumptions about less certain developments or events. (less certainty and greater potential for variance)  Considerations of time……..

Forecasting for Water Resources Planning How do we choose the variables we forecast?  Variables are factors or conditions of our existence or circumstance that are uncertain & subject to change.  When the future value of a variable might significantly affect our well being or the decisions we make, it is worth forecasting.  The variables we emphasize for forecasting are those that matter in making decisions, i.e., they are important now or in the future.

Forecasting for Water Resources Planning What is a scenario?  It is a synopsis or description of some condition(s) or situation of interest to us.  They are sometimes factual, sometimes speculative, often a combination thereof.  We can speculate about: – Past conditions -- What were weather patterns or conditions like, port traffic levels, etc.? – Present situations -- What is going on in the market for crude oil prices? – Future situations -- What will tonnage handling or throughput for a harbor facility be in 10 years?

Forecasting for Water Resources Planning What does a scenario look like?  It is information about a possible future condition.  That information can take any and all of the typical forms: – Raw data – vessel calls at a port – Graphics – frequency curve – Narrative text  It is a story about what might or could be.  A variety of formats and contexts may be employed to convey underlying or implicit relationships of the scenario.

Forecasting for Water Resources Planning What are typical scenarios?  Historic condition – what was.  Existing condition – what is.  Base period condition – what will be or is expected at the time of implementation.  Without-condition – what might be if a Federal/non-Federal partnership takes no action.  With-condition – what might be if a particular course of action is undertaken.

Forecasting for Water Resources Planning What is the without condition?  A critical forecast in any water resources planning analysis.  The future is rarely like the past or present.  It does not literally mean to do nothing; it is the most probable or expected course without implementation of a specific action.  It is the scenario that will most likely prevail if the Federal/non-Federal partnership takes no joint action.  Synonymous with NEPA “No action.”

Forecasting for Water Resources Planning What are the with conditions?  It is the scenario that will most likely prevail if the Federal/non-Federal partnership takes a specific joint action to solve a given problem.  There is one most likely with-condition for each alternative plan.

Forecasting for Water Resources Planning How do we address uncertainty in forecasts?  For variable forecasts we use quantitative & statistical methods.  For scenarios we use sensitivity analysis to explore alternative assumptions. – Single-variate – Multi-variate

Forecasting for Water Resources Planning How far into the future do we forecast?  In water resources planning forecasts are made for the entire planning horizon with emphasis for refinement relative to variable criticality and timing.  Often the same or similar for all alternatives, but it can vary from project to project.

Forecasting for Water Resources Planning What do we do with the forecasts?  We examine them to determine their significance or applicability.  We compare them to identify differences between scenarios.  Employed for economic benefit computations and derivation or adjustment of project specifications.

Forecasting for Water Resources Planning Differences in what?  Qualities and impact(s) of occurrence.  Likelihood or probability of occurrence.  Contributions to achievement of planning objectives.

Forecasting for Water Resources Planning How do we compare forecasts?  With and without analysis – required by USACE Guidance (P&G, , etc.)  Before and after analysis – compare existing to with-condition, typical with environmental impact assessment.  Gap analysis – compare with-condition to a target, the difference is a gap or margin to be overcome or assessed for possibility or probability of “closure.”

Forecasting for Water Resources Planning Summary:  When do we need forecasts?  What makes up a scenario?  Why are assumptions needed in forecasting?