Tell1 status: firmware Stéphane T’Jampens Nicolas Dumont Dayot Presented by Bolek Pietrzyk Calo commissioning session - 16 January 2008.

Slides:



Advertisements
Similar presentations
HyCal reconstruction: current situation current situation and future tasks. V. Mochalov, IHEP (Protvino)
Advertisements

Trigger Validation Board PVSS panels tutorial 1. TVB components 2 FPGA controls :  FPGA HCAL hadron trigger  FPGA EPPI electron, photon, pi0, Global.
C. Fernández Bedoya, A. Navarro, I. Redondo. C. Fernández Bedoya November 29th, Goal: Replace SC crate with simple CuOF electronics and place TSC.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
Bagby/Mulhearn L1_Cal Int/Comm Team  Daily Toolbox meetings DAB1 u Links for updates s Schedule: Tasks for Review –
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
11/01/2006Wilco Vink / Martin van Beuzekom / L. Wiggers L0 ECS Workshop Pile-Up System.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
April 9th 2009Jacques Lefrancois1 Data transmitted Now from FEPGA to SEQPGA to CROCNow from FEPGA to SEQPGA to CROC 12bits of ADC +8 bits trigger+1 bit.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Wilco Vink 1 Outline Optical station Vertex processor board Output board Latency.
NA62 Trigger Algorithm Trigger and DAQ meeting, 8th September 2011 Cristiano Santoni Mauro Piccini (INFN – Sezione di Perugia) NA62 collaboration meeting,
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 3 June 2003 Common L1 Workshop Use in Calorimeter Old design with.
Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…
PS FE Board Tests LHCb - LPC Group R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M-L. Mercier, P. Perret, L. Royer Electronic.
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Week 3 January 22, 2004 Adrienne Noble. Today CVS – a great tool to use with your groups Threads – basic thread operations Intro to synchronization Hand.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
Vendredi 18 décembre 2015 Status report on SPIROC chips Michel Bouchel, Stéphane Callier, Frédéric Dulucq, Julien Fleury, Gisèle Martin- Chassard, Christophe.
L0 Workshop 17/10/2007 Wilco Vink / Martin van Beuzekom Leo Wiggers / Sander Mos 1 Commissioning/Status Pile-Up System.
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
26/11/02CROP meeting-Nicolas Dumont Dayot 1 CROP (Crate Read Out Processor)  Specifications.  Topology.  Error detection-correction.  Treatment (ECAL/HCAL.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
TELL1 command line tools Guido Haefeli EPFL, Lausanne Tutorial for TELL1 users : 25.February
18/09/2006Wilco Vink / Martin van Beuzekom / Leo Wiggers L0 Workshop Pile-Up System.
Integration and commissioning of the Pile-Up VETO.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Sub- Nyquist Sampling System Hardware Implementation System Architecture Group – Shai & Yaron Data Transfer, System Integration and Debug Environment Part.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 1 The BX Alignment in The Muon System Summary System peculiarities concerning timing issues System.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Money, money, money! 1p2p 5p Correct! Well done!! Next>>
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Calorimeter CROC PRR CERN Calorimeter ReadOut Card PRR Tests of the CROC Calo CROC PRR – Tuesday 19 December 06.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
FPGA based signal processing for the LHCb Vertex detector and Silicon Tracker Guido Haefeli EPFL, Lausanne Vertex 2005 November 7-11, 2005 Chuzenji Lake,
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
M.N Minard Trigger Validation Board Tests and Implantation Cyril Drancourt, Pierre-Yves David,Victor Coco, Thomas Chouvion,M.N Minard - Production status.
Relative crate phase measurement Olivier Deschamps Jacques Lefrançois Frédéric Machefert Stéphane T'Jampens Frédéric Machefert – Calorimeter Meeting.
TVB TVB X 14 TRIG40 (tell40 structure) Selection board in barrack
TELL1 A common data acquisition board for LHCb
EUDAQ Status Report Emlyn Corrin, 29 September 2010
MiniDAQ2 Workshop Control System.
Online Software Status
Vertex 2005 November 7-11, 2005 Chuzenji Lake, Nikko, Japan
Calorimeter Upgrade Meeting - News
Testing the PPrASIC Karsten Penno KIP, University of Heidelberg
TELL1 A common data acquisition board for LHCb
Presentation transcript:

Tell1 status: firmware Stéphane T’Jampens Nicolas Dumont Dayot Presented by Bolek Pietrzyk Calo commissioning session - 16 January 2008

2 Tell1 status: firmware Calo specific part Common part Firmware common part Firmware calorimeter specific part Op[tical fiber input from CROC to DAQ spyMEM

3 Tell1 status: firmware spec. part Nicolas moved to Guido's VHDL tools (HDL designer) to ease compatibility and thus debugging (used on firmware  2.1) (November 07)‏ In the transition (firmware v2.0 to  v2.1): [v2.1: sept 07 – v2.3: dec 07] The ADC length problem showed up again: corrected in coming firmware The spyMEM (after the MUX) disappeared: will be reintroduced in the coming firmware. These spyMEM are very useful in debugging to understand what is sent by the CROC. Problem with error bank after N consecutive triggers: the last (N) error bank is a copy of the previous (N-1) trigger. Under investigation. (see next slide)‏

4 Tell1 status: firmware spec. part ========================================= Info PP0 PP1 PP2 PP BCnt 20C 20C 20C 20C L0-EvID ZS Length (byte,DEC)‏ ========================================= PP | Channel | Error SYNC | No Event | Crate | Card | EvID | BCnt PP0 CH PP0 CH EF PP0 CH PP0 CH EF PP1 CH EF PP1 CH EF PP1 CH EF PP1 CH EF PP2 ---Not Used PP3 ---Not Used--- ==================================== >>===================Event 5 done ========================================= Info PP0 PP1 PP2 PP BCnt 20B 20B 20B 20B L0-EvID ZS Length (byte,DEC)‏ ========================================= PP | Channel | Error SYNC | No Event | Crate | Card | EvID | BCnt PP0 CH PP0 CH EF PP0 CH PP0 CH EF PP1 CH EF PP1 CH EF PP1 CH EF PP1 CH EF PP2 ---Not Used PP3 ---Not Used--- ======================================== >>===================Event 4 done 5 consecutive triggers: Error banks for EvtID=0,1,2,3 are correct. The feb part of the error bank of EvtID=4 is the one of EvtID=3. A check with the spyMEM [with firmware 2.0] showed that what is sent by the CROC is correct for the 5 events (L0EvtID and BXID).

5 Tell1 status: firmware common part Synchronization: by performing tests on the BX-ID [single shot: periodic trigger - window A=0]: the ODIN bank gives L0EvtID=0 BX-ID=1 the tell1 for this L0EvtID(=0) gives BX-ID=0xA [obtained from the first word in the error Bank] ============================================= Info PP0 PP1 PP2 PP BCnt A A A A L0-EvID ZS Length (byte,DEC)‏ ========================================= PP | Channel | Error SYNC | No Event | Crate | Card | EvID | BCnt PP0 CH PP0 CH D9 PP0 CH PP0 CH D PP1 CH D9 PP1 CH D9 PP1 CH D9 PP1 CH D PP2 ---Not Used PP3 ---Not Used--- ======================================== Tell1 error bank: Tell1 BXID Feb BXID Corrected by Guido. Next step: synchronize Tell1/Febs. Reminder: Synchonization done with L0EvtID and BXID.

6 Tell1 status: firmware common part BEETLE SYNC: EVT_WR EVT_RD Event long Event short ST Beetle 0: [ 0 ] [ 0 ] [ 0 ] [ 0 ] ST Beetle 1: [ 0 ] [ 0 ] [ 0 ] [ 0 ] ST Beetle 2: [ 0 ] [ 0 ] [ 0 ] [ 0 ] ST Beetle 3: [ 0 ] [ 0 ] [ 0 ] [ 0 ] ST Beetle 4: [ 0 ] [ 0 ] [ 0 ] [ 0 ]... ST Beetle 21: [ 0 ] [ 0 ] [ 0 ] [ 0 ] ST Beetle 22: [ 0 ] [ 0 ] [ 0 ] [ 0 ] ST Beetle 23: [ 0 ] [ 0 ] [ 0 ] [ 0 ] Orx problems: 1) Evt_WR and Evt_RD say “0” whereas MEPs are sent! 2) BER tests: counters do not increase Guido: “ I found the bug of the ber counters, the clk_120 was not defined and used for the circuit (plus the high and low registers were inversed at the top level)” (sic). ==> Both corrected in coming firmware

7 Tell1 status: firmware common part In conclusion: 1) migration to Guido's tools was done quickly and successfully by Nicolas. 2) Several bugs corrected in the coming version [to be flashed once power is back] NB: there is a tell1 meeting every AM in the pit to help sharing informations among experts.