Stephen Ambrose GOES-R Data Operations Manager (DOM) OSPO/SPSD March 12, 2013 GOES-R Ground Segment Project Data Operations Support Team System Validation.

Slides:



Advertisements
Similar presentations
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Advertisements

Jeffrey Kronenwetter PLT Director PLT Coordination & Field Campaign Preparations.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Aerospace Systems Engineering
GOES-R Ground Segment Project Robin Pfister Deputy Project Manager, GOES-R Ground Segment 6 th GOES Users’ Conference Madison, Wisconsin Tuesday, November.
Systems Engineering in a System of Systems Context
Project Management: A Critical Skill for Organizations Presented by Hetty Baiz Project Office Princeton University.
GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting Atlanta, Georgia January 20, 2010 Vanessa Griffin Project Manager,
TOTAL OPERATIONAL WEATHER READINESS – SATELLITES (TOWR-S) PROJECT Corresponding author: User Readiness for GOES-R and JPSS is dynamic.
1 WRF Development Test Center A NOAA Perspective WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006 Fred Toepfer NOAA Environmental.
Fundamentals of Information Systems, Second Edition
Systems Analysis and Design in a Changing World, Fourth Edition
Chapter 4: Beginning the Analysis: Investigating System Requirements
July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.
Training in NOAA Satellite Proving Ground Anthony Mostek & Brian Motta NOAA/NWS/Training Division Jim Gurka and Tim Schmit NOAA/Satellite Information Service.
Chapter 4: Beginning the Analysis: Investigating System Requirements
Effective Methods for Software and Systems Integration
Systems Thinking and Systems Engineering Verification & Validation 14 March 2013 Francois Christophe Galina Medyna Eric Coatanéa.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
2013 GOES-R AWG 2 nd Validation Workshop January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.
1 NOAA’s Environmental Modeling Plan Stephen Lord Ants Leetmaa November 2004.
GOES-R Proving Ground All Hands Telecon 9 July 2012.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
Robin Pfister (GOES-R Ground Segment Deputy Project Manager)
NWS Digital Services 1 Digital Services Update and Forecast Collaboration March 16, 2004 Shannon White Training Division.
GOES-R User Readiness Planning Kathy Fontaine USRP Lead GOES-R GS Project Satellite Direct Readout Conference Miami, FL April 12, 2011.
Training: Connecting Developers with Users Anthony Mostek, LeRoy Spayd, John Ogren and Brian Motta NOAA/NWS/Training Division James Gurka, Tim Schmit and.
Reginald Lawrence, NOAA/NESDIS/OSD NOAA Direct Readout Conference
NOAA Satellite Proving Ground/User Readiness Meeting
NOAA’s National Weather Service National Digital Forecast Database: Status Update LeRoy Spayd Chief, Meteorological Services Division Unidata Policy Committee.
JAG/ODAA Fall 2008 James Vermeulen & Jon Whiteside JAG-ODAA Co-Chairs Recommend NCEP's Bradley Ballish replace Jon Whiteside (term completed)
Government Procurement Simulation (GPSim) Overview.
National Centers for Coastal Ocean Science Environmental Management System Implementation August 2005.
Better Preparing the NWS to meet America's Growing Needs Information Brief 1.
GOES-R Ground Segment Project Robin Pfister Deputy Project Manager, GOES-R Ground Segment GOES Users’ Conference Madison, Wisconsin Tuesday, November 3,
Systems Analysis and Design in a Changing World, Thursday, Feb 1.
AWIPS II Update Unidata Policy Committee Meeting J.C. Duh Chief, Program & Plans Division, Office of Science & Technology, NWS April 15, 2010.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Training in NOAA Satellite Proving Ground Anthony Mostek NOAA/NWS/Training Division With help from Jim Gurka and Tim Schmit NOAA/Satellite Information.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
TOWR-G Test for Operational Weather Readiness with GOES-R Joe Zajic NWS Office of Science & Technology – Science Plans Branch Integrity Applications Incorporated.
2015 OCONUS Meeting Non Export-Controlled Information Progress in Development and Integration of the Product Generation Capabilities of the GOES-R Ground.
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
111/27/2015 User Education & Training End-to-End Cycle for NOAA's Satellite Program Anthony Mostek NOAA - NWS – OCWWS - Training Division Anthony Mostek.
NOAA Science Week – Kansas City, MO. 30 April 2012 Non Export-Controlled Information GOES-R – System Validation and User Readiness Planning Stephen D.
Principles of Information Systems, Sixth Edition Systems Investigation and Analysis Chapter 12.
Constellation Space Transportation Planning Office July 30, 2009.
NWS Operations Proving Ground Update Chad Gravelle OCONUS Meeting 20 June 2013.
1 NOAA Priorities for an Ecosystem Approach to Management A Presentation to the NOAA Science Advisory Board John H. Dunnigan NOAA Ecosystem Goal Team Lead.
Training in NOAA Satellite Proving Ground Anthony Mostek & Brian Motta NOAA/NWS/Training Division Wendy Abshire UCAR/COMET With help from Jim Gurka and.
CTB computer resources / CFSRR project Hua-Lu Pan.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
LANCE Processing at the AMSR-E SIPS Presented by Kathryn Regner Information Technology and Systems Center at the University of Alabama in Huntsville Joint.
The Implementation Process1 / 8NPSR, December 8, 2015 Revising the Implementation Process Looking Forward, setting the stage for the panel discussion Hendrik.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
GOES-R Series User Readiness Planning and Development May 12, 2004.
1 National Centers for Environmental Prediction Status of UCAR Review Recommendations Executive Summary September 15, 2010 Louis Uccellini Director “Where.
Tools Report Engineering Node March 2007
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
RUP RATIONAL UNIFIED PROCESS Behnam Akbari 06 Oct
1 Requirements Determination (Analysis) Lecture 3 Courtesy to Dr.Subhasish Dasgupta.
GOES-R Product Distribution Logistics Before and After Handover Kathryn Miretzky GOES-R User Services Coordinator Product Readiness and Operations (PRO)
Matt Seybold (OSPO/SPSD) GOES-R Data Operations Manager & PRO Team Lead NOAA Satellite Proving Ground and User Readiness Meeting May 9, /9/2016NOAA.
Tools Report Engineering Node August 2007
4 Chapter 4: Beginning the Analysis: Investigating System Requirements Systems Analysis and Design in a Changing World, 3 rd Edition.
Rosetta Science Ground Segment Overview
Systems Engineering for Mission-Driven Modeling
Presentation transcript:

Stephen Ambrose GOES-R Data Operations Manager (DOM) OSPO/SPSD March 12, 2013 GOES-R Ground Segment Project Data Operations Support Team System Validation Activities Brief to NWS-NESDIS/SPSD Quarterly Meeting

The GOES-R System-Operational View

DOM/DOST “Mission” DOM = Data Operations Manager DOST = Data Operations Support Team Prepare OSPO to operate the Core GS Data Processing and Distribution System (DPDS) Validate that the Core GS “DPDS” is Mission Capable and Mission Ready Facilitate Consumer System Readiness for GOES-R Data Operations Accomplished by – Procedure and CONOP Development – Prototypes and Exercises – Facilitation of Test Data – Planning and Execution of two Pre-Launch “Data Operations Tests” (DOT) – Support for Post-Launch Tests 3

Data Operations Tests Two Pre-Launch Validation Opportunities – DOT-1: Directly following GS Release One – DOT-2: Directly after GS is complete (Release 1a and Release 2) One month sustained data operations – Continuous “Forecast Based” Level 1B – Interrupts for special test cases Facilitate readiness testing of downstream users 4

Direct Broadcast Community NOAAPort Community Climate, Research, and Academia NWS Forecast Offices Operational User Community NOAA Centers, DOD, NCEP, International Partners WCDAS NSOF RBU C C C PDAPDA PDPD PGPG MMMM PDPD PGPG MMMM PDPD PGPG MMMM TNCF BNCF ANCF NCDC NGDC Ancillary Sources Validation ResponsibilityConsumer System Readiness Support Data Flow through the GOES-R System

NOAAPort Community Climate, Research, and Academia NWS Forecast Offices Operational User Community NOAA Centers, DOD, NCEP, International Partners WCDAS NSOF RBU C C C PDAPDA PDPD PGPG MMMM PDPD PGPG MMMM PDPD PGPG MMMM TNCF BNCF ANCF NCDC NGDC Ancillary Sources Validation ResponsibilityConsumer System Readiness Support Forecast Based Fixed Grid L1b Forecast Based Fixed Grid L1b Pretend Sat Normal DOT Data Flow Direct Broadcast Community *

NOAAPort Community Climate, Research, and Academia NWS Forecast Offices Operational User Community NOAA Centers, DOD, NCEP, International Partners WCDAS NSOF RBU C C C PDAPDA PDPD PGPG MMMM PDPD PGPG MMMM PDPD PGPG MMMM TNCF BNCF ANCF NCDC NGDC Ancillary Sources Validation ResponsibilityConsumer System Readiness Support Simulated CCSDS Packet Stream Simulated CCSDS Packet Stream Pretend Sat Canned “End-to-End” Test during DOT-1

DOT Planning 8 V MRD Validation Objectives Test Objectives Test Design Development: Test Procedures Data and Component Simulators Analysis Tools Approaching with Systems Engineering Discipline Test Execution and Analysis DOT-1 DOT-2 Validation Assessment GRD

Left Side of the V – Validation Objectives Validation Objectives – Validation is not a repeat of Verification Incorporate the People and Mission aspect Run in a “dirty” environment Interact with the real world – Validation Objectives are to Validation …as Requirements are to Verification Decompose them like requirements Account for them like requirements But… V.O.s can be subjective, not necessarily pass/fail Use V.O.s to establish shared expectations with Stakeholders 9

Artwork by NWS/AWIPS, courtesy Brian Gockel

DOST Project Overview Phase One – Project Definition – Completed Phase Two – Preliminary Design – Dec 2012 – Apr 2013 Phase Three – Detail Design – Apr 2013 – Oct 2013 Phase Four – Implementation – Nov 2013 – Apr 2014 Phase Five – Execution of Pre-Launch Testing – May Apr 2015 Phase Six – Execution of Post-Launch Testing Month DD, YYYYGOES-R Ground Segment Project Status Review11

Phase Two Overview Validation Objectives Review Validation Objective Decomposition Development of Ops Procedure List Preparation of Validation Plan version 1 Coordination of External Validation Objectives Development Month DD, YYYYGOES-R Ground Segment Project Status Review12

Phase Three Overview Validation Preliminary Design Review Test Designs Data Set and Simulator Specifications Analysis Tool Specifications Oversight of Ops Procedure Development Preparation of Validation Plan rev 2 Coordination with External Validation Test Developments Month DD, YYYYGOES-R Ground Segment Project Status Review13

Phase Four Overview Validation Critical Design Review Data Set and Generator Implementation Tools Implementation Test Procedure Development Ops Procedure Evaluation and Development Early Opportunity Testing Month DD, YYYYGOES-R Ground Segment Project Status Review14

Phase Five Overview DOT-1 Test Readiness Review Execution of DOT-1 DOT-1 Analysis and Reporting DOT-2 Test Readiness Review Execution of DOT-2 DOT-2 Analysis and Reporting Month DD, YYYYGOES-R Ground Segment Project Status Review15

As of: DOST Top Level Schedule August 30, 2012GOES-R Ground Segment Project Status Review16 December 31, 2012

As of: Validation Testing Dependencies 17 January 31, 2013

Summary DOM – Data Operations Manager DOST – Data Operations Support Team DOTS – Two One-Month Pre-Launch Shakedown Cruises Focus: System Validation/Readiness of Data Processing & Distribution DOVOs – Data Ops Validation Objectives EDOVOs – External Stakeholder Data Ops Validation Objectives Not “Re-Verification” Not “Product Science Validation” 18