GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.

Slides:



Advertisements
Similar presentations
FANS (Future Air Navigation System) Flight Crew Procedures
Advertisements

FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
AOC/FOC Interface for Data Comm Production System
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN/VDL Mode 2 Implementation Status
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.
Federal Aviation Administration Data Communications Program Data Comm Trials and Production Requirements: High Level Impact Presented To: DCIT #23 Plenary.
ATN Subnetwork Implementation:
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
CPDLC / ADS Operations 4/22/2017 2:35 PM
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
Data Communications Implementation Team (DCIT)
ATN September 2001 American Airlines Data Link... Frank Cheshire / Andy Fry.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Harris.com Alex Murray | DCIS Benefits Lead DCIT Brief Data Comm Benefits & Metrics Alignment with DC Program, NIWG, & NAC.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 29 From: Data Comm Production Sub-Team Date:
EWR DCL Trial Update Capt Gregg Kastman MD-11 Flt Trng Sup.
| 1 harris.com Matt Maki DCL Trials Lead DCL Trials Decommissioning Plan 29 Sep 2015.
Harris.com 02/01/2014 – 02/28/2015 Alex Murray | Systems Engineer DCIT 39 Plenary Health Monitoring Stats.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 2/1/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Courtesy Copy Messages DCIT WG meetings 3/6/2012.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
P. Muraca v0.4 Data Comm DCL Trials end to end system test.
P. Muraca v0.2 Data Comm DCL Trials end to end system test.
Federal Aviation Administration Subscriber Database (SDB) and Web Access To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 3/13/13.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
LINK EEC Test Facility - ATN 2003 London 1 LINK Test Facility Overview Located at EEC Bretigny - France In support to LINK EATMP project.
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 26 From: Data Comm Production Sub-Team Date:
DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system.
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
FAA Ground to Ground ATN Implementation Plan
International Civil Aviation Organization
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
The Air Ground Datalink Server (AGDS)
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
ATN/VDL Mode 2 Implementation Status
FANS (Future Air Navigation System) Flight Crew Procedures
Data Communications Program
ATN Subnetwork Implementation:
FAA Data Communications Program System Engineering
Operational Context and Use Case Focus Group
Presentation transcript:

GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS

AVIONICS CSP AOC DTAP HADDS NESG AIR-GROUND STRING

AFN LOGON Logon Request Logon Response Logon Accept Indication HADDS FLIGHT DATA AVIONICS CSP DTAP NESG ATC Controller Pilot FP Correlation AOC

AVIONICS CSP DTAP NESG ATC Controller Pilot DEPARTURE CLEARANCE (ALREADY LOGGED ON) Departure Clearance Courtesy Copy (CCI) Send DCL WILCO AOC Departure Clearance Request CPDLC Session Start Response CPDLC Session Start Session Established Departure Clearance Departure Clearance Courtesy Copy (CCA)

AVIONICS CSP DTAP NESG ATC ControllerPilot REVISED DEPARTURE CLEARANCE (ALREADY LOGGED ON, SESSION ESTABLISHED) Departure Clearance Courtesy Copy (CCR) WILCO AOC Revised Departure Clearance Send Revised DCL HADDS REVISED FLIGHT DATA Departure Clearance Courtesy Copy (CCA)

AVIONICS CSP DTAP NESG ATC ControllerPilot DCL SERVICE Departure Clearance Courtesy Copy (CCI) WILCO AOC Departure Clearance Send DCL HADDS FLIGHT DATA Logon Accept Indication Logon Request Logon Response Departure Clearance Request CPDLC Session Start Response CPDLC Session Start FP Correlation Session Established Departure Clearance Courtesy Copy(CCA) Departure Clearance Courtesy Copy (CCR) WILCO Revised Departure Clearance Send Revised DCL Departure Clearance Courtesy Copy (CCA)

HADDS HID HOST ERAM HADDS HID HOST ERAM NESG ED-8 ACY Airline HOST DEMARC TEST ED-8 ACY FAA Technical Center FNTB DEMARC FTI OPS IP HADDS HID HOST ERAM DTAP MOUSE KYBRD MONITOR OS FDP DCL AFN HMI FANS 1/A+ STACK ,3 ARINC SITA IP TEST TOWER TDLS DCL Trials Architecture Airline HOST ARTCC 2 3 2,3 HADDS CSP & API DATA RECORD DEMARC TDLS PC-RCU Strip Printer

HADDS HID HOST ERAM NESG ED-8 ACY Airline HOST DEMARC DTAP MOUSE KYBRD MONITOR FDP DCL AFN HMI FANS 1/A+ STACK ARINC SITA FAA Technical Center Trials Lab System Test - DCL TRIALS ARCHITECTURE Airline HOST HADDS CSP & API DATA RECORD DEMARC PC-RCU HADDS AVIONICS Sim, playback Fans 1/A+ FAA Technical Center FNTB Subnetworks Airlines Tech Center Project Aircraft – N47 Strip Printer do258a do258a IP do258a IP do258a IP Rs 429

Time Line : Pre-Conditions Logon-to-FP Correlation Occurs FP is Forwarded to DTAP Controller Prepares DCL Pilot Logs On Session is Established Pilot Requests DCL Event can happen anytime between the time barriers FP is Filed ~ 30 minutes before departure ~ 2 hrs. before Departure Time

Logon Info Logon Info: Aircraft Registration (Tail Number) Flight ID, aircraft position, and application information Logon-to-FP Correlation LogonFO Tail Number Flight ID ICAO Facility IDDeparture Airport Flight State: Proposed Seeking Logon Data No Active Flight Plan Deposit the logon data in the flight object Set the identified logon to Active Identify the flight object in the logon record

DTAP Protocol Stack D8PSK MSK AVLC POA Air/Ground Routing Function A620 ACARS Processing NULL 622 FANS DCL / AFN D8PSK MSK AVLC POA 618 (VHF) Air/Ground Routing Function A620 ACARS Processing MATIP TEI Processing 618 (VHF) 8802 LAN IP A620 ACARS Processing NULL 622 FANS DCL/ AFN MATIP Telco IP DTAP CSP Aircraft FAA Telco Service /LAN A/G Service NESG BATAP