Report to TAC March 2010. In Brief Voting Items Voting Items GATF – WMS endorsed the recommendations of the GATF GATF – WMS endorsed the recommendations.

Slides:



Advertisements
Similar presentations
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 7, 2008.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
Report to TAC October In Brief 2010 CREs 2010 CREs Working Group Reports Working Group Reports MCWG MCWG QMWG QMWG VCWG VCWG Task Forces Task Forces.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
1 Impact Assessment of Parking Deck NPRRs/SCRs/NOGRRs Phase 1 March 2011.
1 Impact Assessment of Parking Deck and New NPRRs/SCRs Phase 1 February 2011.
Report to TAC December In Brief Working Group Reports Working Group Reports DSWG DSWG CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Task Forces Task Forces.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
March 7, 2013 Technical Advisory Committee (TAC) meeting update to RMS Kathy Scott March 20, 2013TAC Update to RMS 1.
MIG TF Voting Items Market Participant Notification Period (Transmission outage) – =1 Year Interconnection Date for Protocol Considerations – First Interconnection.
TAC Meeting Update. Board Update and TAC Voting Item Kenan Ogelman, Vice Chair of TAC gave the Board Update. It included recommendation that TAC.
Report to TAC September In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 3, 2010.
Generation Adequacy Task Force Update to WMS November 18, 2009.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
September 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
January 29, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott February 3, 2015 TAC Update to RMS 1.
1 TAC Report to the ERCOT Board February 16, 2005.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
September 25 and October 23, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 28, 2014 TAC Update to RMS 1.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
1 WMS Report TO TAC April 2007 (which is in March)
Market Credit Working Group update to the Wholesale Market Subcommittee 03/04/
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
1 TAC Report to the ERCOT Board November 14, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 21, 2008.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Report to TAC June In Brief Working Group Reports Working Group Reports CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Other Reports Other Reports NOGRR.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Report to TAC February In Brief WMS 2010 Goals WMS 2010 Goals WMS Leadership for 2010 WMS Leadership for 2010 Chair: Barbara Clemenhagen Chair:
Protocol Revision Subcommittee
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Presentation transcript:

Report to TAC March 2010

In Brief Voting Items Voting Items GATF – WMS endorsed the recommendations of the GATF GATF – WMS endorsed the recommendations of the GATF WCATF – WMS endorsed Wind Plus Load Ratio Share proposal and directed WCATF develop appropriate NPRR language WCATF – WMS endorsed Wind Plus Load Ratio Share proposal and directed WCATF develop appropriate NPRR language NPRR 091 – Took 2 votes and endorsed NPRR 091 with changes to , in order to allow cost recovery for units using fuel oil. NPRR 091 – Took 2 votes and endorsed NPRR 091 with changes to , in order to allow cost recovery for units using fuel oil. WMS – endorsed minor change to procedures… WMS shall follow the election process as described in the TAC Procedures, Section III… when electing the WMS Chair and Vice-Chair. WMS – endorsed minor change to procedures… WMS shall follow the election process as described in the TAC Procedures, Section III… when electing the WMS Chair and Vice-Chair. Working Group Reports Working Group Reports CMWG, DSWG, QMWG – updates only no votes taken CMWG, DSWG, QMWG – updates only no votes taken MCWG MCWG CWG/MCWG merger into TAC Subcommittee with voting structure? CWG/MCWG merger into TAC Subcommittee with voting structure? “e” factor recommendation or discussion at April TAC “e” factor recommendation or discussion at April TAC WMS endorsed draft NPPR - DAM & Real-Time Market Default Allocation Changes with WMS corrections and any ERCOT staff clean-up WMS endorsed draft NPPR - DAM & Real-Time Market Default Allocation Changes with WMS corrections and any ERCOT staff clean-up

In Brief Working Groups (cont’) Working Groups (cont’) VCWG VCWG WMS endorsed standard cost option, directed VCWG to draft NPRR and provide recommendation regarding switching and escalation factors WMS endorsed standard cost option, directed VCWG to draft NPRR and provide recommendation regarding switching and escalation factors Task Forces Task Forces QSTF – WMS endorsed NPRR 207, as submitted, and requested review by ERCOT to determine if it can be done by TNMID QSTF – WMS endorsed NPRR 207, as submitted, and requested review by ERCOT to determine if it can be done by TNMID MIGTF - Interconnection Date for Protocol Considerations NPRR to be drafted by M. Bruce. Minimum Cost Planning Concept to be referred to RPG for inclusion in GENERATION INTERCONNECTION OR CHANGE REQUEST PROCEDURE MIGTF - Interconnection Date for Protocol Considerations NPRR to be drafted by M. Bruce. Minimum Cost Planning Concept to be referred to RPG for inclusion in GENERATION INTERCONNECTION OR CHANGE REQUEST PROCEDURE Other Activities Other Activities NPRR211 – Modify RUC Capacity Short Charge to Use Final Energy Trades – WMS recommended that PRS table to allow further discussion. WMS will discuss on March 24 and report back at the March PRS meeting NPRR211 – Modify RUC Capacity Short Charge to Use Final Energy Trades – WMS recommended that PRS table to allow further discussion. WMS will discuss on March 24 and report back at the March PRS meeting NPRR212 – Disputing Fuel Oil Price (FOP) Costs – WMS endorsed with Luminant comments and minor correction NPRR212 – Disputing Fuel Oil Price (FOP) Costs – WMS endorsed with Luminant comments and minor correction Nodal Reliability Must-Run (RMR) : ERCOT Created Three-Part Supply Offer – referred to QMWG Nodal Reliability Must-Run (RMR) : ERCOT Created Three-Part Supply Offer – referred to QMWG

TAC Voting Item Generation Adequacy Task Force Generation Adequacy Task Force WMS endorsed GATF recommendations: WMS endorsed GATF recommendations: LOLP Study Review/Load Forecasting/EILS and other LOLP Study Review/Load Forecasting/EILS and other CDR Inputs, Calculations and Format CDR Inputs, Calculations and Format Installed Capacity Assumptions – use RARF Installed Capacity Assumptions – use RARF New Unit Additions – affirmative declaration New Unit Additions – affirmative declaration Renewables – Wind: effective load carrying capability / Solar: RARF Renewables – Wind: effective load carrying capability / Solar: RARF Mothballed Capacity – no change Mothballed Capacity – no change DC Tie Capacity – no change DC Tie Capacity – no change Switchable Capacity - RARF Switchable Capacity - RARF Netting of Generation and Load – no change Netting of Generation and Load – no change Retired Capacity – introduce “pending unit requirements” line Retired Capacity – introduce “pending unit requirements” line CDR Format – move Summer and Winter Capacities closer to front CDR Format – move Summer and Winter Capacities closer to front

TAC Voting Item TAC Recommended Motion: Move to endorse WMS recommendation to adopt the GATF report recommendations.

TAC Voting Item Wind Cost Allocation Task Force (WCATF) Wind Cost Allocation Task Force (WCATF) Two allocation methodologies were proposed for WMS Consideration Two allocation methodologies were proposed for WMS Consideration Wind Plus Load Ratio Share Proposal ( ENDORSED ) Wind Plus Load Ratio Share Proposal ( ENDORSED ) Wind generators receive a hedgeable ancillary service obligation for responsive reserves, non-spinning reserves, regulation up, and regulation down Wind generators receive a hedgeable ancillary service obligation for responsive reserves, non-spinning reserves, regulation up, and regulation down Wind generators can reduce the obligation by qualifying for “reliability credits” Wind generators can reduce the obligation by qualifying for “reliability credits” Incremental Allocation Proposal Incremental Allocation Proposal WMS also heard a presentation that advocated for no action to be taken regarding WCA WMS also heard a presentation that advocated for no action to be taken regarding WCA

TAC Voting Item WMS Motion WMS Motion WMS endorsed the Wind Plus Load Ratio Share proposal and directed WCATF to develop appropriate NPRR language WMS endorsed the Wind Plus Load Ratio Share proposal and directed WCATF to develop appropriate NPRR language Motion carries: 61.1% to 38.9% Motion carries: 61.1% to 38.9% TAC Recommended Motion: Move to endorse WMS recommendation to adopt the Wind Plus Load Ratio Share Proposal and direct WMS to draft protocol language.

TAC Voting Item NPRR 091 NPRR 091 WMS hosted Special Meeting to discuss and address recent comments to NPRR 091 WMS hosted Special Meeting to discuss and address recent comments to NPRR NPRR-28 Steel Group Comments091NPRR-28 Steel Group Comments 091NPRR-28 Steel Group Comments091NPRR-28 Steel Group Comments 091NPRR-27 REP Nodal Group Comments091NPRR-27 REP Nodal Group Comments 091NPRR-27 REP Nodal Group Comments091NPRR-27 REP Nodal Group Comments 091NPRR-25 Luminant Comments091NPRR-25 Luminant Comments 091NPRR-25 Luminant Comments091NPRR-25 Luminant Comments Commission Staff, ERCOT and the IMM were present and updated WMS on the status of potential need for changes under P.U.C. SUBST. R to allow for a temporary mitigated offer cap. Commission Staff, ERCOT and the IMM were present and updated WMS on the status of potential need for changes under P.U.C. SUBST. R to allow for a temporary mitigated offer cap. After a robust discussion a Motion was made to endorse NPRR 091 in form proposed by Steel group; this Motion Failed After a robust discussion a Motion was made to endorse NPRR 091 in form proposed by Steel group; this Motion Failed

TAC Voting Item NPRR 091 NPRR 091 A second Motion was made to endorse the concept of revising Section , Scarcity Pricing and Mitigated Offer Cap During Nodal Startup, in order to allow cost recovery for units using fuel oil; this Motion Passed A second Motion was made to endorse the concept of revising Section , Scarcity Pricing and Mitigated Offer Cap During Nodal Startup, in order to allow cost recovery for units using fuel oil; this Motion Passed Subsequent to the Special Meeting, Luminant filed comments to the NPRR which addressed the WMS recommendation and other options. Subsequent to the Special Meeting, Luminant filed comments to the NPRR which addressed the WMS recommendation and other options. comments The Commission met today. The Commission met today. WMS endorses changes to in the Luminant comments but defers on making a motion recommendation.

Working Group Reports CMWG Presentation available at Presentation available at Main topics Main topics Operation of Phase Shifting Transformers Operation of Phase Shifting Transformers Yellow Jacket Phase Shifter In Service Date Yellow Jacket Phase Shifter In Service Date ERCOT Coordinating with AEP to optimize flows ERCOT Coordinating with AEP to optimize flows Constraint Competitiveness Test Status Constraint Competitiveness Test Status GOAL: recommendation of Competitive Constraints to April WMS GOAL: recommendation of Competitive Constraints to April WMS Next Meeting: March 09 and March 29, 2010 Next Meeting: March 09 and March 29, 2010

Working Group Reports DSWG Presentation available at Presentation available at

Working Group Reports DSWG EILS improvement group met on February 26 th EILS improvement group met on February 26 th Topics were: Topics were: Substitution rules Substitution rules Reinstatement procedures and timeline Reinstatement procedures and timeline Review baseline performance Review baseline performance Bidding processes Bidding processes Meter data submittal Meter data submittal Procurement schedule Procurement schedule Next DSWG Meeting is March 5 th Next DSWG Meeting is March 5 th

Working Group Reports QMWG Presentation available at Presentation available at Main Topics Main Topics Definition of WGR and implementation of PRR830 Definition of WGR and implementation of PRR830 WGRPP Forecast Accuracy Update WGRPP Forecast Accuracy Update Load Forecasting Accuracy Load Forecasting Accuracy Zonal RPRS unit de-selection Zonal RPRS unit de-selection Implementation of PRR811 Implementation of PRR811 Draft NPRR, WGR HSL update process (possible Vote) Draft NPRR, WGR HSL update process (possible Vote) SCR757, Real Time Wind Production by Zone SCR757, Real Time Wind Production by Zone Forecasting Ancillary Service Requirements Forecasting Ancillary Service Requirements Next QMWG Meeting: March 8 th Next QMWG Meeting: March 8 th

Working Group Reports MCWG Presentation available at Presentation available at Main topics Main topics NPRR 206 – ERCOT Board Action NPRR 206 – ERCOT Board Action WMS directed MCWG to define “e” factors with goal of April TAC and Board Meeting WMS directed MCWG to define “e” factors with goal of April TAC and Board Meeting MCWG and CWG – 1 credit subcommittee? MCWG and CWG – 1 credit subcommittee? WMS endorsed NPPR - DAM & Real-Time Market Default Allocation Changes – ERCOT reviewing WMS recommendation, NPRR should be submitted soon. WMS endorsed NPPR - DAM & Real-Time Market Default Allocation Changes – ERCOT reviewing WMS recommendation, NPRR should be submitted soon. Update on Short-Pay Fund - a subgroup has been set up to discuss and e Update on Short-Pay Fund - a subgroup has been set up to discuss and expectation is that a proposal will be available for WMS for March 2010 Next Meetings – March 8, 12 and 26 th

Working Group Reports VCWG Presentation available at Presentation available at Main Topics T he standard cost proposal, as presented by VCWG in the whitepaper, was endorsed and VCWG was directed to develop NPRR language, review hydro issue (should Hydro be with Coal or explicitly not RUC’d), review requests for additional technologies to be added to the proposal, make a recommendation to WMS on escalation factors for Standard Costs and options for switching from VC to SC and vice-versa. T he standard cost proposal, as presented by VCWG in the whitepaper, was endorsed and VCWG was directed to develop NPRR language, review hydro issue (should Hydro be with Coal or explicitly not RUC’d), review requests for additional technologies to be added to the proposal, make a recommendation to WMS on escalation factors for Standard Costs and options for switching from VC to SC and vice-versa. whitepaper Some minor changes were also made to the Manual for i) a change control process, ii) allow fuel from breaker close to LSL and iii) affidavit. Some minor changes were also made to the Manual for i) a change control process, ii) allow fuel from breaker close to LSL and iii) affidavit. Next Meeting: not scheduled at time of ppt Next Meeting: not scheduled at time of ppt

Working Group Reports VCWG Standard Costs 1. Options for Filing Verifiable Costs a) File Verifiable Costs. b) File with election of Standard O & M Costs by Technology. 1. Standard O & M per Startup by Technology - $ per Start 2. Standard O & M for Energy - $/MWH 3. Will have to provide Actual fuel flows, Heat Rate Curves, emissions rates, ect. c) Nodal Generics will be used for entities that do not elect option a or b.

Working Group Reports VCWG Standard Costs WMS endorsed $/MWH for standard O & M Costs.

Other Activities NPRR211: Modify RUC Capacity Short Charge to Use Final Energy Trades NPRR211: Modify RUC Capacity Short Charge to Use Final Energy Trades PRS referred NPRR211 to WMS to allow for further time to work on revisions and additional discussion at the March 2010 WMS meeting, and requested that WMS report back at the March 2010 PRS meeting. PRS referred NPRR211 to WMS to allow for further time to work on revisions and additional discussion at the March 2010 WMS meeting, and requested that WMS report back at the March 2010 PRS meeting. NPRR212 Disputing Fuel Oil Price (FOP) Costs NPRR212 Disputing Fuel Oil Price (FOP) Costs WMS endorsed NPRR212 as amended by the 2/15/10 Luminant Energy comments and as revised by WMS. There was one opposing vote from the Consumer Market Segment. WMS endorsed NPRR212 as amended by the 2/15/10 Luminant Energy comments and as revised by WMS. There was one opposing vote from the Consumer Market Segment.

Inactive Task Force Joint ROS/WMS Multiple Interconnection of Generation Task Force (MIG TF) Joint ROS/WMS Multiple Interconnection of Generation Task Force (MIG TF) TF has be disbanded TF has be disbanded WMS Action to be taken: WMS Action to be taken: Market Participant Notification Period (Transmission outage) Market Participant Notification Period (Transmission outage) ROS ROS Interconnection Date for Protocol Considerations Interconnection Date for Protocol Considerations Mark Bruce shall draft protocols to introduce generation operation date. The generation operation date shall define what the generation unit is expected to do, and the Interconnection Date would define the requirements of equipment at the point of interconnection. Existing resources reconnecting to a different line would be grandfathered to the date of the original interconnection. Mark Bruce shall draft protocols to introduce generation operation date. The generation operation date shall define what the generation unit is expected to do, and the Interconnection Date would define the requirements of equipment at the point of interconnection. Existing resources reconnecting to a different line would be grandfathered to the date of the original interconnection. Planning Concept Endorsement Planning Concept Endorsement Option – B - Minimal Cost - As a default view TSPs would try to minimize the cost of Transmission, (ERCOT process does not change regarding optimization). Option – B - Minimal Cost - As a default view TSPs would try to minimize the cost of Transmission, (ERCOT process does not change regarding optimization). TO BE DRAFTED BY RPG TO BE DRAFTED BY RPG

WMS 2010 Goals Item [WMS to set prioritization]Item [WMS to set prioritization]WMS input/direction needed byWMS input/direction needed by Nodal Market TransitionNodal Market TransitionOn-going Market Participant Readiness Market Participant Readiness TCR to CRR Transition TCR to CRR Transition Nodal Protocol Tracebility Nodal Protocol Tracebility Nodal Parking Deck Nodal Parking Deck Nodal Test Evaluation Nodal Test Evaluation Nodal Verifiable Cost MethodologyNodal Verifiable Cost MethodologyOn-going (VCWG)On-going (VCWG) Consideration of necessary Zonal Market changesConsideration of necessary Zonal Market changesBefore Q2Before Q2 Review of Generation Adequacy in ERCOTReview of Generation Adequacy in ERCOTQ1 (GATF)Q1 (GATF) Market Issues Related to:Market Issues Related to: Credit issuesCredit issuesOn-going (MCWG)On-going (MCWG) EILSOn-going (DSWG)On-going (DSWG) Reliability & A/S Dispatch Impacts on Energy MarketsReliability & A/S Dispatch Impacts on Energy MarketsOn-going Market Event EvaluationMarket Event EvaluationOn-going Adv. meters & other demand response in A/S and Energy MarketsAdv. meters & other demand response in A/S and Energy MarketsOn-going (DSWG)On-going (DSWG) Wind & related renewable technology integrationWind & related renewable technology integrationOn-going (various WG)On-going (various WG) Criteria in Nodal for supplying A/S, Energy and Capacity MarketsCriteria in Nodal for supplying A/S, Energy and Capacity MarketsOn-going (WMS)On-going (WMS) Integration of Quick Start Resources into NodalIntegration of Quick Start Resources into NodalQSTF Power Storage DevicesOn-going (TBD) LaaR Responsive Reserve Performance Penalty On-going (DSWG)On-going (DSWG)