1 Assemble Exploded Model GUI Familiarity Level Required: Lower Estimated Time Required: 30 minutes MSC.ADAMS 2005 r2.

Slides:



Advertisements
Similar presentations
GUI familiarity level required: Higher
Advertisements

Webcutter Estimated time required: 40 min
Crank Slider MSC.ADAMS 2005 r2 Estimated time required: 20 min
1.Navigation to other Google Apps. 2.Current logged in user. Settings – Account settings Help Sign out of Google 3.Search Calendars (full text search including.
O-Ring Estimated Time for Completion: 30 minutes Experience Level: Lower MSC.Marc 2005r2 MSC.Patran 2005r2.
Rubber Seal Estimated Time for Completion: 30 minutes Experience Level: Lower MSC.Marc 2005r2 MSC.Patran 2005r2.
1 Four Bar Velocity Estimated time required: 15 min GUI familiarity level required: Higher MSC.ADAMS 2005 r2.
PowerPoint Animation Jolene Hyppa Martin and Kristen Eklund.
1 Impulsive Force GUI Familiarity Level Required: Lower Estimated Time Required: 20 minutes MSC.ADAMS 2005 r2.
Controls Toolkit in ADAMS/View
Introduction to Audio Recording Created by The University of North Texas in partnership with the Texas Education Agency.
1 Simple Pendulum Estimated time required: 20 min GUI familiarity level required: Lower MSC.ADAMS 2005 r2.
Spring Design using Parametric Modeling
Spring-Mass Damper MSC.ADAMS 2005 r2
WORKSHOP 8 NONLINEAR CONTACT
Basic Pspice Instructions Stuart Tewksbury
WORKSHOP 7 TAPERED PLATE WS7-1 NAS120, Workshop 7, November 2003.
SEMS allows you to create reports based on your files. This guide will give you the steps to create a report on the SEMS site using the Question Wizards.
1 Pulley System GUI Familiarity Level Required: Lower Estimated Time Required: 40 minutes MSC.ADAMS 2005 r2.
ADAMS Assignment 4 ME451:Kinematics and Dynamics of Machine Systems.
Using MD Nastran/Patran and MSC.Adams together
Incline Plane MSC.ADAMS 2005 r2 Estimated time required: 15 min
CONTACT ANALYSIS USING 3D BOLTS
Gear Train MSC.ADAMS 2005 r2 GUI Familiarity Level Required: Low
1 F F Double-Cantilevered Bar Estimated time for completion: ~20 min Experience Level: Lower MSC.Patran 2005 r2.
ME451:Kinematics and Dynamics of Machine Systems (Spring 09)
WS09-1 VND101, Workshop 09 MSC.visualNastran 4D Exercise Workbook Belted Cylinder.
1 Projectile Estimated time required: 20 min GUI familiarity level required: Higher MSC.ADAMS 2005 r2.
ADAMS Assignment 1 ME451:Kinematics and Dynamics of Machine Systems (Fall 2013) Assigned: September 18, 2013 Due: September 25, 2013.
ME 451 Introduction to ADAMS/View. VIRTUAL PROTOTYPING PROCESS Build a model of your design using: Bodies Forces Contacts Joints Motion generators BuildTestReview.
1 MSC ADAMS 2005 r2 Crank Slider Mechanism on Incline Plane GUI Familiarity Level Required: Lower Estimated Time Required: 1 hour.
1 Short-Long Arm Suspension GUI Familiarity Level Required: Lower Estimated Time Required: 40 minutes MSC.ADAMS 2005 r2.
Modal Analysis of a Simple Cantilever
1 Extrusion GUI Familiarity Level Required: Lower Estimated Time Required: 30 minutes MSC.ADAMS 2005 r2.
Hertz Contact Estimated Time for Completion: 30 minutes Experience Level: Lower MSC.Marc 2005r2 MSC.Patran 2005r2.
WS13-1 ADM740, Workshop 13, June 2007 Copyright  2007 MSC.Software Corporation WORKSHOP 13 EXPLORING AND COMPLETING TEMPLATES.
WORKSHOP 1 STEADY STATE HEAT TRANSFER WORKSHOP 1 STEADY STATE HEAT TRANSFER.
1 Oscillating Slider Estimated time required: 25 min GUI familiarity level required: Higher MSC.ADAMS 2005 r2.
Creating Your First Web Page – Topic: Creating a wiki, blog, image blog and podcast Click Arrow - Next Slide 1.
1 Bridge Truss Structure Estimated time required: ~30 min Experience level: Lower MSC.Patran 2005 r2.
LANDING GEAR STRUT ANALYSIS
WS8C-1 WORKSHOP 8C TENSION COUPON NAS120, Workshop 8C, November 2003.
WS Mar120 - Patran Day 1 Overview - Results POST PROCESSING OF STRESS RESULTS.
WS-1 WORKSHOP Define Equivalent Section Plate Properties NAS121, Workshop, May 6, 2002.
WS6-1 WORKSHOP 6 BRIDGE TRUSS NAS120, Workshop 6, November 2003.
GEOMETRY MODEL OF A 3-D CLEVIS
1 Accelerating Links Estimated time required: 20 min GUI familiarity level required: Higher MSC.ADAMS 2005 r2.
Fix Redundant Constraints With Revolute, Spherical, and Hooke Joint.
ADAMS Assignment 6 ME451:Kinematics and Dynamics of Machine Systems (Fall 2013) Assigned: November 13, 2013 Due: November 20, 2013.
1 Billiards GUI Familiarity Level Required: Higher Estimated Time Required: 30 minutes MSC.ADAMS 2005 r2.
Workshop 5-1 NAS101 Workshops Copyright  2001 MSC.Software Corporation WORKSHOP 5 Stiffened Plate Subjected to Pressure Load.
WS4-1 WORKSHOP 4 Stadium Truss NAS120, Workshop 4, November 2003.
WS9A-1 WORKSHOP 9A 2½ D CLAMP – SWEEP MESHER NAS120, Workshop 9A, November 2003.
WS5-1 ADM , Workshop 5, August 2005 Copyright  2005 MSC.Software Corporation WORKSHOP 5 PARAMETERIZING A NEW MODEL.
1 Forklift Estimated time required: 20 min GUI familiarity level required: Higher MSC.ADAMS 2005 r2.
ADAMS Assignment 1 ME451:Kinematics and Dynamics of Machine Systems (Spring 09)
COMPREHENSIVE Access Tutorial 1 Creating a Database.
Workshop 9-1 NAS101 Workshops Copyright  2001 MSC.Software Corporation WORKSHOP 9 Buckling Analysis of Plate.
WS8A-1 WORKSHOP 8A TENSION COUPON NAS120, Workshop 8A, November 2003.
WS1-1 ADM , Workshop 1, August 2005 Copyright  2005 MSC.Software Corporation WORKSHOP 1 INTRODUCTION.
NAS133, Workshop 2, August 2011 Copyright© 2011 MSC.Software Corporation WS2 - 1 WORKSHOP 2 SOLID-TO-SOLID CONTACT.
Workshop 7B-1 NAS101 Workshops Copyright  2001 MSC.Software Corporation WORKSHOP 7B Structure With Spring Support.
Workshop 4-1 NAS101 Workshops Copyright  2001 MSC.Software Corporation WORKSHOP 4 Structure Subjected to Enforced Displacement at an incline.
WORKSHOP 5 PROJECTILE MOTION. Workshop Objectives –To compute the range, R, when a stone is launched as a projectile with an initial speed of 6 m/s.
WORKSHOP 3 Belt Modeling – Lawn Mower
Workshop 12 atv – lower control arm
WORKSHOP 1 introduction
WORKSHOP 12 SUSPENSION SYSTEM II
Crank Slider MSC.ADAMS 2005 r2 Estimated time required: 20 min
Flexible Link in Four-Bar
Presentation transcript:

1 Assemble Exploded Model GUI Familiarity Level Required: Lower Estimated Time Required: 30 minutes MSC.ADAMS 2005 r2

2 Topics Covered In this tutorial you will learn how to: If you have any difficulties, import the “assemble_exploded_model_shortcut_1.cmd” file and proceed from pg 16 If you have any difficulties, import the “assemble_exploded_model_shortcut_2.cmd” file and proceed from pg 19 If you have any difficulties, import the “assemble_exploded_model_complete.cmd” file and proceed from pg 23 1.Create Marker 2.Create Link 3.Create Marker 4.Create Revolute joint between 2 Bodies and 2 Locations 5.Create Spherical joint between 2 Bodies and 2 Locations 6.Create Hooke joint between 2 Bodies and 2 Locations 7.Create Cylindrical joint between 2 Bodies and 2 Locations 8.Perform initial conditions solution

3 Assemble Exploded Model This tutorial shows how you can build a model in an exploded or unassembled form and automatically have it assemble before simulation. This can be useful if your model is complicated and has many small and closely connected parts.

4 What You Should Accomplish When you complete this tutorial you will have an exploded model that assembles and then runs a simulation.

5 Getting Started f b c d e a Getting Started: a.Under the heading "How would you like to proceed", select the Create a new model radio button. b.Choose a Location to save your files c.Set Model Name as assemble_exploded_model d.Verify the Gravity text field is set to Earth Normal (-Global Y). e.Verify that the Units text field is set to MKS - m,kg,N,s,deg. f.Select OK.

6 Create Marker a.Click on the View menu, select Coordinate Window b.Select Marker tool from Rigid Body tool stack c.Click (0, -0.5, 0) a b c

7 Create Markers marker 010.0, -0.5, 0.0 marker 020.0, 1.5, 0.0 marker , 2.75, 0.0 marker , 2.75, 0.0 marker , -1.0, 0.0 marker , 5.0, 0.0 marker , 3.5, 0.0 marker 085.6, 3.5, 0.0 marker 099.5, 3.5, 0.0 marker , 0.5, 0.0 marker , 3.5, 0.0 marker 129.0, 1.0, 0.0 Create markers at the following locations:

8 Create Link a.Select Link tool from Rigid Body tool stack b.Turn on the Width check box, enter (20.0cm) in the text field below c.Turn on the Depth check box, enter (5.0cm) in the text field below d.Click ground.MARKER_1 e.Click ground.MARKER_2 a b c d e

9 Create Links Create Links between: a.ground.Marker_3 and ground.marker_4 b.ground.Marker_5 and ground.marker_6 c.ground.Marker_8 and ground.marker_9 d.ground.Marker_10 and ground.marker_11 a b c d

10 Create Polyline a.Select Polyline tool from Rigid Body tool stack b.Select On Ground from pull down arrow c.Click (-0.2, 0.4, 0.0) d.Click (0.2, 0.4, 0.0) e.Click (0.2, -0.65, 0.0) f.Click (-0.2, -0.65, 0.0) g.Click (-0.2, 0.4, 0.0) h.Right-click to close a b g cd e f

11 Create Polyline Create Polyline: a.(5.55, -0.85, 0.0) (5.95, -0.85, 0.0) (5.95, -1.15, 0.0) (5.55, -1.15, 0.0) (5.55, -0.85, 0.0) b.(8.85, 0.95, 0.0) (9.15, 0.95, 0.0) (9.15, 1.15, 0.0) (8.85, 1.15, 0.0) (8.85, 0.95, 0.0) a b

12 Create Box a.Select Box from Rigid Body tool stack b.Select Add to Part from Box pull down arrow c.Turn on Length checkbox, enter (80.0cm) in the text field below d.Turn on Height checkbox, enter (80.0cm) in the text field below e.Turn on Depth checkbox, enter (20.0cm) in the text field below f.Click PART_5 g.Click (5.25, 3.1, 0) a b c d e g f

13 Modify Box Location a.Right-click on box, select Marker: MARKER_24  Modify b.Enter 5.25, 3.1, -0.1 in Location text field c.Click OK a b c

14 Add Revolute Joint a.Select Revolute joint from Joint stack b.Select 1 Location from Construction pull down menu c.Click on ground.MARKER_1 a b c

15 Create Revolute Joint a.Create a revolute joint at ground.MARKER_5 a

16 Create 2 Body – 2 Location Revolute Joint a.Click Revolute joint b.Select 2 Bod-2 Loc from Construction pull down menu c.Click PART_6  ground  marker 11  marker 12 c b a

17 Add Rotational Motion a.Click Rotational Motion from Motion Driver tool stack b.Enter (360d) in Speed text field c.Click JOINT_1 a b c

18 Create 2 Body – 2 Location Spherical Joint a.Select Spherical Joint from Joint tool stack b.Select 2 Bod-2 Loc from Construction pull down menu c.Click PART_2  PART_3  ground.MARKER_2  ground.MARKER_3 d.Create a second 2 Bod – 2 Loc spherical joint: PART_5  PART_6  ground.MARKER_9  ground.MARKER_10 a b c d

19 Create 2 Body – 2 Location Hooke Joint a. Select Hooke Joint from Joint tool stack b. Select 2 Bod-2 Loc from Construction pull down menu c. Click PART_3  PART_4  ground.MARKER_4  ground.MARKER_6  cm (PART_3)  MARKER_17.X a c b

20 Create 2 Body – 2 Location Cylindrical Joint a.Select Cylindrical Joint from joint tool stack b.Select 2 Bod-2 Loc from Construction pull down menu c.Click PART_4  PART_5  ground.MARKER_7  ground.MARKER_8  cm (PART_4)  MARKER_5 a b c

21Verify Verify your model NOTE: ADAMS/Solver will display errors because the distance between the two parts is too far for a joint to exist.

22Model This is what your screen should look like when your model is complete

23 Run Simulation a.Click Simulation tool b.Click button c.Click Perform initial conditions solution tool d.Select Step Size from pull down arrow, enter 0.01 e.Click Play e d a b c

24 Topics Covered In this tutorial you will learn how to: 1.Create Marker 2.Create Link 3.Create Marker 4.Create Revolute joint between 2 Bodies and 2 Locations 5.Create Spherical joint between 2 Bodies and 2 Locations 6.Create Hooke joint between 2 Bodies and 2 Locations 7.Create Cylindrical joint between 2 Bodies and 2 Locations 8.Perform initial conditions solution

25 Make sure the units are correctly set. Make sure the joints is in the correct direction. Check dimensions of your parts to make sure they are correct. Check orientation of the parts and joints to make sure it is correct. Make sure your model verification is successful Make sure the measures are set properly. Make sure the plot is displaying the correct set of results. Best Practices