Status 100% 30% 100% STATUS REPORT on Electromagnetical Perturbations on the Hardwired Safety Alarms  The investigations to understand the causes of hardwired.

Slides:



Advertisements
Similar presentations
R. Nunes, L. Scibile M. Bätz Protection Electromagnétique pour les Alarmes de Niveau 3.
Advertisements

Interface and cabling characterization for SKA Paul van der Merwe Prof. HC Reader Stellenbosch University.
Inspection & Preventive maintenance of breakers
André Augustinus 16 June 2003 DCS Workshop Safety.
[ 1 ] LVDS links Servizio Elettronico Laboratori Frascati INFN - Laboratori Nazionali di Frascati G. Felici LVDS links.
Optical SmartLink EE513 Communication Electronics Zheng Wang Xin Li Jialock Wong.
Workshop 7 of 7 Welcome!. Today's Topics Data Acquisition MAX DAQ Assistant Express VI DAQmx API Create Task Configure Task Configure Trigger Start Task.
Removing 60 Hz from EKG signal William Rose, May 2009 Original EKG signal looked good on paient monitor but had very small amplitude (+- 4 bits) at the.
Programmable Logic Controllers
Designing a EMC Compatible Electronic Meter using AD7755 a.
Previous Lecture 12 Voltage Dividers with Resistive loads.
EMC review for Belle II (Grounding & shielding plans) Sub-systems ( XXXXX)
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Motors Make the world go ‘round By Jackson Greer, Room 305.
ITF Flash:Ti Status Modulator √ Thyratron heater power supply √
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Electronic Engineering Final Year Project Progress Presentation Title: Electromagnetic shielding techniques for inductive powering applications Supervisor.
1 RWM P OWER FEED TO EACH COIL S. Ramakrishnan. 01/29/20102 RWM COILS Existing Status The Six RWM coils are grouped in pairs Each Pair is fed from one.
Communication Markets Division © 3M All Rights Reserved. Telecom Visit for Noise Mitigation Improve Network Performance with 3M™ Solutions.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 1 v3.1 Module 3 Networking Media.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
Copyright ©2011 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Introduction to Engineering Experimentation, Third.
1 of 7 Displays Voltage Displays Current Adjusts Voltage Output voltage is available at these terminals; the + is at a higher voltage than the - Photo.
Chapter 20 Capacitors in Series and Parallel Capacitors in Circuits Like resistors, capacitors in circuits can be connected in series, in parallel, or.
07 - Winter 2005 ECE ECE 766 Computer Interfacing and Protocols 1 Grounding Grounds: –Common reference for the circuit –Safety What is the potential problem.
Logic Functions and Symbols
Etienne CARLIER, LBDS Audit, 28/01/2008 LBDS Environmental Aspects EMC, radiation, UPS… Etienne CARLIER AB/BT/EC.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Hoeffelman_BE_ALPHA 2_Block 1 Barcelona May EMI-EMF update Recent achievement and work going on in relevant WG’s Jean Hoeffelman ELIA- Belgium.
Operational Amplifiers Op Amps – a useful building block K. El-Ayat 11.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the CON-DVT-IOE. Intellect 1.5 is used for the software portion. NEXT.
3.TRANSISTOR CIRCUIT CONFIGURATION
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
CABLING SYSTEM PROTECTION. Screening/Shielding  1 In the Signamax Cabling System for the efficient screening of the telecommunications systems, the screen.
Grounding.
1  Jan-16 BACKSlide 1 / 13 CST-380-MWS_EMC+EMI-Examples.ppt ESD generator discharged into a large ground plane.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
Matthew Gates Fire Safety Always know where fire exits are Know where all the fire extinguishers are Evacuate immediately when fire alarm sounds.
M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May RISK CRITERIA TO APPLY AND MANAGE DISTRIBUTION TRANSFORMERS M.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
Dr.F. Arteche EMC DEPFET Project: A general overview.
Electronic Circuits, Tenth Edition James W. Nilsson | Susan A. Riedel Copyright ©2015, 2008, 2005 by Pearson Education, Inc. All rights reserved. Figure.
LIGHTENING PROTECTION USING LFA-M
EMC issues for cabling and racks layout design. (Belle II – Grounding) F.Arteche.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
Crosstalk Crosstalk is the electromagnetic coupling among conductors that are close to each other. Crosstalk is an EMC concern because it deals with the.
Relay Controller Device. 2 Relay Controller Device (RCD) If additional relays are needed beyond the two that are available on the DCD, then a RCD can.
EMC review for Belle II (Grounding & shielding plans) PXD system - July 2012 Dr. Fernando Arteche.
IEEE NPEC SC2 Equipment Qualification Electromagnetic Compatibility Compliance Type Test-Design Considerations- Installation and Mitigation Standard/Guidance.
Figure 3.1 Stages in electrical signal measuring system.
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Grounding.
NWU IT-ES/NWU IT-ELD Monitoring systems
Beam Interlock System SPS CIBU Connection Review
Site Controller Unit and Trunk Interface Unit
INDUCTION MOTOR PROTECTION FOR SINGLE PHASING, OVERVOLTAGE AND OVER TEMPERATURE Submitted by:
Burst Test Test-Bed LHC120A-10V 4 Quadrant Converter: Burst Tests
1v0.
Question & Suggestions March 17th
Electrical Glitch 06:02 Electrical glitch is seen on all circuits connected to the 18kV (RD1.LR1, RD1.LR5, RD34.LR3, RD34.LR7)
HCAL HV splice box.
Nodes, Branches, and Loops
Field Photos
Tunnel hardware installation
Chapter 20 Capacitors in Series and Parallel
KFA10 status 03/06/2019 Currently:
Presentation transcript:

Status 100% 30% 100% STATUS REPORT on Electromagnetical Perturbations on the Hardwired Safety Alarms  The investigations to understand the causes of hardwired alarm level 3 induced by electromagnetic perturbations in correspondence of the 18kV power breakdown indicated two actions: A Implementation of a low-pass filter on the input of the hardware-triggering unit, A Revision of the shielding and grounding of the existing hardwired network. A Implementation of a data logger on the main hardwired links.

Status OK OK OK OK STATUS REPORT on Electromagnetical Perturbations on the Hardwired Safety Alarms  Implementation of a low-pass filter on the input of the hardware-triggering unit A Designed using MATLAB and test field measurements A Installed, tested and in operation since May 2001 A NO spurious alarms due to Electromagnetical Perturbations have been recorded A Inspected by TIS and their EMC consultant

Triggering unit’s equivalent circuit: with and without the input filter.

Comparison between the experimental data and the simulations

Note that the input voltage of the triggering units follows closely the perturbation in case A Note that the presence of the input filter avoids that short-lived events trigger alarm while long- lived events trigger alarm

Status OK OK Planned Planned STATUS REPORT on Electromagnetical Perturbations on the Hardwired Safety Alarms  Revision of the shielding and grounding of the existing hardwired network. A Review of the existing cable paths and rack location A First TIS and EMC consultant audit A Recommendations by TIS expected middle October 2001 A Work on the cable connections, terminations and shielding start middle October 2001

Status OK STATUS REPORT on Electromagnetical Perturbations on the Hardwired Safety Alarms  Implementation of a data logger on the main hardwired links. A Design, installation and testing of a LabVIEW data logger

Photos of the Installation Filters Data Logging HW Alarm Terminal blocks