1 Zone 4 Line A Rand Eads RiverMetrics LLC 503-435-7516 Sources Pathways and Loadings Workgroup May 14, 2008.

Slides:



Advertisements
Similar presentations
Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009 Item #4.
Advertisements

Zone 4 Line A Preliminary Suspended Sediment Load Estimates HY08 Rand Eads RiverMetrics LLC Sources.
San Francisco Estuary Institute Small Tributaries Loading Study #2 Zone 4 Line A, Cabot Blvd. Hayward Year 2 – Draft Data To-date Sources Pathways and.
San Francisco Estuary Institute Small Tributaries Loading Study #2 Zone 4 Line A, Cabot Blvd. Hayward Year 2 – Draft Data To-date Sources Pathways and.
Sources Pathways and Loadings Workgroup
RMP Program Objectives & Management Questions Question 3: Describe sources, pathways, loadings, and processes leading to pollutant-related impairment in.
Starting a New Small Tributaries Loads Study WY 2007: Zone 4 Line A - Progress to-date Lester McKee and Rand Eads Sources Pathways and Loadings Workgroup.
San Francisco Estuary Institute Small Tributaries Loading Study Zone 4 Line A Sources Pathways and Loadings Workgroup May 2008 Lester McKee 1, Alicia Gilbreath.
City of Edmonton Water Quality Monitoring Locations.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
1 NAFE 2005 CS616 and Meteorological data T.Wells, C. Martinez, G. Hancock and J.D.Kalma Plan of talk: 1.Overview of the collected and missing data 2.Data/calibration.
What’s Mud Got to Do With It? Stephen J. Klaine, Ph.D. Department of Biological Sciences Clemson University
SNOW SURVEY, SNOTEL (SNOwpack TELemetry) & SCAN (Soil Climate Analysis Network) Presented at NWS Cold Regions Workshop November , 2004.
Limestone Creek at Childers Road Site 1: WWL UPSTREAM DOWNSTREAM Site 1 GEOMEAN = 984 MPN/100mL Load Duration Curve Precipitation a b ec d a e.
A New Technology Transmitter Real Time ScadaLynx Model
Benefits of a Flood Warning Network to Findlay, Ohio Brian C. Hurt, P.E. – Former City Engineer Findlay, Ohio.
Wet Weather Monitoring Program James Riddle Stormwater Management in Greenville County Greenville County, SC It All Flows Downhill: Land Use Water Quality.
Best Practices of NWS Blacksburg, VA as demonstrated during the 15 May 2009 Christiansburg, VA Flash Flood Anita Silverman & Peter Corrigan NWS Blacksburg.
Northern Segment of the Edwards Aquifer Study S PRING 2014 Stephanie S. Wong and Joe C. Yelderman Jr. Baylor University, Geology Department Tuesday, 11.
Notes on river discharge measurements
Hydrologic Theory One of the principal objectives in hydrology is to transform rainfall that has fallen over a watershed area into flows to be expected.
Draft Phase II Small MS4 General Permit Water Quality Monitoring & Assessment Jonathan Bishop Chief Deputy Director Director State Water Resources Control.
Koktuli River Instream Flow Reservation Cathy Flanagan Bristol Bay Native Association.
AgWeatherNet Precipitation Note: Be sure you have already selected your station and time before choosing this product. Select AWN Reports Click on Precipitation.
Real-Time Water Quality Monitoring for Investigating the Strengths and Weaknesses of Existing Monitoring Techniques Little Bear River Basin Jeffery S.
Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.
Brian Haggard Arkansas Water Resources Center UA Division of Agriculture Arkansas Water Resources Center.
Applying for the VT Multi-Sector General Permit Step 3. Claiming No Exposure No Exposure is one of two ways to comply with the MSGP. It is the quickest.
U.S. Department of the Interior U.S. Geological Survey Assessing Watershed Scale Responses to BMP Implementation - Fairfax County, VA - John Jastram Hydrologist.
Castro Valley Creek Stormwater Quality Monitoring Brake Pad Partnership Meeting June 22, 2005.
West Fork of the White River Stream Restoration Monitoring Dan DeVun Ecological Conservation Organization (501)
West Fork of the White River Stream Restoration Monitoring Dan DeVun Ecological Conservation Organization (501)
El Vado Dam Hydrologic Evaluation Joseph Wright, P.E. Bureau of Reclamation Technical Services Center Flood Hydrology and Meteorology Group.
Advancements in WD1 Data Collection Methods Presented by: Robert Keller Date: May 12 th, 2015.
Processing of a Fine Sediment Pulse after Dam Removal Sediment Budget and Longitudinal Trends Chiloquin Dam Removal – Sprague River Matt Cox, Desiree Tullos,
Iowa Nutrient Load Estimations for Point and Non-point Sources Iowa DNR November 14, 2012.
Instrumentation Sales & Integration Doing business in the Environmental Monitoring and Control Industry since 1993.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Filtration Observations in the Carver County WMO West Metro Water Alliance May 25, 2011 (Thanks to Kristen Larson, Carver County)
Ric Lawson Watershed Planner Huron River Watershed Council MiCorps Staff.
MyCity System Overview MyCity Remote Monitoring Systems.
COOP H.P.D. Upgrades Michael A. Asmus Regional Data Acquisition Programs Manager NWS, Southern Region Headquarters Fort Worth, TX.
Robert Brydia Project Lead, I-35 Traveler Information During Construction Texas A&M Transportation Institute WORK ZONES & LARGE TRUCKS THE CENTRAL TEXAS.
Item 3b Guadalupe River Monitoring WY 2010 Jen Hunt, Ben Greenfield, Sarah Lowe, Lester McKee Sources, Pathway, and Loading Work Group May 6th, 2010.
CONSTRUCTION UPDATE Napa Plant Site Central Unit.
Report number: Project Cost: $32,922 Project Duration: 12 months
Section 6.1 Confidence Intervals for the Mean (Large Samples) Larson/Farber 4th ed.
Findings Is the City of Oberlin a source or a sink for pollutants? Water quality in Plum Creek as a function of urban land cover Jonathan Cummings, Tami.
San Francisco Estuary Institute Small Tributaries Loading Study Zone 4 Line A Sources Pathways and Loadings Workgroup May 6 th 2010 Rand Eads RiverMetrics.
Hydrology of Inland Flooding  Stream Gauges  Hydrologic Forecast Process  Forecast Considerations  Forecast Hydrographs 3-1.
Entrega Gas Pipeline Project Wyoming Natural Gas Pipeline Authority - August 24, 2004.
Water Quality Sampling, Analysis and Annual Load Determinations for the Illinois River at Arkansas Highway 59 Bridge, 2008 Brian E. Haggard Arkansas Water.
NADP-Compatible Wet Chemistry Sampler Data Analysis, Telluride, CO Mark Williams Kim Raby University of Colorado Institute of Arctic and Alpine.
Flooding in the Amite River Basin (August 12- August 22, 2016)
Continuous Surrogate Monitoring for Pollutant Load Estimation in Urban Water Systems Anthony A. Melcher, USU Civil and Environmental.
Management of Flood Waters through Mcphee Reservoir
Tips Need to Consider When Organizing a College Event
CONSTRUCTION PROJECT IN YAGOTYN DISTRICT, KIEV REGION
ماجستير إدارة المعارض من بريطانيا
Patrick Tara, Jeff Vomacka, Mark Ross
مفهوم الموازنة العامة المقدمة
Storm Event Analysis: August 21, 2006 Amarillo, Texas
Name of Event Name of Event

(WBS ) Alan Wootton, LLNL April 24, 2002
C.2.10 Sample Questions.
C.2.8 Sample Questions.
Thing / Person:____________________ Dates:_________________
C.2.8 Sample Questions.
Commission Agenda Item #1
Presentation transcript:

1 Zone 4 Line A Rand Eads RiverMetrics LLC Sources Pathways and Loadings Workgroup May 14, 2008 Item #2b

2 HY 2008 Summary Preliminary Data Moved station to downstream end of culvert due to delayed completion of construction upstream Data collection began on 1/31/08 Low precipitation: 2.15 inches (3 months) 13 storm events Max turbidity/SSC: 892 TU/358 mg/L Max stage 2.91 ft. (3.41 ft 1/4/08 manual) 15 SSC pumped samples processed to date, 33 unprocessed, budgeted for 100 Item #2b

3 Shelter, Data Logger, Pumping Sampler, Rain Gage, Solar Panel, Cellular Telemetry Bed-Mounted Sampling Boom Staff Plate Item #2b

4

5

6

7

8

9

10 Item #2b

11 Item #2b

12 Item #2b