Www.eirgrid.com Metering Modification to T&S code Cathal Kearney Protection & Metering 03/12/2015.

Slides:



Advertisements
Similar presentations
Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.
Advertisements

1 Project Nexus Analysis of impacts and next steps Cesar Coelho Ofgem Project Nexus UNC Workgroup 03 April 2012.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
Overview of Make Whole Payments Modifications Committee Meeting February 2015.
MOD_14_12 Reference to MO Status for VTOD. Context (1)  Mod_47_08 V2  Approved by the RAs in May 2009  Implemented in the SEM systems in November 2010.
1 Mod_24_10 Introducing Loss of Profits as a Relevant Damage within the Limitation of Liability Provisions.
Mod_03_12 Alignment of TSC with Revised VAT Arrangements 29 th May 2012.
Global Aggregation Working Group 15 th September 2010.
Global Aggregation Working Group 15 th September 2010.
Energy Networks Association Root cause solution for unregistered sites / MPRN creation David Mitchell 1 st November 2013.
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
Trading rules in Lithuania Giedrius Radvila Lietuvos energija AB 3 July 2006, Riga II MINI-FORA.
Wind Power in Ireland: Treatment of wind in the Single Electricity Market APEx Conference, Paris 16 th October 2007.
Market Integration Project. Background –Single Electricity Market Organisation –EU Internal Energy Market –Context for Market Design Market Integration.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 31 January 2012.
Unit Registration Process Improvement SEMO 05/12/2012.
SEM MODS COMMITTEE SLIDES Registration of Charges over Collateral Reserve Accounts – Proposed Code Modification.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Metering Modification to T&S code Cathal Kearney Protection & Metering 15/04/2015.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
Modification Proposal Mod_11_12 Gaelectric Energy Storage Presentation to Modifications Committee 29/05/2012.
Mod 10_11 Interconnector Under Test Mod 14_11 Pumped Storage Under Test Tuesday, 5 th April 2011.
UNC Modification 0213 – User Pays Governance Arrangements Simon Trivella – 19 th June 2008 Governance Workstream.
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda 12 th October 2010 Minutes from Previous IGG Meeting.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Training Session Managing Formal Queries by Katia Compagnoni.
Mod_02_13 Registration of Charges WG Update 03 April 2014.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda – July 19 th 2007 Minutes from last IGG meeting10.00.
Mod_02_13 Registration of Charges Legal Spending Update.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
Impact of Increasing Meter Errors on the SEM Modifications Committee Meeting 65 3 rd December 2015.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – March 8 th 2007 Minutes from last IGG meeting10.00 – Review of Action Items10.10.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – September 21 st 2006 Minutes from last IGG meeting10.00 – Review of Action.
T&SC Modification Proposal: Clarification of Outturn Availability
RMDSRMDS Retail Market Design Services 1 IGG Agenda – November 1s t 2006 Minutes from last IGG meeting10.00 – Networks AIM Project.
Juliet Corbett, NIAUR. Regulatory Structure  Ireland  CER  Licenses Generators Suppliers ESBCS ESBPG ESB Networks Eirgrid Transmission License Eirgrid.
ESB Networks Market Release Meeting of the IGG, May 28th 2009
Grid Code Development Forum – 6 September 2017
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
Harmonisation Working Group
Industry Governance Group 5th March 2009
IGG Agenda – August 10th 2006 Minutes from last IGG meeting – 10.15
Options for Treatment of Long Term No Access Sites
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 12th December 2017.
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Mod 14: Foreign Exchange Rate
Update to Unit Under Test Process
UNC 0621L: Amendments to Gas Transmission Charging Regime
MOD_10_18 Amendment to Capacity Settlement Statement Publication from Monthly to Daily 13th March 2018.
Ex Ante Quantities Deferral
Notification of Suspension to SEM NEMOs
Mod_25_18 Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Chris Warner UNC Modification Panel 21 December 2017
PrePayPower presentation to IGG
Interim Suspension Delay Periods
Joint Office Presentation for Modification 0678
Meter Data Publication Timing
Summary Issue Modification Aim Effect of the mod Impacts
Outage Adjusted Wind and Solar Forecast Reports
UNC 0621L: Amendments to Gas Transmission Charging Regime
Proposer: Debbie Brace Panel Date: 20th March 2014
Mod_21_18v2 Application of Settlement Reallocation Agreements to Market Operator Charges 16th August 2018.
MOD_03_19 Amended application of the Market Back Up Price if an Imbalance Price(s) fail to calculate Energia.
Part B Suspension When Suspended Under Part A
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Correction to No Load Cost - “and” vs “or”
Long Term Consumption Adjustments
MRSO Update Frank Leetch – MRSO IGG 18/05/06.
Presentation transcript:

Metering Modification to T&S code Cathal Kearney Protection & Metering 03/12/2015

Outline SEM Mod_4_15 raised at the April 2015 meeting 61 Meter Operator to liaise with Proposer in relation to cost / benefit analysis of implementation of proposal Presentation on issue to IWEA at Tripartite meeting in May ESBN / EirGrid and SEM-O investigated impact on Market and options to resolve issue Investigation and Options outlined to CER

Joint investigation ESBN MO and EirGrid MDP investigated impact in relation to loss of meter data to SEM Greater numbers of DSO connected Generation Units changing to Price effecting over the last 2 years Identified that communication and loss of power supply to DSO meters impact on MDP and SEM requirement for Settlement Developed options and costs to resolve meter power supply and communications issues

Solutions identified DSO customers to provide robust communication channels, this option does not tackle loss of power supply to energy meters but would reduce communication problems only. Requirement is covered by DSO connection agreement. Option – Installation of meter data logger with back up power supply and communication support – Minimum standard to allow MDP to poll meter data, approx. cost €4000 per metering point and on-going ESBN O&M charges would need to be reviewed – Retro fit option for existing DSO connected customers only (does not include telecom lines). Option – Installation of DSO energy meter & communications to current TSO equivalent standard (energy meters with back up power supply and robust communication channels). Approx. additional cost of €15,000 per metering point and on-going ESBN O&M charges would need to be reviewed. This would be an option for existing connections and would become the standard for new DSO connections

Summary CER noted issue has arisen and to write to EirGrid and ESBN in relation to working together to resolve the issue ESBN and EirGrid to develop coordinated approach to communicating with affected parties in the coming weeks, this would mean that  Current DSO connections wishing to change to Price Effecting metering requirements will need to meet TSO equivalent standards as part of registration (See previous options)  Where existing DSO Price effecting units are causing issues metering requirements will need to be fulfilled (See previous options) Provision 3.77 in the T&SC for MDP to inform the Market Operator if a unit does not fulfil its metering requirements for the classification requested. Roles and responsibilities in relation to MDP and MO roles to be explored in the Metering Group forum for I-SEM Proposer requests that SEM Mod_4_15 MODIFICATION TO RELEVANT METER OPERATOR ROLE AND SUPPORT REQUIREMENTS FOR METER COMMUNICATION CHANNELS - is deferred until this process is finalised