Dec/1/2015WG3 in TTC Meeting Test Result of STF-2 Cryomodule Kirk Jun/2013Jul/2015 Preliminary.

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Advertisements

6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Dark Current Measurements and Simulations Chris Adolphsen 2/4/15.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
Dec/3/2015WG2 in TTC Meeting Field emission / Radiation in V.T. Kirk.
2014/3/25TTC Meeting Beam Operation Experience at Quantum Beam Project in STF Kirk.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
Vacuum experiences on XFEL Beam Position Quadrupole Units (BQU) preparation Marco Schalwat TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
Evolution of Field Emission Characteristics Selected C100 Cryomodules Michael Drury.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Recent Result for the STF-2 Cryomodule Operation
Areal RF Station A. Vardanyan
R&D for Fundamental Power Coupler in SRF Mass-Production
Cornell Updates Commissioning of T-map for ILC single cell starts.
S1G Experiment Schedule Plan
ILC10 Beijing Global Design Effort
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
Degradation and Recovery of Cavity Performance
at STFC Daresbury laboratory
FNAL recent coupler troubles
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Performance of Slide-jack tuner in STF-2 Cryomodule
Recent VT Results in the STF-2 cavities
BriXS – MariX WG 8,9 LASA December 13, 2017.
SNS Fundamental Power Coupler History
KEK injector cryomodule
Performance Degradation cERL Injector Cryomodule
IHEP Cryomodule Status
Construction and First Coo-down Test of cERL Injector Cryomodule
TTC meeting, Milano Global Design Effort
Cavity Degradation Experience at S1-Global
Presentation transcript:

Dec/1/2015WG3 in TTC Meeting Test Result of STF-2 Cryomodule Kirk Jun/2013Jul/2015 Preliminary

superconducting rf test facility Brief history of STF-2 project Dec/1/2015WG3 in TTC Meeting 2 DateContent 2011 ~ 2013V.T. for 12 cavities Jun/2013Cleaning up STF tunnel Jul/2013 ~ Apr/2014Cavity string assembly (three times) Oct/2013 ~ Jan/2014Module assembly (CM1/CM2a) Jul/2014Final inspection for High pressure Gas Code Oct/2014 ~ Dec/20141 st cool-down / low power test Apr/2015 ~ Jul/2015Klystron / waveguide preparation Jul/2015 ~ Sep/2015Coupler conditioning at room temperature Oct/2015 ~ Dec/20152 nd cool-down / high power test High power test is still on-going, then every result is preliminary!

superconducting rf test facility Brief history of STF-2 project Dec/1/2015WG3 in TTC Meeting 3

superconducting rf test facility Experimental devices for CM1/2a in STF-2 Dec/1/2015WG3 in TTC Meeting 4 Radiation monitor Vacuum I/L module Vacuum gauge controller Arc I/L module Peak-hold module for electron Tuner remote controller Pulsed power meter Piezo high voltage DATA logger Oscilloscope Tuner controller

CM1CM2a MHI-18MHI-19 MHI-20 MHI-21 MHI-22 MHI-24 MHI-15MHI-14 STF-2 Cryomodule (CM1/CM2a) MHI-17 MHI-23 MHI-25MHI-26 BPM/Quadrupole Cavity string 1 (cavity #1-#4) Cavity string 2 (Cavity #5-#8) Cavity string 3 (Cavity #9-#12) Dec/1/2015WG3 in TTC Meeting 5 Vacuum tank is common between CM1 and CM2a. We had to do the string assembly three times, because of the clean room capacity.

Capture CM CM1 CM2a MHI-12 MHI-13 MHI-18 MHI-19 MHI-20 MHI-21 MHI-22 MHI-24 MHI-15 MHI-14 STF-2 Accelerator Layout MHI-17 MHI-23 MHI-25 MHI-26 To be constructed in 2016 Cold box RF Gun Chicane Dec/1/2015WG3 in TTC Meeting 6

superconducting rf test facility Cavity performance in CM test Dec/1/2015WG3 in TTC Meeting 7 Module test is still on-going, then this result is preliminary! First and third cavity string achieved “No degradation” in CM test. At this time, Q 0 measurement is not done yet (next year). Second had significant trouble (heavy field emission) due to additional clean room work (probably). ILC TDR parameters (TDR Vol.3, Part II, p.24) Q L : 5.4 x 10 6 Filling time : 924μsec Flat-top : 727μsec Total width : 1650μsec STF-2 parameters Q L : 5.0 x 10 6 Filling time : 900μsec Flat-top : 800μsec Total width : 1700μsec String 1 String 2String 3

superconducting rf test facility Radiation level in CM test Dec/1/2015WG3 in TTC Meeting 8 Module test is still on-going, then this result is preliminary! Short pulse ( μsec)Full pulse ( μsec) MAR-781/-782 Radiation level is measured below the cavity, upstream and downstream. Field emission is observed for every cavity. Especially, cavity #5, #6, #7 and #9 had heavy F.E. We will continue RF conditioning for cavity #6 after return to KEK.

Why performance degradation occurred? Dec/1/2015WG3 in TTC Meeting 9 We used the local/temporary clean booth to connect each cavity string, because of the clean room capacity. But, we have done some irregular works for this connection. They might be causes for degradation. We missed the direction of the pumping port, then some parts conflicted each other.

Complete result will be released in IPAC16! Dec/1/2015WG3 in TTC Meeting 9 Thank you very much for your attention