GLM 22/10/2002 E.Sánchez-Corral, L. Symons / ST D. Mathieson /AS 1 AOC Project Progress Report Organization Scope, Strategy, Objectives Status: – specification,

Slides:



Advertisements
Similar presentations
Making the System Operational
Advertisements

CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
CERN Safety Alarm Monitoring (CSAM) CERN Safety Alarm System Supervisory Board 6st meeting Luigi Scibile & CSAM project team.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
ST EDH - Workflow J. Purvis / EDH. Software problem?
Development plan and quality plan for your Project
2013: Technical specification, analysis and selection 2014: Lengthy contract negotiations: Financially viable Satisfactory requirements, meeting CERN.
Introduction to Information System Development.
Project Management Process Overview
Scorpio Connect Professional Services Business Strategy.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
LHC machine Schedule, coordination & WAT K. Foraz March 22 nd, 2011 IMWG - LHC machine1.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
CERN IT Department CH-1211 Genève 23 Switzerland t Service Management GLM 15 November 2010 Mats Moller IT-DI-SM.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Barriere O, Le Roux P
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
University of Wisconsin System HRS Project Update to ITC November 19, 2010.
ECTL A Support to the Automated Safety Data Monitoring Indicator project.
CERN Draft 0.3 – after meeting July 29th, 2011IMWG - Workflow sub working group - draft after meeting.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
STTC Meeting 12/04/99 Eva Sánchez-Corral 1 ST Year 2000 Preparation Progress report Project Definition Report INB and the Y2K syndrome Actions. Conclusions.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
HySafe Coordination Committee Meeting, October 18, 2005, Karlsruhe Status of WP5- The Hydrogen Incident and Accident Database Update October 2005 Christian.
Software Life Cycle The software life cycle is the sequence of activities that occur during software development and maintenance.
HR for XML WebService -- Week 2 System Design Phase Smartest Fish.
Natural Disaster Management Project Pakorn Apaphant Project and Application Subgroup WGISS 24 DLR, Oberpfaffenhofen, German October 15-19, 2007.
15-Dec-04D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Update (Report from the Joint Security Policy Group) CERN 15 December 2004 David Kelsey CCLRC/RAL,
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
Page 1 JUSTIFY define and validate REQUIRE- MENTS define initial management DOCUMENTS define INFRA- STRUCTURE allocated maintenance changes management.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
GLM 07/05/2002 A. Kosmicki, E.Sánchez-Corral, F. Skaar 1 ST Web Re-engineering Progress Report Organization Strategy. Objectives Status: design, development.
Chapter 9 & 10 Database Planning, Design and Administration Database Application Lifecycle DBMS Selection Database Administration.
Safety Commission databases support TS/CSE 1 EDMS TS Workshop 2005 SAFETY COMMISSION DATABASE SUPPORT Presented at the TS Workshop 24 th May 2005 S. Petit,
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
State of Georgia Release Management Training
Professional Services Business Strategy
CERN – European Laboratory for Particle Physics Administrative Information Services DPO Meeting 14 December 2000 EDH Derek Mathieson (Ivica Dobrovicova)
Project Management Processes for a Project
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
Team-Based Development ISYS321 Managing the Information Systems Project.
EDMS for EGEE-IIEDMS No: ver 1 David Widegren, CERN, TS/CSE Using the CERN EDMS in the EGEE-II project.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Radiation Protection computing tools Gérald Dumont HSE/RP.
LCG User, Site & VO Registration in EGEE/LCG Bob Cowles OSG Technical Meeting Dec 15-17, 2004 UCSD.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
PIE migration: new interface with the same functionalities PIE migration: new interface with the same functionalities Derek Mathieson Jozef Dransfield.
Bob Jones EGEE Technical Director
Mirjana Boshnjak Skopje, 20 to 22 September 2017
Some arrangements for personnel safety 1- Procedures for access
EP Experiments safety validation process Safety Permits
PROJECT SCOPE MANAGEMENT
Engineering Processes
PIE migration: new interface with the same functionalities
Nonconformance Tracking
Instrument PDR Summary of Objectives
PROJECT SCOPE MANAGEMENT
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Safety in the East Area Renovation Project
Work and Service Supervisor
Presentation transcript:

GLM 22/10/2002 E.Sánchez-Corral, L. Symons / ST D. Mathieson /AS 1 AOC Project Progress Report Organization Scope, Strategy, Objectives Status: – specification, development – open issues Planning Action Plans

GLM 22/10/2002 E.Sánchez-Corral, L. Symons /ST D. Mathieson /AS 2 Organization ST AOC project team –“AOC Informatique” Working group L. Symons, E. Sanchez-Corral J. Dransfield: Technical student integrated in EDH team –AS/EDH: D. Mathieson

GLM 22/10/2002 E.Sánchez-Corral, L. Symons /ST D. Mathieson /AS 3 Scope, Strategy Scope of the AOC system –AOC system shall allow users to register, modify, manage and follow-up the “Avis d’Ouverture de Chantier”/IS-39 documents Administration tools for LHC Installation Strategy –AOC document integrated into EDH –Validity and consistency of data Retrieved from concerned CERN dbs via Foundation: Patrimony, CFU, EDH/DAI, HR, etc –Assure confidentiality and security issues –Assure consistency and transparency Safety data

GLM 22/10/2002 E.Sánchez-Corral, L. Symons /ST D. Mathieson /AS 4 Objectives AOC system used CERN-wide AOC system will be not only an AOC repository but an AOC Management tool Complete system which covers both Safety and Management aspects of works on the CERN sites –Detect/trace/solve works co-activities –Contracts’ Safety information provided and used to validate AOC data Follow-up works: where, when, by whom Homogeneity with related EDH documents Level-3 Alarms IS-37, Fire Permit Create a common environment in EDH / AOC Phase II (from 2/03) Interface to Works Planning AOC work tasks Planning / AOC Phase II (from 2/03)

GLM 22/10/2002 E.Sánchez-Corral, L. Symons /ST D. Mathieson /AS 5 Progress Status User Requirements collection: May-June/02 “AOC Informatique” Working Group –PS, SL, ST, TIS, LHC, EP ST AOC prototype start point Specification: July-October/02 Interface to Patrimony db –Agreed with J. Garcin: 10/9 Interface to CFU db –Agreed with CFU (L. Esteveny): 16/10 AOC User Requirements document –Reviewed with AS/EDH –Specific requirements being individually “formulated”. Planned: 25/10 –To be accepted by AS/EDH AOC User Interface specification –Updated according to CFU interface. A first prototype exist –To be accepted by AS/EDH

GLM 22/10/2002 E.Sánchez-Corral, L. Symons /ST D. Mathieson /AS 6 Progress Status (2) Design & Development Patrimony db requirements implemented by ST –10/9 Patrimony db requirements implemented in EDH by AS –Via Foundation –Location to be defined, idem as for “Transport Request” –Production planned: 12/02 CFU db requirements implemented by AS/CIS –First prototype: 8/10/02. Reviewed 16/10 –Production planned: 11/02 –

GLM 22/10/2002 E.Sánchez-Corral, L. Symons /ST D. Mathieson /AS 7 Progress Status (3) Design & Development AOC User Interface –First prototype: AOC document “READ only” view –First prototype: 21/10/02 AOC Co-activity Management Interface –First prototype: 30/September

GLM 22/10/2002 E.Sánchez-Corral, L. Symons /ST D. Mathieson /AS 8 Progress Status (4) Open issues –CFU/Contracts’ Safety data and Documents on Completion Input/update under responsibility of Contract Managers ? –Location of Contract Safety documents and Documents on Completion Located in EDMS by Contract Managers ? Link from CFU to the EDMS repository (/division) ? -AOC Confidential Data access restricted -Asbestos and Chemical risks -DPO shall manage “AOC create right” -Grants READ access to all AOCs data -Chemical risk to be included in Patrimony db

GLM 22/10/2002 E.Sánchez-Corral, L. Symons /ST D. Mathieson /AS 9 Planning Development: Oct-Dec 2002 Populating CFU with Safety data: Nov-Dec 2002 Populating AOC sys: Dec-2002/Jan-2003 Testing: Jan-2003 Production: 15-February 2003 Training: February-March 2003

GLM 22/10/2002 E.Sánchez-Corral, L. Symons /ST D. Mathieson /AS 10 Actions Plan (ST) Input CFU/Contracts’ Safety data and Documents on Completion By Contract Managers Locate in EDMS Contract Safety documents and Documents on Completion By Contract Managers -Give “AOC create right” -Identify persons who should have this right -Works Supervisors (& deputies), DL, GLs, SLs, DSOs, … -DPO (?) shall assign “AOC create right” to concerned persons -Include “Chemical risks” in Patrimony db -Follow Standards simplified -Associated to “Buildings” -Follow-up AOC system development -Inform of project progress to “AOC Informatique” working group