FNAL All Experimenters Meeting January 7, 2002 1 Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.

Slides:



Advertisements
Similar presentations
CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
Advertisements

DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting
Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 DØ Summary - Week of 2002 September 30 – October 6 Luminosity & operating.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
Time Meeting 2/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
10 Dec 02 CFT+PS Week in Review CFT_Gui broadcasts limited Calibration/DataBase issues Grounding changed on 6 AFEs Two AFEs replaced –SIFT gain variation.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
7 Jan 03 CFT+PS Weeks in Review Sequencer status –1553 communications issues may not be fully resolved –scanning still off Calibration –calibration database.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
Status of NA62 straw electronics Webs Covers Services Readout.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
PM Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
All Experimenters MeetingDmitri Denisov Week of December 23 to December 30 D0 Summary  Delivered luminosity and data taking efficiency u Delivered: 5.8pb.
Collaboration Mtg April 14, 2000 DO Timeline J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
1 Run IIb Event Builder upgrade Director’s Review Jan Steve TetherRon RechenmacherMarkus KluteBruce Knuteson MITFNAL/CDMITMIT RonSteve Motivation.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
DAQ ELECTRONICS 18 March 2015MEG Collaboration Meeting, Tokyo Stefan Ritt.
L1Calo News Activity Summary, Run coordination and Operation Planning Bruce M. Barnett Rutherford Appleton Laboratory.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
TAB-To-L3(Tape) ● At the L1Cal2b sidewalk test stand we have a setup to transmit the data coming from detector to tape using the new system. ● We installed.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
CMS DAQ project at Fermilab
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Hall A Compton Electron detector overview
University of California Los Angeles
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Presentation transcript:

FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably smooth operations during the last few weeks  Not many changes in functionality due to the holidays – concentrated on data taking Integrated Luminosity LiveLive fractionRate to tape 17 Dec – 23 Dec 1.03 pb-1365 nb-135.3%6.9 Hz 24-Dec – 30 Dec 1.02 pb-1407 nb-139.8%5.7 Hz 31-Dec – 7-Jan 1.36 pb-1669 nb-149.3%6.2 Hz Total3.41 pb pb-142.2%

FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 2 SMT Status  SMT  3 power supplies off, ~1/3 off on another supply  ~ 50% of channels under power  Operational fix attempted caused ‘latch-up’ conditions of op-amps – too much current draw (backpowering of 5V and 15V due to op-amp and comparator circuits)  Noise input on Vcal not fixed by Schottky diode on sequencer boards  Hampered by limited ability to test for causes and solutions outside of the real detector environment  Access later this week to address all these problems

FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 3  Calorimeter  Running very smoothly  Problem with 2 supplies in platform – replaced  One supply in counting house (12/25) – repaired  Muon  Running very smoothly  One supply fixed during access  CFT  118 Class A AFE boards through Phase 5 testing  101 AFE boards installed on platform  Improved understanding of temperature and bias control issues  Reduced latch-up conditions to ~ 1%/day  Improved air cooling on platform during accesses  Upgrades to AFE power supplies controls tested and ready for installation  MCM recovery in progress (need 160, have 29+18)  Board repair in progress  Reconstructed tracks in the axial view

FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 4 DAQ System  L3 DAQ  Final production VBDi installed – testing  Waiting on SIBs for final VRCs  Still seeing frequent resets and event loss due to parity errors  VBDi’s being tested in test stand at board house with full readout DAQ  Firmware downloadable locally – speeds up testing and integration  Short term goal (2 weeks) – have 3 VRCs running smoothly at Dzero  February time scale for SIB + 4 more VBDi’s  L2 Trigger  Been testing in global runs for last few weeks

FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 5 Access Plans for 01/09-01/10  Wednesday 01/09  04:00 Dump beam  04:30 Supervised Access  04:30-10:00 Open EF South and CF  Thursday 01/10  12:00-18:00 Close CF and EF South  18:00-22:00 Survey fully closed detector  CF bottom B-layer PDT recheck  EF N/S elevation  22:00 Search and Secure

FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 6 Cathedral Work during Access  SMT  Suspect 3 bad power supplies  NW1 - bad VCC1 (swap)  SW1 - bad VCC3 (repair)  SW0 - bad VCC3 (swap)  NE1 - bad 15V (probably fuse)  Replace all 15V fuses (5A  7.5A) – test and adjust trip levels (6A)  Individual resistive fuses on some Interface Boards (3)  Calorimeter  Replace a secondary power supply for preamplifiers  Fix a few bad channels  Fix a few bad temperature probes  Muon  Fix readout for two PDT layers

FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 7 Other Work during Access  CFT  Install modified boards for one crate to address latch-up problems – modified resistors, capacitors and firmware  Install new firmware for the AFE power supply controllers - improve reliability and allow independent control of power supplies to each half of AFE crates  Investigate link timing out of the AFE boards and into the mixers