L2mu System - Status SLICs Track Finding (main data processing) Next: SLIC Upstream and Downstream DONE UPSTREAM; CICs and SFOs CIC crate; hooked into.

Slides:



Advertisements
Similar presentations
Mayukh Das 1Louisiana Tech University For the 2004 D0SAR Workshop Activities with L3 and the Higgs By : Mayukh Das.
Advertisements

Michigan State University 4/15/ Simulation for Level 2 James T. Linnemann Michigan State University NIU Triggering Workshop October 17, 1997.
Freiburg Seminar, Sept Sascha Caron Finding the Higgs or something else ideas to improve the discovery ideas to improve the discovery potential at.
Bob Hirosky, UVa 7/27/01  Level 2 Processor Status  Bob Hirosky The University of Virginia 
1/1/ / faculty of Electrical Engineering eindhoven university of technology Architectures of Digital Information Systems Part 1: Interrupts and DMA dr.ir.
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
J. Linnemann, MSU 6/21/ Agenda L2 monitoring and readout Jim Linnemann 20 min Magic Bus Transceiver Dan Edmunds 20 min Plans for the GL2 Card Drew.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
1 L2 Triggering James T. Linnemann Michigan State University January 23, 2002.
Michigan State University 7/12/ The Standard L2 Crate James T. Linnemann Michigan State University FNAL L2 Workshop December 19, 1997.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
L3 Muon Trigger at D0 Status Report Thomas Hebbeker for Martin Wegner, RWTH Aachen, April 2002 The D0 muon system Functionality of the L3 muon trigger.
Alexander Khanov 25 April 2003 DIS’03, St.Petersburg 1 Recent B Physics results from DØ The B Physics program in D Ø Run II Current analyses – First results.
Jeff LandgrafSTAR Trigger Workshop: Oct 21, 2002 Trigger Accounting for 2002.
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: “DOM MB to Event Builder”
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
L3 DAQ the past, the present, and your future Doug Chapin for the L3DAQ group DAQ Shifters Meeting 26 Mar 2002.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
Svtsim status Bill Ashmanskas, CDF simulation meeting, Main authors: Ashmanskas, Belforte, Cerri, Nakaya, Punzi Design goals/features: –main.
22 June 2000 D  NIU Workshop S. Doulas From Detector to Ntuples: Muons Steven Doulas Northeastern University Boston, MA D0 Muon Upgrade Group.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
W/Z Plan For Winter Conferences Tom Diehl Saclay 12/2001.
CMS Week Sept '07Leonard Apanasevich (UIC) Pedrame Bargassa (Rice) 1 Physics Priorities for Trigger Development Leonard Apanasevich (UIC) Pedrame Bargessa.
9/12/99R. Moore1 Level 2 Trigger Software Interface R. Moore, Michigan State University.
L2 Status and Plan Matt Worcester, Heather Ray, Monica Tecchio, Myron Campbell, Jane Nachtman, David Saltzberg, Tom Wright, Steve Kuhlmann, Karen Byrum,
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Status of the ATLAS first-level Central Trigger and the Muon Barrel Trigger and First Results from Cosmic-Ray Data David Berge (CERN-PH) for the ATLAS.
J. Linnemann, MSU 2/12/ L2 Status James T. Linnemann MSU PMG September 20, 2001.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
L2toTS Status and Phase-1 Plan and Pulsar S-LINK Data Format Cheng-Ju Lin Fermilab L2 Trigger Upgrade Meeting 03/12/2004.
Julia Thom, FNALEPS 2003 Aachen Rare Charm and B decays at CDF Julia Thom FNAL EPS 7/18/2003 Tevatron/CDF Experiment Decay Rate Ratios and CP Asymmetries.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
Thursday, March 13th Z   had Z  had Preselection Efficiencies (muon) Backgrounds + Cuts Trigger Back to the Tau..and what remains to.
ATLAS ATLAS muon CSC clustering David Adams Brookhaven National Laboratory June 15, 2006 Muon Software Updated 11:00 EDT June 15, 2006.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
XML scheme for configuration data V.Černý on behalf of the Bratislava group Initiated by Marco’s call:...a software layer for implementing the handling.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
ATLAS UK physics meeting, 10/01/08 1 Triggers for B physics Julie Kirk RAL Overview of B trigger strategy Algorithms – current status and plans Menus Efficiencies.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
CLAS12 DAQ & Trigger Status
More technical description:
LHC experiments Requirements and Concepts ALICE
The Silicon Track Trigger (STT) at DØ
James T. Linnemann Michigan State University January 23, 2002
M.Biglietti (Univ. Naples and INFN Naples)
Plans for the 2004 CSC Beam Test
Presentation transcript:

L2mu System - Status SLICs Track Finding (main data processing) Next: SLIC Upstream and Downstream DONE UPSTREAM; CICs and SFOs CIC crate; hooked into place by June 8 Boards return from stuffing ~end of May Bench tests (MIS-Eng.) done by June 8 Ship to fnal, then full cabling at MCH3 UPSTREAM fully hooked up by mid-to-late June Worst case scenario: no downstream yet – we can; Check all cabling / connections: run BIST tests over all sources, cross check data origin (headers) Exercise SLIC-run-init (SCL-init if SCL available) Receive/Dump a few events – Formats,Endianess,etc. First look at DSP-times, Event Sizes, at very limited speeds (by re-routing SLIC output to VME -- dump) DOWNSTREAM; MBTs and Alphas next;

Downstream - Alphas Two major problems remaining (1) DMA – data input Last week at UMich, problem solved (R.S. DØ + S.M. CDF) – standing ovation (2) PIO – board to board Mbus Communications Current understanding: an fpga programming problem, (rather than a Bus problem) – Joint effort DØ + CDF Highest priority: estimated ~2 weeks, will know soon -- Big decision next week; whether to order remaining boards prior to seeing PIO solution (?)... Circumventing PIO – OK for low rate Test Mode have single alpha performing worker + administrator takes little extra software, plus a few kluges in system Note: Current design of “Beta” approved Project (Virginia+Orsay+ Maryland) goes ahead Current boards acquire 8 “white wire” mods Upgrade incorporated into future production “future production” does not delay muons Current boards destined to Cal+Muo+Global X

Downstream - MBTs Last steps remaining (priority ordered) (1) Enable the SCL functions (2) Multichannel Broadcasts FW-SCL (L1+L2) into MBT-daughter board L1 decision formatted, buffered, broadcast (all SLICs) L2 decision stored in buffer accessible by MBus – raises a pin in backplane to trigger PIO-read by Alpha Other Functions; request SCL-init raise L1-busy ( L2 input buffers full, stop L1 ) raise L2 busy (L2 output buffers full, stop L2 ) Status: firmware mostly completed, fnal, testing as we speak... HotLinks-to-MagicBus-to-Alphas ; Firmware done, needs testing (was held by DMA -- ~1week job) GOAL: Mu+Cal Online in August (2) Multichannel Broadcasts (3) Additional MBT firmware steps Cypress output from preprocessor to Global (MBus PIO to MBT) L2Global answer to L2 HWFW (hardware exists, being debugged)

L2mu System - Status (cont.) Cables all cables in place, except; CIC (14)  SLIC (16) Simulator All SLIC algorithms in place (4 stub finders, 2 L1 reporters) All Alpha algorithms in place (Central & Forward track builders) Framework done/tested, Input-to-Ntup Now adding the Lookup Tables (versions) Expect to run from CVS next week Exercise + Tune + Test Robustness of all algorithms with simulator – Online links from the same files, reads same tables, etc. SLIC: current development work is online monitoring and error handling Note: SLIC+Alpha processors do the track finding. Trigger decisions are only made by L2-Global. Development of Global needs a functioning Alpha.

I – Remarks on Run-II L2mu Dimuons First time we trigger on A-stubs; Fundamentally different from higher thresholds Likely one of the strengths of L2 ( inherits CFT coincidence at L1, adds Aφ granularity + PDT track residuals. Dimuons with A-stubs  a much faster collection of J/ψ ‘s than in Run-I (Eff’s, p-Calib, p-Resoln) Early run: optimize bandwidth to collect J/ψ ‘s Example: L1(μ+μ–) + L2(M&P) + L3(μ μ Mass) in // with special runs on other subdetectors (expected J/ψ visibility of 0.1Hz at 1.E31/cm 2 /s) Another (and faster) control sample: Muon-in-jet is a bona-fide guarantee of μ-quality Use higher threshold single tracks to study A-stubs Example: L1(μ+jet) + L2(M&P) + L3(μ-in-jet) (cross section large enough for a special run) (*100 – thres&η)

II – “Prove that L2mu is working” i.e. we get every muon (efficiency) we reject junk (rates, purity) Job: Monitor the efficiency as nearly online as possible L2 single track Efficiency =#L2 pass (for an ID-controlled sample) #L1 pass it is an approximate efficiency (ID bias) value depends on LMT of either trigger From Run-I; an effective ID control is loose muon (to minimize bias) inside jet (to certify beam origin) -- but jet introduces (L1) CFT bias... Opp. φ-hemisphere to leading jet obs: more accurate ID with less bias (eye scan, dimuon resonances etc.) come only much later A. Maciel (NIU) Muon L-2 Two examples online offline

II-1. L2mu Eff. Monitoring Online Possible with a L2-monitor trigger L1*L2*L3 L1; mu+jet, lowest jet threshold, 3 layer muons (4 GeV thresh.) prescale as needed (or raise jet) muon configurable as L, M, T L2; mark and pass (1mu w/ L1) L3; apply ID-control filter  loose muon (L1 tagged) inside jet - performance histos can go to Examine - prescaled full readout of L2 data to tape - difficult to monitor lowest Pt threshold A. Maciel (NIU) Muon L-2

II-2. L2mu Eff. Monitoring Offline Building a control sample: (1)Unbiased (virtual) trigger (2)ID-control selection Unbiased Virtual Trigger Bits, set upon reconstruction of ALL stream. MU_UNBIASED, CFT_UNBIASED, CAL_UNBIASED etc... Where MU_UNBIASED =.OR. of all triggers w/out Muons MU_UNBIASED.AND. CFT_UNBIASED is effectively an offline mark&pass sample for both L1mu and L2mu Apply ID-control filter to this sample and extract efficiencies from trigger bits Apply ID-control filter to L2µ passed events in this sample and examine purity (rejection) A. Maciel (NIU) Muon L-2