Request for Proposals Notification When to use?. When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or.

Slides:



Advertisements
Similar presentations
FAA Project - Bidding Phase FAA Recommends.. Consider how you would like to bid the project early on in the design. Due to possible budget constraints.
Advertisements

Division of Construction Procurement Director:Steven K. Waddle, P.E. Prequalification & Compliance: Brent Kropf Bidding & Proposals:Jimmy Johnson Estimating:Ryan.
RFP AND CONTRACT PHASE Jeff Wassenaar, P.E., HQ Project Development Benjamin Acimovic, P.E., Region 1.
Federal Aviation Administration Good Faith Efforts 2009 National DBE Conference FAA Office of Civil Rights “We are who we serve”
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Advanced DBE Tutorial June 10, DBE Program FAQ Why does BRMA have a DBE program? Federal law requires that airports that receive federal funding,
February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Footer Text PROFESSIONAL SERVICES CONTRACTING. Footer Text PROFESSIONAL SERVICES CONTRACTING.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Indiana Department of Transportation Professional Services Contracting System (PSCS) Letter of Interest Submittal (LoIS)
PRE-PROPOSAL CONFERENCE Bond Program Monitor Procurement (RFP 13-08) Moderator: Stephen J. Densmore, Special Counsel June 10,
At Your Service: How to Prepare Successful RFPs and RFQs Iowa League of Cities Annual Conference September 25, 2014 By: Patrick Callahan Callahan Municipal.
Single Point of Contact (SPOC) MTC Workshop PRESENTED BY: Sylvia Fung District 4 Local Assistance September 2014.
PROCEDURES FOR SELECTING THE CONTRACTOR
PROJECT AUTHORIZATIONS September 24, 2014 by Peter Anderson HQ Area Engineer – Districts 1 and 4 & Ephrem Meharena i- Team, Caltrans District 4 + VTA.
2015 CONAWAY CONFERENCE Consultant Inspection & Prequalification Lyle Flower Administrator Office of Consultant Services.
Louisiana Safe Routes to School Program Department of Transportation and Development Louisiana Safe Routes to School Program The Application.
CITY OF HALLANDALE BEACH PROCUREMENT PROCESS City Commission Workshop February 23, 2015.
Research Development Seminars Interagency Agreements, Pooled-Fund Studies, and Research in Other States.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Improving Understanding, Function and Procedural DBE Compliance ODOT OCR DBE Triage Training Office of Civil Rights DBE Program ODOT Training March 1,
Professional Services Contracting System PSCS Version 4.0 Prequalification Application Presented by Karen Macdonald Prequalification Engineer, INDOT April.
Closing Out a Federal Aid Construction Project Missouri Local Programs How to Close-Out a Federal Aid Construction Project.
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
Anna Bergmark Region 7 Local Program Local Program ARRA Training: ARRA Reporting Requirements.
DIVISION OF PROGRAM MANAGEMENT. PROGRAM MANAGEMENT UPDATES.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
State of Connecticut Consultant Selection Office 2015 Consultant Prequalification Process Presented by the Connecticut Department of Transportation (CT.
Consultant Selection Missouri Local Programs How to Evaluate Consultant Proposals, Complete the Rating Sheets & Make a Selection.
METROPOLITAN TRANSPORTATION COMMISSION Key Steps to Delivering Project 1.Lead agency submits final project scope, budget and schedule to MTC 2.MTC.
Preparing a Right of Way Request for Acquisition Authority Missouri Local Programs How to request right of way acquisition authority for obligation of.
Louisville District BUILDING STRONG Selection Success “How to Put Your Best Foot Forward” Chris Karem, P.E. January 2009.
Request For Qualifications (RFQ) Missouri Local Programs How to Complete the RFQ & Get it Advertised.
MINNESOTA DEPARTMENT OF TRANSPORTATION TARGETED GROUP/VETERAN OWNED BUSINESS DISADVANTAGE BUSINESS ENTERPRISE CONSULTANT CONTRACT REQUESTS Joyce Brown-Griffin.
Geraldine Gonzales-OGC Denise Peralta-CCRB Damian Segura-CCRB ACNM 02/15/16.
Millennium Challenge Account-Benin II Feasibility Study to Establish a Power Generation Company (GENCO) Pre-proposal Meeting March 30, 2016 Brief Procurement.
6/9/20161 Pre-Proposal Conference Engineering Supportive Services Program (ESSP) Request For Proposals NYSDOT Regions 8, 10 & 11.
Understanding Caltrans Request For Qualifications Process 1.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
PRE-PROPOSAL CONFERENCE Welcome! Conference Room A/B NYSDOT 50 Wolf Rd, Albany NY Monday July 15, :00 to 12:00 Noon NEW YORK STATE DEPARTMENT.
PRE-PROPOSAL CONFERENCE Welcome! American Air Power Museum 1230 New Highway, East Farmingdale, New York November 14, 2012 Management, Business Development.
Disadvantaged Business Enterprise (DBE) Each Submitter’s Responsibility for Outreach Efforts.
Presentation by ET Marchak Consulting November 30, :45 pm – 3:00 pm.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Transportation Enhancements/Alternatives Design Assistance Program
North Carolina Council on Developmental Disabilities
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
Instructions for New Revision & Deviation/Exception Forms
Disadvantaged Business Enterprise (DBE) Each Bidder’s (or Proposer’s) Responsibility for Outreach Efforts.
Construction Oversight
CM at Risk v. Design-Bid-Build
Historically Underutilized Business (HUB) Subcontracting Plan (HSP) Completion TxDOT HUB Program Revision: July 2016.
PRE-PROPOSAL MEETING, September 19, 2017 Contract No.:
Local Business Utilization Requirements
Engineering Major Projects: Raleigh Office Minor Projects: Division Office -This is a NCDOT policy, not a FHWA policy; it’s meant to avoid conflicts of.
How to Submit a Winning Bid
Consultant Selection Training
Tammy Custer Grant and Contract Officer
PRE-PROPOSAL MEETING, January 25, 2018 Contract No.:
Local Business Utilization Requirements, Chapter 14B
PROJECT DELIVERY METHODS
Procurement.
Driving Indiana’s Economic Growth
North Carolina Council on Developmental Disabilities
Use INDOT’s Website to Find Potential Consultant Opportunities
Diversity management system (DMS)
Presentation transcript:

Request for Proposals Notification When to use?

When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or R/W to be used as credit Not required if PE, R/W or CE 100% Local funded (even if FHWA funds in CN)

LPA NAME __________ RFP# _______________ Posting Date _________ Project Location ________________ Response Due Date and Time _____ Contact for Questions _____________ Submit To: ______________________ DBE goal _______%

RFP Submittal Requirements Letter of Interest (including attachments) One (1) signed Affirmative Action Certification (including attachments)

Letter of Interest (LoI) general instructions Must be received by due date Details on number of pages (maximum) No additional brochures, etc.

Letter of Interest (LoI) Content Consultant Identifications and qualifications Key Staff and Project approach

Letter of Interest Content Identification and Qualifications –Firm name and person authorized to negotiate –Sub consultants, DBE status, and percent of work –Personnel resumes and additional information

Letter of Interest Content Key Staff and Project Approach List Project Manager and key staff experience Describe staff capacity and ability Describe present workload Provide a description of your project approach

Requirements for Affirmative Action Certification A completed form for items that identify a DBE goal (identifies DBE firm and % participation) DBE certification Show good faith efforts if goal not met

Work Item Details LPA Name Project location District Project Phases included Project Description Estimated Construction Amount DBE Goal Term of Contract and Funding Required Prequalification Categories

Selection Procedures Selected for work items Selected based on LoI and other documents Selected based on Selection Rating Consultant is Pre-qualified (if not pre- qualified, additional steps will be required as related in the LPA Architectural and Engineering Firm Selection Procedures)