Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.

Slides:



Advertisements
Similar presentations
Service and Training. Our engineers and Instructors are all highly qualified and possess many years of experience with top manufacturers. Surveys Studies.
Advertisements

Contractor Safety Management
Insight Into Wind Turbine Installations Presented By: Murray Westerberg.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
LOCKOUT/TAGOUT.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
Quality Assurance/Quality Control Policy
Development and Quality Plans
CD NS Chief, Defense Nuclear Safety FIRE PROTECTON FUNCTIONAL AREA CDNS BIENNIAL REVIEWS May 15, 2012 Carl Sykes.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Protection Against Occupational Exposure
Evgeny A. Gorbunov, General Director, Union of Aviation Industrialists
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
BRC Food Safety Quality Management System Training Guide
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
Process Safety Management
The JINR engineering infrastructure is a multi component structure of the interacting elements. The following subsystems have the greatest effect on integrative.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Software Quality Assurance Activities
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Progress report on the test facility project design and construction P. Schnizer and L. Serio on behalf of bldg. 180 test facility project team members.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
10 th of April 2003 ATLAS “MSS Specification” Magnet Safety Systems – Magnet Common Project E. Sbrissa, G. Olesen – CERN/EP 5 Tests 5.1 Pre-production.
Closure of the Programming Period ESF TWG Luxemburg 2 nd December 2015.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
TE-CRG Activities D. Delikaris, TE-CRG.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Strategy for conformity of non-standard cryogenic equipment
Equipment simplified model SMR UR safety
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Safety in Construction and Upgrade Phases
HSE rules & regulations
(Procurement, testing of magnets)
Renovation of the 45-year old PS magnets
(Additional materials)
Flooding Walkdown Guidance
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Mauro Morandin & Antoine Daël
Developing and Issuing the RFP
Low temperature chiller Market Survey
ABB SACE Maintenance Preventive Maintenance Program
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Onsite Training at JLab
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Presentation transcript:

Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio

Outline Introduction Scope Schedule and test plan Staffing – Operation team – Technical support team – Expert support team Corrective maintenance Preventive maintenance and consolidations Preliminary estimates Conclusions B180 Project – L. Serio3

Introduction Testing Super-FRS magnets requires: operating the infrastructure of the test facility, handling the magnets, performing the tests and analyse the data Other non-continuous activities include the troubleshooting, maintenance and consolidation of the test infrastructure The magnets are pressure vessels operated at cryogenic temperature and include high voltage equipment. Appropriate procedures and qualified personnel are required such that the facility can be operated in accordance with CERN regulations L. Serio4B180 Project –

Scope Identify the activities, resources (number and skills) and cost to perform the tests of the Super-FRS magnets in building 180 at CERN guarantee the safe operability, reliability and availability of the test facility and required infrastructure Identify key competencies from the Organizations (CERN, GSI) to staff the activities according to the requirements, expertise and type of activities If no particular expertise is required the staffing could be from either Organization or subcontracted to industry (other). L. Serio5B180 Project –

Requirements Operation of the test facility requires an operation team executing the day-by-day work a support team on call for specific non-continuous tasks regular but non-continuous activities such as survey specific corrective maintenance not handled by the operation team troubleshooting a support team to perform preventive maintenance and consolidations to guarantee availability & reliability experts available on best-effort basis to diagnose and resolve blocking issues L. Serio6B180 Project –

Assumptions Operation and maintenance during normal working hours Continuous processes (cryogenic and cooling water) require on-call intervention during non-working hours Safe shutdown and, if possible, re-start (safety, cost and schedule) The test facility will be commissioned in summer Prototype and pre-series magnets testing at the beginning of 2017 Series magnets testing from the end of 2017 until 2021 L. Serio7B180 Project –

Schedule L. Serio8B180 Project –

Test program L. Serio9B180 Project –

Staffing: Operation team The regular operation shall be executed during normal working hours by a trained operation team (CERN, GSI, other) It consists at least of: Team leader: with the obligation of overseeing all operation and ensuring that all foreseen work packages can be executed Craftsmen, mechanics, electromechanical, welders Electrician / instrumentation specialist Process operators Cryogenic operators Electrical tests and sensor test: executing all high voltage tests, continuity tests, sensors and cabling Magnetic measurement operator and data analysis engineer Survey technicians L. Serio10B180 Project –

Staffing: Technical support team Not continuous activities assigned according to expertise/responsibility efficiency / cost CERN Transportation and crane operation Safety checks (documents check) and validation Data acquisition and controls specialist technical support Power converter, energy extraction and quench protection technical support Magnetic measurements technical support GSI Magnets follow-up and analysis validation Magnets (test) acceptance L. Serio11B180 Project –

Staffing: Technical support on-call On-call personnel is required to provide prompt support to guarantee the safe and reliable operation or re-start to avoid long recovery times and potential financial losses: Cryogenics operator and maintenance technicians Cooling water system maintenance technicians Electrical power distribution The above could be provided by CERN maintenance and operation on-call services (staff and contractors) Nota: CERN is launching a call for tender for the operation and maintenance of its cryogenic installations by an industrial partner. Operation (cryogenics operation team) and maintenance of the cryogenic system could also be performed by the same contractor. L. Serio12B180 Project –

Staffing: Expert support team Expert support familiar with all design and construction details to analyse and propose consolidation to re-establish performances Expert support on best-effort basis from CERN can be provided for all systems (based on the WP responsibilities) Expert support on best-effort basis from GSI competence domain shall be located on site at CERN: Measurement system support Magnet analysis Magnet supervision and responsibility L. Serio13B180 Project –

Corrective maintenance If a measurement system or infrastructure component flags an error which the operation team does not know how to handle, it will call one of the persons of the corrective maintenance team The on-call services are required for cryogenics, cooling water and the electrical system which require immediate intervention to avoid long delays and potential financial losses For other systems the personnel working on normal working hours from the operation and technical support teams shall provide corrective maintenance L. Serio14B180 Project –

Preventive maintenance CERN will guarantee the reliability and availability of the infrastructure and test facility performing regular preventive maintenance or consolidations (if required) during shutdown periods. The following systems will be serviced during the annual shutdown: Cryogenic system Instrumentation, controls and DAQ Electrical distribution and cooling and ventilation Power converters Energy extraction The following systems require a more frequent recalibration. This will be triggered or performed by the operation team: Power converters direct current transformers (DCCT) Magnetic measurement equipment L. Serio15B180 Project –

Required resources and budget L. Serio16B180 Project –

Conclusions In summary and covering a period of 4 years of operation the required financial and human resources are: – 3.5 MCHF operation costs – 38.2 m-y (not counting the expert support on best-effort basis) A possible scenario for staffing sharing, based on available (existing) and required (future) competencies as well as the most efficient, reliable and safe operation set-up, is: – CERN: 7.4 m-y – GSI: 12 m-y – Other support (best from GSI): 18.8 m-y – Other industrial contract: 3.5 MCHF equivalent These doesn’t include consumables, fluids and electricity (all proposed to be charged at consumption costs) as well as expert support (CERN and GSI) It is recommended that the future operation crew participates to this phase in order to receive adequate training while supporting the commissioning activity L. Serio17B180 Project –