The European Organisation for the Safety of Air Navigation AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions Paul Bosman Manager SWIM/EA Unit,

Slides:



Advertisements
Similar presentations
Global ATM Operational Concept
Advertisements

A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
AIS-AIM SG - #4 Agenda item 4.1 Integration with other services - SWIM
28 May 2013 AIM Global context ADQ Workshop
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
System Wide Information Management
Information Management Panel Update
Information Management The ICAO Perspective
The European Organisation for the Safety of Air Navigation Digital NOTAM Concept AIXM XML Developers’ Seminar #5 23 March 2010.
IATA views on Information management JF Grout Assistant Director ICAO relations.
Delivering Digital Services Global SWIM Demos ICAO AIS-AIMSG/11, Montreal – 1 May 2015 Presented By: Paul BOSMAN Head of SWIM/EA Unit.
ICAO IMP Paul Bosman AIS-AIM/SG11 - AOB. ICAO Information Panel  Air Navigation Conference 2012 conclusion  Participants  Australia, Brazil, Canada,
Delivering Digital Services WP6 – SESAR SWIM State of Play ICAO IMP-# January 2015 Presented By: Paul BOSMAN Head SWIM/Architecture.
Concept of Operations Governance - Registry
COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA.
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL.
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
The European Organisation for the Safety of Air Navigation ARINC 424A specification and SESAR WP9.31 AIXM Procedure Modelling/Encoding seminar Brussels.
State Aviation Administration The State Aviation Administration of the Ministry of Transport and Communications of Ukraine ICAO EUR Regional Preparatory.
Required Total System Performance (RTSP) Bernard Miaillier EUROCONTROL Agenda Item 3 EUROCONTROL.
Air Operations Division AIM System for ASECNA organisation (17 African countries) Description:  Full AIM solution composed of AIXM / eAIP / Charting /
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
1 The model of integrated use of information for provision of aircraft flights Completed by: Kolosok A. Supervisor: Luppo O.E. Модель інтегративного використання.
Roadmap Phase 2 EAD & AICM By: Eduard Porosnicu, AIM Expert 7-8 October 2009 ACAC – AIM Workshop.
Victor Kourenkov ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 LEGISLATION AND ORGANISATION CONSIDERATIONS.
The global voice of ATM The Global Voice of ATM CANSO AIM WG Activities Agenda Item - 5: Global strategy/roadmap ICAO AIS-AIM SG3, Montreal, November.
Ensuring the Safety of Future Developments
Global and Regional Planning for AIM Transition
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
AIS-AIMSG/12 Briefing to ANC AIS-AIMSG/12 Briefing to ANC 23 October 2015.
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Department Speaker’s name 08/03/2016 NOUVELLE LÉGISLATION EUROPÉENNE POUR ÉCONOMISER L’ÉNERGIE Améliorer les bâtiments High Level Safety Conference 2010.
COG/TNG contribution to LPR Implementation Language Proficiency: a safety issue St. Petersburg May 24th 2011.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision TECHNICAL & OPERATIONAL COMPETENCE ATS.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 6 : Towards the Implementation of Quality.
AIS-AIMSG/12 Briefing to ANC 23 October 2015
CANSO AIM WG Activities
FIXM briefing for the AIXM CCB Hubert LEPORI EUROCONTROL, ATM/STR/SWM
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
AIS-AIM SG - #4 Agenda item 4.1 Integration with other services - SWIM
System Wide Information Management
39 - SPECIAL SESSION: Quality of International Statistics.
Paul Bosman AIS-AIM/SG11 - AOB
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
Global Air Navigation System ~ Planning Mechanisms ~
Date: st October 2016, Venue: CSIR ICC Pretoria, South Africa
4 - 8 November 2013 AIM relevant - Assembly conclusions
Global ATM Operational Concept
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
Workshop on preparations for ANConf/12 − ASBU methodology
ANConf/12 – Agenda H. Sudarshan
ANConf/12 – Agenda H. Sudarshan
ICAO AISAIMSG #8 - Intro 4-8 November 2013
Volcanic Ash Operations Workshop (VAOW) - Objectives
AIXM 5 Development Status
AIM Global Strategy Air Navigation Procedures for AIM Seminar
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
SAM Regional Seminar/Workshop
23 May 2012 AIS-AIM SG #6.
SkyView2 AIXM Conference March 18 , 2008
Presentation transcript:

The European Organisation for the Safety of Air Navigation AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions Paul Bosman Manager SWIM/EA Unit, Agency focal point AIM EUROCONTROL

2 ICAO Air Navigation Conference - I 19 – 30 Nov

3 ICAO Air Navigation Conference AIM/SWIM relevant papers WP9ICAO – AIM progress WP45 Europe – AIM/AIXM developments WP47 Europe – Airport Mapping DataBase WP84 Russia WP103 CANSO IP6ICAO IP32South Africa IP44 South Korea WP7ICAO – basic SWIM concept WP43European progress on SWIM WP64FAA – Performance Based Info Management WP102CANSO – ISO standardisation WP127Industry – Support IP35South Africa See AIM SWIM

4 ICAO Air Navigation Conference AIM Conclusions in a nutshell ICAO to Expedite AIM SARPS and Guidance Review NOTAM system - building from Digital NOTAM States To accelerate AIS2AIM transition (via digital data-chain) Encouraged to impl quality processes from data origin onwards Encouraged to impl (sub-)regional Db & digital data exchange Review NOTAM proc, guidance & oversight Industry To provide AIM systems

5 ICAO Air Navigation Conference SWIM Conclusions in a nutshell ICAO Develop (2014) global SWIM/IM Develop relevant provisions/technical specifications (open & rely on generic international standards) in close collaboration with aviation community Specifically look at security and bandwidth requirements Update ICAO IM/SWIM working arrangements States and stakeholders Contribute to further development and harmonization of performance- based information management Demonstrate (together) how SWIM will meet needs of future ATM Industry Support the transition towards SWIM with appropriate systems supporting automation and the exchange of all relevant air traffic management data in a globally standardized manner