Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.

Slides:



Advertisements
Similar presentations
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Advertisements

Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
EXT Beam Measurements & Corrections Dispersion, Coupling, Beta Matching 10th ATF2 Project Meeting, June M. Woodley1/31.
Spare of Vertical Steering Magnet5 Spare Steering PS for DR (repaired) 5 more steering PS (not repaired) Horizontal Steering will be use the steer, rotated.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Status of very high priority beam tuning software Special ATF2 project meeting, Korea, 1 st October 2008 Cécile Rimbault, on behalf of High Priority task.
CERN, BE-ABP (Accelerators and Beam Physics group) J. Pfingstner Beam jitter studies at ATF and ATF2 Jürgen Pfingstner Hector Garcia Morales 25 th of January.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Kicker Optics – or – Selected ATF-II EXT Line Performance Issues ATF-II Technical Review, April M. Woodley1/40.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
ATF2 Tuning Updates Glen White, SLAC Sept
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
Fifth ATF2 Project Meeting, dec. 2007, KEK, Japan Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault,
Mark Woodley, SLACATF2 Software Review (June 18, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
First investigations of ATF2 at SLAC Axel Brachmann, Thomas Himel, Tom Markiewicz, Janice Nelson, Toshiyuki Okugi, Mauro Pivi, Tor Raubenheimer, Marc Ross,
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
BPM support and beam pipe length FD support status A.Jeremie.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
Proposal of Halo collimation system for ATF2 A.Faus-Golfe, N. Fuster-Martínez J. Resta-López (IFIC) P. Bambade, S. Liu, S. Wallon (LAL) 113/02/1417th ATF2.
Emittance Measurements and Related Experimental Results 15th ATF2 Project Meeting, January M. Woodley1/44.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
EXT: Summary of activities, software development, and tuning performance 11th ATF2 Project Meeting, January M. Woodley1/29.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
Mark Woodley, SLAC5th ATF2 Project Meeting (December 19, 2007)1 ATF2 Layout/Optics (v3.8) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing.
Commissioning Hardware and IP Configuration of ATF / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
J. Brossard, C. Rimbault a P. Bambade LAL / / 8-9 nov LAL 1 Exercising emittance measurements in the ATF EXT line Upgrade.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?
Location of the LW detector- Simulation of the LW signals Lawrence Deacon RHUL ATF2 meeting August 23 rd 2006 KEK.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault, Brossard, P. Bambade (LAL) Main goal : - Try to improve.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Simulation of the α, dispersion, coupling and β multiknobs in large β optics Sha Bai, Philip Bambade, Benoit Bolzon, Javier Resta Lopez
FJPPL-FKPPL ATF2 Workshop Jitter studies March 18, 2014 Beam jitter localization and identification at ATF2 Marcin Patecki Jürgen Pfingstner 18 th of March.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
BDS Status Update Glen White, SLAC July ADI Fuze Meeting.
Status and plan of Beta-matching in Extraction line Kiyoshi Kubo.
Wakefield effect in ATF2 Kiyoshi Kubo
ATF2 Lattice v4.5 Matching and Tuning Performance with Lucretia Glen White, SLAC LCWS2011 Granada, Spain.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
4 th ATF2 Project Meeting, 31 May 2007 A. Seryi 1 Summary of SLAC simulation study of emittance growth in the ATF extraction line SLAC team: J. Amann,
Integrated ATF2 Dynamic Tuning Simulations Glen White, LAL/SLAC ATF2 Software Workshop June 2008 Simulation overview. Tuning for 37nm IP vertical beam.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
IP Tuning Task Updates Glen White, SLAC January
Expected hardware status and Priority of the commissioning task
Emittance Diagnostics
EXT Tuning 13th ATF2 Project Meeting, January M. Woodley.
ATF2 IP Tuning Task Simulation Updates
ILC BDS Emittance Diagnostics: Design and Requirements
Beam Optics Set-Up at SLAC End Station A
3rd ATF2 Project Meeting, December 18-20, 2006
Updates on IR and FF for super-B factory
Emittance Diagnostics
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Emittance Diagnostics
ATF2 Layout/Optics (v3.6) Existing ATF Extraction Line
Presentation transcript:

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction Line Coupling Correction / Emittance Diagnostics

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)2 (v4.0)

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)3 rematched geometry (DR septa realignment) –see report of 55 th ATF2 Weekly Meeting (August 22, 2007) some EXT devices returned to v3.5 locations (Sugahara-san’s list) QS1X and QS2X at Okugi-san’s locations QK2X and QK3X are still in the MAD deck, even though they will not be installed initially updated effective lengths for FF bends and FD quadrupoles updated diagnostic station locations (IPBPM, nBPM; no ODR to start) IPBPM and nBPM reference cavities added; QBPM reference cavities (4) at Honda-san’s suggested locations separate QBPM + mover at vertical “IP phase” for feedback (between QM14FF and QM13FF) … now 34 QBPMs total; QM14FF’s QBPM is now standard three movers restored to FF matching quad section (QM16FF, QM15FF, and QM14FF); now 27 FFTB movers total (plus one Honda-san special for feedback QBPM) IP configuration per Okugi-san’s 5 th ATF2 Project Meeting presentation drift between BDUMP and dump is 2.0 m Version 4.0 Features

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)4 Okugi-san’s stripline BPM assignments Kuroda-san’s device names (also renamed magnet movers using Kuroda-san’s naming convention) FONT devices added per J. Resta-Lopez presentation of February 28, 2008 new initial Twiss and QM6R/QM7R strengths from “drdsgn07Dec03disp” optics –QM6R.1: (DRLBW44) → –QM7R.1: (DRLBW44) → –zero η and η′ (X and Y) at entrance to extraction kicker Version 4.0 Features (cont.)

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)5 QBPM (standard) d/s QD6FF QBPM (standard) d/s QM14FF QBPM (standard) between QM14FF and QM13FF [feedback] from Honda-san’s report of 53rd ATF2 Weekly Meeting (July 25, 2007)

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)6 from Honda-san’s report of 55thd ATF2 Weekly Meeting (August 22, 2007) QBPM moved to d/s end

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)7 from Honda-san’s report of 55thd ATF2 Weekly Meeting (August 22, 2007) not in v4.0

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)8 Stripline BPM Device List Blue ; wide beam pipe Red ; Long Electrode ( High Resolution) Old BPM Name Electrode Length Pipe Diamete r OriginalModifiedBellows Magnet Thickness Pipe Length Total Length Magnet Thickness Pipe Length Total Length OriginalModified Electrod e Side No Electrode Electrode Side No Electrode ML1X40Narrow ○○ ML2X40Wide ×○ ML3X40Wide ×○ ML4X40Wide ×○ ML5X40Wide ○○ ML6X40Wide ×○ ML7X40Narrow ×○ ML8X120Narrow ○○ ML9X120Narrow ○○ ML10X120Narrow ○○ ML11X120Narrow ○○ ML12X120Narrow N/A ○○ ML13X40NarrowN/A 170N/A 170×× ML14X40NarrowN/A ×○ from Okugi-san’s 5 th ATF2 Project Meeting presentation

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)9 nameold namefunctiontype locationcomments ML1XML2XBPMstripline (L.R.)d/s end of QF1X (Hitachi 180) MS1X move by +35mm ML2XML3XBPMstripline (L.R.)d/s end of QD2X (Hitachi 180) ML3XML4XBPMstripline (L.R.)d/s end of QF3X (Hitachi 180) ML4XML5XBPMstripline (L.R.)d/s end of QF4X (Hitachi 180) ML5XML6XBPMstripline (L.R.)u/s end of QD5X (Hitachi 180) ML6XML7XBPMstripline (L.R.)u/s end of QF6X (Hitachi 180) ML7XML1XBPMstripline (L.R.)d/s end of QF7X (Hitach 60) ML8XML14XBPMstripline (H.R.)d/s end of QD8X (Hitachi 180) ML9XML8XBPMstripline (H.R.)u/s end of QF9X (Hitachi 180) ML10XML9XBPMstripline (H.R.)d/s end of QF13X (Hitachi 180) ML11XML10XBPMstripline (H.R.)d/s end of QD14X (Hitachi 180) ML12XML11XBPMstripline (L.R.)d/s end of QF15X (Hitachi 180) QBPM1X BPMC-band cavityd/s end of QD10X (QEA 180) No mover QBPM2X BPMC-band cavityd/s end of QF11X (QEA 180) No mover QBPM3X BPMC-band cavityd/s end of QD12X (QEA 180) No mover QBPM4X BPMC-band cavityd/s end of QD16X (QEA 180) No mover QBPM5X BPMC-band cavityd/s end of QF17X (QEA 180) No mover QBPM6X BPMC-band cavityd/s end of QD18X (QEA 180) No mover QBPM7X BPMC-band cavityd/s end of QF19X (QEA 180) No mover QBPM8X BPMC-band cavityu/s end of QD20X (Hitach 60) C-band BPM with Hitachi QBPM9X BPMC-band cavityd/s end of QF21X (Hitach 60) C-band BPM with Hitachi nameold namefunctiontype locationcomments ML1FFML12XBPMstripline (H.R.)between QM12FF and QM11FFpulse-to-pulse feedback ML2FFML13XBPMstripline (L.R.)d/s dump bend from Okugi-san’s 5 th ATF2 Project Meeting presentation

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)10 Sughara-san’s List all devices from Sugahara-san’s list returned to v3.5 locations tuning/tracking simulations have not yet been made to check the performance

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)11 BH2 BH1 K1 K2 BH1 (SHI “H”) strengths same as existing EXT BH2 (SHI “C”) has 110% of present strength 6.0 m ATF2 Inflector (v4.0)

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)12 from Okugi-san’s 5th ATF2 Project Meeting talk QD0FF S-band BPM Sweeping Magnet Honda Monitor Carbon Wire Scanner C-band BPM 180 Screen Monitor 825 BDUMP Stripline BPM ICT IP BPM IP FF: IP Area MQD0FFMBS2IP M1&2IP MBS1IP Shintake Monitor MW1IP MPIP SWEEP MSPIPMDUMP ICTDUMP

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)13 K 1 (+)K 2 (+)

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)14 SQ WS 90° 180° 90° – x – y 11° 18° 28° 29° 42° 43° 29° σ (μm) 7 < σ x / σ y < 23

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)15

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)16

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)17

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)18 2 nd order dispersion

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)19 chromaticity (EXT)

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)20 beam size (μm) Parameters energy = 1.3 GeV γ ε x = 5×10 -6 m ε x = 2×10 -9 m γ ε y = 3×10 -8 m ε y = 1.2× m σ z = 8 mm σ δ = 0.08 % β x * = 4 mm β y * = 0.1 mm σ x * = μm σ y * = 34 nm

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)21 Program σ y *(rms) σ y *(sig)  ε y Δ  ε y nm nm nm % MAD ELEGANT TURTLE DIMAD LUCRETIA SAD Tracking Results perfect machine 10,000 particles (Gaussian distributions; 5σ) sextupole component in SHI H-bends included multipoles in SLAC epoxy kickers, QM7R.1, BS1X, QF1, and QD0 not included no chromatic correction in EXT

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)22 stabilize beam into Final Focus (especially at sextupoles) 2 dipole correctors per plane (Final Doublet phase and IP phase) 2 BPMs per plane (Final Doublet phase and IP phase) correctors and BPMs should be as far downstream as possible feedback BPMs should have no dispersion cavity BPMs used for feedback must have movers BPMs must have resolution ≤ spot size for sub-σ stabilization requires sub-micron resolution for vertical BPM at IP phase –use a dedicated QBPM with mover at the selected location (between QM14FF and QM13FF ) use a stripline BPM for horizontal BPM at IP phase Pulse-to-Pulse Feedback

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)23 IP IP phase FD phase IP phase FD phase IP phase FD phase IP phase FD phase IP phase FD phase ZV11X ZV1FF MQD10BFF MFB2FF ZH10X ZH1FF MFB1FF MQF9BFF ZH ZV BPM (v4.0)

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008) µm 0.4 µm µm 7.9 µm ZH BPM ZV BPM (v4.0)

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)25 still need 2 new skew quadrupoles (QS2X and QS3X) need two 20 amp bipolar power supplies (QK1X and QK4X) QD14X running at 97% of max power supply current (see parts list … ) power supply for BDUMP power supplies for ZX1X, ZX2X, and ZX3X (BH1X and BH2X trim windings) off-beamline components (PLIC, detectors, gamma collimators, MONALISA, etc.) not included also see comments and notes on each worksheet of the parts list … Version 4.0 Parts List Issues

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)26 still studying effects of far-off-axis extraction through QM7R.1 … may need to rematch EXT or change DR optics to compensate … HIGH PRIORITY need to redo full tuning simulations with QK2X and QK3X missing other Feedforward / Feedback device locations? (horizontal plane … ) simulations with estimated multipole content of SLAC epoxy kickers, QM7R.1, BS1X, shimmed QC3s, … need to redo and expand full tuning simulations (especially with realistic errors in diagnostics) revisit fine-tuning of higher-order aberrations (à la Andre) need “small spot” optics for LW1X (1 µm) operation MPS issues for commissioning? Version 4.0 Optics and Simulation Issues

Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)27 Version 4.0 Release Files Release v4.0 Files (May 27, 2008) ATF2_common.xsif : MAD input file (common definitions) EXT_v4.0.xsif : MAD input file (EXT line) FF_v4.0.xsif : MAD input file (Final Focus) ATF2_v4.0.mad : top level MAD command file ATF2_v4.0.save : MAD SAVE file (for conversion to other optics program inputs) ATF2_v4.0.saveline : MAD SAVELINE file (for conversion to other optics program inputs) ATF2v4.0.ppt : v4.0 overview presentation (PowerPoint) ATF2v4.0.pdf : v4.0 overview presentation (pdf) ATF2DeviceListv4.0r0.xls : detailed parts list (Excel) ATF2v4.0Layout.ppt : scaled cartoons of specific locations (PowerPoint) ATF2v4.0Devices.fig : scrollable beamline schematic (Matlab figure file)