56 Mhz Vacuum Mike Mapes 1-19-2011. 56 Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.

Slides:



Advertisements
Similar presentations
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Advertisements

February 17-18, 2010 R&D ERL David Pate R&D ERL Photocathode Deposition and Transport System David Pate February 17-18, 2010 Photocathode Deposition and.
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
Status of 1.3-GHz Cavity Vacuum Furnace at IB-4 SRF Dev. Group Meeting 27 Sept 2010.
Progress and Plan for Superconducting RF Cavity RF Group.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
LCLS-II Cryomodules Production Plans at Fermilab
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
CM31 - Vacuum System Update Mike Courthold Matt Hills 1.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Yousef I. Makdisi DIS03 St. Petersburg April 24,2003 Polarized Jet target status The overall view The Dissociator stage The Atomic Beam stage The RF transitions.
CM28 - Vacuum System Update Matt Hills Mike Courthold 1.
2007/09/17-21 SLAC IRENG07 1 A Basic Design of IR Vacuum system Y. Suetsugu, KEK Possibility of a pumping system without in-situ baking at z < L*
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 2/21/
LCLS-II Cryomodules Production at Fermilab Tug Arkan, 7/17/2014.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
LANL Cost and Schedule Review 02/11/05 1 Cryostat (lower half) WBS 3.1, 3.5, 3.6, 3.7, 3.8, 3.10 Paul Huffman, Chris O’Shaughnessy North Carolina State.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
ESS Vacuum Standardization
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
S A Griffiths CM42 June 2015 Electrical & Control.
Teleconf ACS – FREIA 28th March 2017
Installation of the T600 at Fermilab
First ideas on particle free installation of BESSY VSR
CERN – Zanon discussions
Field Emission Minimization for LCLS-II
Cryomodule test stand at ESS site
NL12 Girder Removal and Reinstallation
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
Mathieu, Gabriel, Max, Spyros, Guillaume
C50 Cavity pair Assembly Changes
XFEL Vacuum System Commissioning
UK RFD Pre-Series cryomodule
RF test results of SRF cavity evacuated with NEG pump
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
TTC Hot Topic Common Questions
Cryomodule Assembly Plan
CRYOMODULE FINAL ASSEMBLY
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

56 Mhz Vacuum Mike Mapes

56 Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE BOX, AGS COLD SNAKE AND ERL 5-CELL INSULATING VACUUM ALLOWS FOR ROUGHING & LEAK CHECKING PROVIDES PUMPING TO OVERCOME SMALL LEAKS BURST DISC FOR PRESSURE RELIEF

56 Mhz Beam Vacuum System BEAM PIPE IN MODULE IS CRYOPUMPED L/SEC USED TO MAINTAIN VACUUM WHEN WARM SELF CONTAINED WITH 2 ISOLATION VALVES BAKED ENDS – VALVES, PUMPS, GAUGES AND TEES TORR PRESSURE PARTICULATE FREE PROCESSED SILICON OR CLEAN ROOM HEATING JACKETS BURST DISC FOR PRESSURE RELIEF FOR BEAM VACUUM

56Mhz Ring Installation Major Installation Tasks/Items Existing warm bore needs to be Particulate Free Processed Silicon or clean room heating jackets for bakeout Replace AC dipoles with NEG pipe and ion pump Do we need tapered transitions to adapt to WB pipe? Extensive Vacuum I&C rework Add valves with logic for interlocks Add gauges, cables and pumps

All parts used will either come cleaned, or cleaned at BNL Central Shops Cleaning Facility for UHV service. Some components should be specified and delivered particulate free. Small parts, such as a fittings or flanges, can be blown clean with pressurized filtered nitrogen. Other larger or more complicated parts required wet processing such as alcohol and/or ultrasonic cleaning or in the case of long pipes and very large chambers high pressure rinse. –Clean is defined as recording less than 5 counts of 0.3 micron particles over 10 second sample period. Parts are assembled and prepared within class 100 soft wall on a laminar flow bench. Assemblies are double bagged and delivered to portable clean room for assembly onto cavity. Particulate Free Clean Room Process

In-situ Installation of Burst Disks and Helium Introduction System A portable class 100 clean room is installed over the component to be worked on. The space is thoroughly cleaned, blown down and allowed to clean up for several days. Clean assemblies are delivered and installed. Burst disk installation on 5-cell cavity prior to delivery to 912. Installation of helium introduction system on 5-cell

Vacuum I&C New Vacuum Equipment to be Interfaced Turbo pump 3 ion pumps 3 valves 4 gauges sets

56 Mhz Vacuum Cost MAJOR PURCHASES ITEM COST Insulating Vacuum Turbo18K RF shielded gate valves 60k Ion pumps & P.S.17K Gauges and Controllers12K Vacuum chambers & bellows 9K Heating Jackets20K PLC components for I&C 5K TOTAL $141K LABOR Vacuum Technician800 hrs 50K Engineer150 hrs12K Designer120 hrs 8K Central Shops 40 hr 4K TOTAL $74K