8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Feedback on phase adjustment with BPTX Using scope and LHCb BPIM boards to readout BPTX signal BPIM only used for triggering, phase measurements (BPTX1-BC1,
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Far Detector Data Quality Andy Blake Cambridge University.
Signal vs Noise: Image Calibration First… some terminology:  Light Frame: The individual pictures you take of your target.  Dark Frame: An image taken.
Radiation-protection experience at Belle / summary of beam abort system 22 September, 2003 T.Tsuboyama (KEK)
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
Purity measurement at SOLEIL Nicolas HUBERT # on behalf of the diagnostics group: N. Hubert, L. Cassinari, F. Dohou, M. El Ajjouri, M. Labat, D. Pédeau,
S. White, LBS 17 May Van Der Meer Scans: Preliminary Observations.
LHC Lumi Days – 01/03/2012 Jean-Jacques Gras on behalf of the CERN Beam Instrumentation Group 1.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo.
LPROT Experiment TE/MPE/PE EN/STI EN/MME. Objectives Create the conditions to produce hydrodynamic tunneling. Benchmarking FLUKA-BIG2 simulations. Assert.
Atmospheric Aerosol Measurements at the Pierre Auger Observatory The Pierre Auger Observatory operates an array of monitoring devices to record the atmospheric.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Development of Multi-Pixel Photon Counters(MPPC) Makoto Taguchi Kyoto University.
BWS PS and SPS problem report J. Emery
Wednesday ● 02h04: Stable beams # b x 121b. – Peak luminosity 1.2e25 cm-2 s-1 ● 08h32: Beams dumped on request. – Length=6h28. Rampdown.
G. Trad on the behalf of the BSRT team LHC BI 2015 summary 13/11/2015.
ATLAS-ALFA as a beam instrument Sune Jakobsen (BE-BI-PM and PH-ADO) on behave of the ATLAS-ALFA community LS1 LBOC meeting
Wire Scanners Observations In SPS & LHC G. TRAD Emittance working group 26/08/2015.
BRANs Sune Jakobsen (BE-BI-PM) LHC BI 2015 summary
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- THERMAL STEPS ANALYSIS Goals & Means : –apply a “step function” on the cooling water –look at : APD response.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
BI MD# BSRT Measurements Beam 1 and 3.5 TeV 2 bunches with different emittances Bumps: -4, -2,0,2,4 mm Results: 3.5TeV.
F Monitor of Beam in the Abort Gap Randy Thurman-Keup DOE Review of Tevatron Operations at FNAL March 29-31, 2005 a.k.a. Abort Gap Integrator (AGI)
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Status of the NO A Experiment Kirk Bays (Caltech) on behalf of the NO A collaboration Lake Louise Winter Institute Saturday, Feb 22, 2014.
February 10, 2009, G-APD Workshop, GSI Darmstadt1 APD Laser Test Setup Charles University, Faculty of Mathematics and Physics, Institute of Particle and.
Fibre Beam Loss Monitoring system development BI - day 10 March 2016 M. Kastriotou, E. Nebot del Busto M. Boland, F. S. Domingues Sousa, E. Effinger, E.B.
Beam Loss Monitor activities at CTF3 and the Australian Synchrotron CLIC Workshop 18 January 2015 M. Kastriotou, E. Nebot del Busto M. Boland, E.B. Holzer,
Beam abort in KEKB and Background measurement by SVD 8 Feb T. Tsuboyama (KEK)
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
LHC Wire Scanner Calibration
Wednesday 3rd October - morning
LIU Wire Scanner Milestones June 2017
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
SPS Beam Quality Monitor: recap & cheat sheet
LIU Beam Wire Scanners: Status and plans for new SPS and PSB BWS
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Accelerator Physics and Engineering Update Jan 6, 2010
Monday 14th March Second fill with pilot + 3 nominal bunches
Summary of ion week 48 Last beam OP summary of 2010 Week 48
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Friday morning 10:30 Optics measurements and corrections.
Finally.... We had to wait a long time.... We had many problems....
Accelerator Physics and Engineering Update Jan 6, 2010
e+ Vertical Beam Size during CESR-c Collisions
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Monday 24 October hours of 25ns MD
e+ Vertical Beam Size during CESR-c Collisions
Adding and subtracting fractions
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
LHC - Week 38 Technical stop: Katy Foraz
Head-Tail Monitor for CC Diagnostics
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Summary – what we discussed and learned (accelerator)
ATLAS full run-2 luminosity combination
Beam Stability of the LHC Beam Transfer Line TI 8
LHC BIF test setup - update
Monday 152 bunch operation summary
CLEAR’s Inductive Beam Position Monitors
Saturday Morning used to complete the loss maps and asynch dumps (with RPs). All loss maps OK (B. Salvachua), but the off-p cleaning for B1 (Lead) was.
Presentation transcript:

LHC BI 2015 Summary: BSRL M. Palm (BE-BI-PM)

Changes since Run 1 Optical line BSRL and BSRA on extension table Hybrid detectors installed Both beams since TS2 TS3 Hybrid shutter control installed Additional layer of protection against saturation APD Synchrotron light BSRA Hybrid

APD: Performance Distorted bunch profile “Phantom” bunches “Phantom” bunch signal typically decreases during the fill Mechanism not fully understood… Possible cause: bias voltage ripple (>GHz) leading to sensitivity fluctuations and avalanche onset.

Hybrid: Intended use (1) Doublets Satellites Doublet train, B1 (Fill 4164) vdM-scan: Ghost & Satellite fraction Hybrid significantly better than APD Flattop

Hybrid: Intended use (2) B1 Satellite & Ghost map (vdM scan, Aug 25) =Filled/masked bucket Abort Gap

Hybrid: Bonus Abort gap populationSynchronous phase shift, Bunch by bunch

(No baseline subtraction) Raw Beam loss correction Hybrid: Unexpected Most likely beam losses(?) Bunched signal from wrong beam corrupts measurement …can be corrected Long term damage? Profile of opposite beam is detected B1 structure seen by B2 hybrid

Outlook Install BSRL equipment on removable breadboard YETS Current location New location? Fibre

Backup Hybrid abort gap estimate and measured beam loss