Network Operation Fixed Access Circle management Meeting 2009-10 (16-01-2010)

Slides:



Advertisements
Similar presentations
AIRWORTHINESS ASPECTS OF AIRCRAFT LEASING
Advertisements

London Scrutiny Officers Network Meeting. Scrutiny Proposals in the Strengthening Local Democracy Consultation Helen Moores 16/09/2009.
Module 3: Business Information Systems
Laboratory Auditing and Upgrades. AS/NZS2243.1:2005 – Safety in Laboratories Part 1: Planning and Operational Aspects Safety inspections to identify hazards.
Auditing, Assurance and Governance in Local Government
Redressal of Consumer Grievances in BSNL A Presentation by T.N.Sudhindra Kumar CGM, AP Telecom Circle.
Review Questions Business 205
In the succeeding slides we will discuss financial issues as emerged in the 29 th Quality Review Meeting of Finance Controllers in May All these.
Inspection & Test Overview suite412.
View points of Joint Forum. Mobile Sector Land Line Sector Broad Band Sector Decrease of Expenditure Revenue increase ARPU increase.
 A software tool to find out the Best Plan was launched in the CSC Portal on  It was observed by CGMT during his inspection that most of.
2013 California State Emphasis Program.  During a 4 Crude Unit meeting with regulators Chevron personnel admitted they were “thinking about” clamping.
1 Cranes Module 13. 2Objectives After this module you should be able to – identify the most common crane hazards – take the necessary steps to avoid those.
1 Portfolio Committee on Home Affairs Compliance monitoring in the Department of Home Affairs 30 April 2013.
Company Forms, Records & Administrative Procedures Westwind Air Service.
1 Freight Operations Information System COM/CCM’s Conference
Highways Interface National Highways Interface Team.
Understanding Financial Management
APPLICATION FOR ACCESS (PAIA) Mandatory protection (which must be refused in terms of Chap 4 subject to S46) DENIAL OF ACCESS (PAIA) Internal Appeal to.
Estate Policy.  When GRIDCo was formed, there was the need to manage and maintain the company’s properties in a manner which would support its operational.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Independent Care Waiver Program (ICWP) Presentation to: Georgia Association of Community Care Providers (GACCP) Presented by: Marcia Stanford, Human Services.
A WORKSHOP ON FINANCIAL MANAGEMENT IN HYDROLOGY PROJECT – PHASE-II Gujarat Water Resources Development Corporation Ltd. GWRDCGANDHINAGAR (GW Component.
Regulatory Reform Program Proposed Design Approval Rules CASR Parts 21 and 146 Ian Kearsley Manager Engineering Support Section This presentation is.
Oguzhan Sireci Turkey WMO CBS WORKSHOP ON RADAR DATA EXCHANGE April April 2013 R EPORT ON THE STATUS OF WMO R ADAR D ATABASE AND RECOMMENDATIONS.
By – K.N.Jha, By – K.N.Jha, PROCESSING & VERIFICATION OF USO CLAIM.
Statutory Audit of SSA Accounts for A PROGRAMME FOR UNIVERSAL ELEMENTARY EDUCATION MANUAL ON FINANCIAL MANAGEMENT AND PROCUREMENT Ministry of Human.
STRATEGIC PLANS, BUDGETS AND ANNUAL REPORTS Presentation to Portfolio Committee on Arts and Culture 11 March 2008.
TERM LOANS PROCEDURAL REQUIREMENTS. Obligations of assistance.
Recommendations of the 19 th JRM on Financial Management & Procurement 40 th Review Meeting of State FCs- New Delhi (30 th January 2014)
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Implement An Online Management System for PBX Presented by: Bui Phuong Nhung Advisor: Dr. Wei, Chao-Huang.
To infinity and beyond. PLANNED IMPROVEMENT “SMART TARGET” REFERENCEACTION REQUIREDPERSON RESPONSIBLE FOR IMPLEMENTING THE ACTION SPECIFIC MEASURABLE.
Digital Cable Records Management System (A solution for Cable Records management using Geo Enabled Surfing on Customer Access Network (gSCAN)) An initiative.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
Complaints The Policy Company Limited ©. Policy Complaints are encouraged and welcomed as a way of ensuring that any dissatisfaction with the quality.
BROADBAND COMPLAINT BOOKING CALL CENTER HYD,AP TELECOM CIRCLE 1504 CALL CENTER IVRS In IVRS flow, Customer selects Option 1. Then call will.
Integrated Disease Surveillance Project Finance Component National Centre for Disease Control 22, Sham Nath Marg, Delhi
SSA Heads Meeting Consumer Mobility Operation Haryana Circle.
Mid Day Meal Scheme MDM-PAB Meeting –HARYANA On
Common Deficiencies (Audit ). Target & Achievements No target relating to clearance of Internal & External arrears etc. Required periodical meetings with.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
CHIEF ENGINEER(Civil)-Arb-L&B HYDERABAD Developmental Meeting with Associations / Unions on WELCOME 1.
AUTHORIZED ECONOMIC OPERATORS
Agenda of SSA Head Meeting to be held on at Conference Hall. Enterprises Business Team Circle Office, Haryana.
Common Deficiencies in Voucher Level Computerisation.
1 Sales & Marketing - CFA 04/ Class Wise Connection / Class wise with out BB CLASS -ACLASS -BCLASS -CCLASS -DCLASS -E SSA Total W/O BB %
Network Operation Fixed Access Circle management Meeting ( )
Response to Special Education Audit Aaron Fernander, Executive Director Office of Student Programs and Services September 13, 2010 External Core Team Urban.
OUTAGE MANAGEMENT. OUTAGE APPROACH/PHILOSOPHY A) Time based / machine operating hours based concept related to OEM recommendations - More expensive than.
Seriously Deficient What Does It Mean? Prepared and Presented By: Suzanne Leggas Rene’ Poitra.
JPPF MEETING th MARCH 2013 BIRCHWOOD CONFERENCE CENTRE JPPF March S.GOVENDER.
Office of Human Research (OHR) Quality Improvement Program Patrick Herbison Heather Krupinski.
Audit of Accounts & Accounts Records for the year under SSA.
11/23/2016LCBE/gcm Department of Exceptional Children School Year Information Leslie County Schools.
Presentation on Watershed Projects
Management Meeting of SSAs
SSA Heads Meeting December 2017
CTOPUP New Mobile Application
GM HR Haryana Circle.
LG Service Center
GMP Inspection Process
Electrical Receptacle Testing
HARYANA TELECOM CIRCLE
Mid Day Meal Scheme MDM-PAB Meeting – HARYANA On
|| Advance Ruling || Chapter XVII of CGST Act
PMO Advisor / Marine Networks
Rewari SSA among Top-10 SSAs of North Zone
Network Operation-CM SSA Heads Meet 18-June-2016.
Annata 365 Fleet management with Annata 365 June
Presentation transcript:

Network Operation Fixed Access Circle management Meeting ( )

Progress of Rehabilitation-pole less network ABFBDGRGHSRJindKRLRTK SPT Circle Target for YR Achievement up to % achievement up to

CDOT Exchanges Regarding: Working of large no of exchanges in simplex mode From information received from all SSA ’ s in prescribed performas of NCES New Delhi for quarterly meeting it is found that large no of exchanges are working in simplex mode with the details as under: Name of SSAMAX XL No/Total RSUs No/TotalANRAXs No/Total Ambala2/612/6441/98 FaridabadNil 6/6 Gurgaon2/2 HisarNil2/5744/105 RohtakNil9/538/87 Total4/4623/37799/435 Concerned SSA Heads are requested to bring all CDOT exchanges in duplex mode.

Exchanges having earth Resistance beyond prescribed limit:- Note:-Bring the Earth resistance of all exchanges with in prescribed norms ≤ 0.5 ῼ. SSA Exchange Earth Resistance Total No of exchanges No of Exchanges having earth resistance value <1 ohm > 1 ohms Karnal (Jhanjari, Gheer, Ramthali, Hathwala & Gharaunda RSU) The GMTD Karnal is requested to take n/action to bring the E/R of all exchanges with in norms.

QOS parameters as on

Detail of SSA wise pending compliance of inspection carried out by CFA section from to S No Name of SSATotal Inspections carried outNo of Inspections for which compliance is pending 1Ambala256 2Faridabad4 0 3Gurgaon63 4Hisar62 5Jind8 0 6Karnal21 3 7Rewari71 8Rohtak7 0 9Sonepat8 0 TOTAL91 15 During Inspection it has been found that fault rate is very high (approx. 14% to 20%) as compared to fault rate sent in ONLINE MOC/MIS. You are therefore requested to look into matter and n/action may be taken in this regard. CGMT has taken it very seriously. Inspection carried out by Circle CFA Team

Status of Inspection/Visit made by DGM/GMTD/CGMT is as under:

Inspection carried out by Circle NFA team SNoSNo Name of Exchange Inspection carried out on done on Compliance received or not Major discrepancies 1NUH (GRG) to received Simplex Mode wkg, No protective devices, FRS and DOT Soft not accessible, fault rate and MTTR high. Pillars/DPs in very bad condition 2Gurgaon main (GRG) to Not received There are certain procedural lapses. Daily routine procedures, office records, upkeep of exch. has not been followed. Outdoor plant presents a shabby picture 3 Bahadurgarh (RTK) to Report is under submission Pillars/DPs in very Bad condition, Fault rate and MTTR very high, CSC not maintained properly, Power plant modules faulty

Inspection carried out by Core Groups S NoName of core group Meeting done on Recommendations 1OCB Received1.Power plant history is to be maintained regularly. 2.Audio/Visual Alarm for Rectifier failure should be extended. 3.Most of Broadband plans should be available on P-2.2 platform. 4.Implementation of CCR improvement document in all exchanges 5.Implementation of synchronization in all exchanges. 6.Sharing of spare cards/hardware should be done. 2Battery & power plant Not received so far 3EWSD Received 4AXE Complete report not received 5Broadband Received

Progress of External plant Up-Gradation of Pilot SDCAs as on S. No Name of SSA Name of SDCA Total no of Pillars/Cabinets/MDF s existing in SSAs pilot /Circle pilot Total no of Pillars/Cabinets/ MDFs & DPs dressed/rehabilil ated Total length of drop wire replaced Total number of telephone instrumenm t replaced Fault rate before rehabiilati on Fault rate after rehabiilati on Total expenditure (Rs) incurred for this activity 1AmbalaBarara Pillars: 40 cabinets: Nil MDFs: 14 DPs: 2132 Pillars: 35 cabinets: Nil MDFs: 14 DPs: Km %5.0%Nil 2 Faridab ad Pillars: 109 cabinets: Nil MDFs: 02 DPs: 3461 Pillars: 74 cabinets: Nil MDFs: 02 DPs: 2010 Nil %4.60%Rs 20000/- 3 Gurgao n Pillars: 55 cabinets: Nil MDFs: 07 DPs: 2500 Pillars: 53 cabinets: Nil MDFs: 07 DPs: Km %4.10%Rs 80000/- 4HisarFatehabad Pillars: 47 cabinets: Nil MDFs: 23 DPs: 2515 Pillars: 47 cabinets: Nil MDFs: 23 DPs: km %2.29% Nil 5JindNarwana Pillars: 53 cabinets: Nil MDFs: 28 DPs: 5395 Pillars: 28 cabinets: nil MDFs: 25 DPs: Km %7.74%Nil 6KarnalCheeka Pillars: 56 cabinets: Nil MDFs: 08 DPs: 2547 Pillars: 56 cabinets: nil MDFs: 08 DPs: Km507.00%4.60Rs 50000/- 7RewariNarnaul Pillars: 79 cabinets: 0 MDFs: 17 DPs: 3800 Pillars: 79 cabinets: 0 MDFs: 17 DPs: Km Rs Rohtak Pillars: 70 cabinets: Nil MDFs: 02 DPs: 2112 Pillars: 65 cabinets: Nil MDFs: 22 DPs: Km %4.43%Rs 20000/- 9Sonepat Pillars: 42 cabinets: 0 MDFs: 11 DPs: 3375 Pillars: 42 cabinets: -- MDFs: 11 DPs: Km2015%4.90%Rs 28485/- Total Pillars: 561 cabinets: 0 MDFs: 102 DPs: Pillars: 479 cabinets: 0 MDFs: 129 DPs: Kms %4.39% Rs /-

Pending Issues 1.Opening of & :- Access for Private operators to Land Line call center in all SDCA’s and testing has to be made as HQ letter no 16-5/2010-PHM dated ) I. Broadband = STD code & II. Land line = STD code (pending from all SSA’s except GRG) 2.Opening of M/s Just Dial No in all exchanges of Circle and forwarding to Noida call center No 0120 – (FBD & GRG has denied for opening of no as the same is working with other Pvt company. Pending from all other SSA’s except Ambala where in one SDCA is pending for the same.