Peak LAN Project Group A:

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

MIGRATION MIGR-09. How to Run Your Next Implementation... Don't Let It Run You! Patricia Johnson Senior Systems Consultant Strategic Systems Group, Inc.
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
The Software Project Management Discipline Succes software projects require careful planning and good use of iterative approaches. Understanding risks.
Identifying and Selecting Projects
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 5 Managing Risk.
Silver Fiddle Construction: The Czopek Project
Project management methodology Project Cycle Management A short training course in project cycle management for subdivisions of MFAR in Sri Lanka.
Nov. 13, 2003CS WPI1 CS 509 Design of Software Systems Lecture #11 Thursday, Nov. 13, 2003.
Project Work and Administration
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
8 Managing Risk Teaching Strategies
IS&T Project Management: How to Engage the Customer September 27, 2005.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
C ALL C ENTER O PTIMIZATION P ROJECT J.P. Cap + Vitality, Inc. | J.P. Cap |
Project Risk Management
©Ian Sommerville 2006Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project management DeSiaMore 1.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Concerned with activities involved in ensuring that software is delivered: on.
RISK MANAGEMENT PRESENTATION ASQ- GREATER HOUSTON SECTION 1405 Lila Carden, Ph.D., MBA, PMP University of Houston Instructional Associate Professor
System Planning- Preliminary investigation
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
Kick-off Meeting Kick-off Meeting Presented By:.  Project/s overview and Scope  Project Organization Structure  Client Overview  Project Profitability.
Chapter 4 The Project. 2 Learning Objectives Third phase starts after a contract is drawn up and ends when the project objective is accomplished; final.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project management Lecture 10. Topics covered Management activities Project planning Project scheduling Risk management.
SacProNet An Overview of Project Management Techniques.
Project Charters Module 3
Supporting Industry Change Planning: Risk & Milestone Assessment Process & Tools 07/07/2014.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Software Engineering, 8th edition. Chapter 5 1 Courtesy: ©Ian Sommerville 2006 Oct 13 th, 2008 Lecture # 6 Project management.
Introducing Project Management Update December 2011.
SOFTWARE PROJECT MANAGEMENT
Strategies for Knowledge Management Success SCP Best Practices Showcase March 18, 2004.
1 Project management. 2 Topics covered Management activities Project planning Project scheduling Risk management.
Project Management.
Project management 1/30/2016ICS 413 – Software Engineering1.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Cerberus Corporation Candace Hunt MGMT 505: Project Management Fundamentals September 20, 2011.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
Lecture 7: Project Risk Management Murodullo Bazarov November 2, 2015.
Dr. Gerry Firmansyah CID Business Continuity and Disaster Recovery Planning for IT (W-I)
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
1 Project management Organising, planning and scheduling software projects.
Risk Management DIA Working Group 22 May 2017.
Project management.
Project Management Lifecycle Phases
Welcome.
Presenter Name | Company Name
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Part II Project Planning © 2012 John Wiley & Sons Inc.
[Project Name] Project Report
IS&T Project Reviews September 9, 2004.
Presenter Name | Company Name
Project management Lecture 9
Risk Management Process (Revised)
Presenter Name | Company Name
[Project Name] Project Report
Presenter Name | Company Name
<Project Name> Milestone Summary Report
Presenter Name | Company Name
PROJECT PLANNING AND SCHEDULING BY: AMINATH SHAAYAN SHAHID.
Presentation transcript:

Peak LAN Project Group A: Timothy Flannigan, Candace Hunt, Bobby McCrary, Karie Smithers and Stacy Welk MGMT 505: Project Management Fundamentals September 18, 2011

Overview Company Profile Company Project Identifying and Managing Milestones Budget Constraints Assessing Probable Set-Backs Customer Satisfaction Project Risks Risk Assessment Form Risk Response Matrix Summary

Peak Systems Information Systems Consulting Firm, small Meridian, Louisiana - Manager aided by one peak professional and two interns from local university

Project Design and install local area network (LAN) for Meridian Social Service Agency Deliverables Technical Requirements Limits and Exclusions Budget =<$90,000 Time limit = 1 month Deliverables = 22 workstations & 22 laptops Server with dual-core processors Windows 2008 R2 service & workstation OS (Vista/Windows 7) 4 hours of intro training for client’s personnel 16 hours of training for client network admins Technical Requirements = Workstations with 17in flat panel monitors, dual-core processors, 2GB RAM, 8X DVD+RW, wireless card, Ethernet card, 80 GB hard drive Laptops with 12in display minotr, dual-core processors, 2GB RAM, 8X DVD+RW, wireless card, Ethernet card, 60 GB hard drive and weight less than 4.5 lbs. Wireless network interface cards and Ethernet connections System must support Windows Vista/Windows 7 platforms System must provide secure external access for field workers Limits and Exclusions System maintenance and repair only up to one month after final inspections Warranties transferred to client Only responsible for installing software designated by the client two weeks before start of project Client will be billed for additional training beyond that prescribed in contract

Identifying and Managing Project Milestones Hardware – Availability and cost of products to complete the project User’s Priority and authorization – Who, and what the users will be granted access too. In house network test - Organization with third party, and meeting the agenda with the customer Client site test – Meeting test deadlines, and planning the observation period with the customer Training completed – Complete all training to become self operational, and compatible

Milestones Key Milestones Target Date Hardware January 22 2. Setting Users’ priority and authorization January 26 3. In-house whole network test February 1 4. Client site test February 2 5. Training completed February 16 Hardware = acquire and install Setting users = build profiles Network test = test system for performance Client Site Test = test user and system for performance Training = provide user and administrator training

Budget Constraints Time phased-budget baseline Helps identify the cost of tangible items, and resources to complete the project It is overall important for the projects success to measure the projects performance Monetary, and time sensitive budgets drive overall project success Resource utilization – Make sure that all resources are being utilized to the highest efficiency - Garner resources, and relations to complete the project at a low cost

Assessing Probable Set-backs Accept possible set-backs during project planning for maximum readiness, and avoidance Complete a risk assessment form to evaluate and rate possible risk during the project Likelihood: 5 represents greatest to 1 with least probability of occurrence -Impact: 5 represents gravest to 1 with least jeopardizing project deliverables Detection Difficulty: 5 represents hardest to 1 with least difficulty

Customer Satisfaction Customer Satisfaction displays a complete understanding of meeting the customers needs, wants, and expectations The Project Manager is responsible for ensuring 100% Customer Satisfaction is meet. Notify the customer of all needs, and possible set- backs to accomplish the project. This allows the customer to be involved, and ensure their decisions, and needs are meet within the project

Project Risks Identifying and Managing Milestones Budget Constraints Technical Requirements and Deliverables Assessing Probable Set-backs Customer Satisfaction

Risk Assessment Form Risk Event Likelihood Impact Detection Difficulty When Milestones not met 3 1 Each Budget over obligated Each Milestone Timing of Resources Customer Satisfaction 5 Setbacks: unexpected events The higher the number the greater the risk/impact/difficulty. Likelihood: 5 represents greatest to 1 with least probability of occurrence Impact: 5 represents gravest to 1 with least jeopardizing project deliverables Detection Difficulty: 5 represents hardest to 1 with least difficulty

Risk Response Matrix Risk Event Response Contingency Plan Trigger Who is Responsible Milestones Mitigate: Structure development Plan Share important tasks w/ workers Complete before project kickoff Team Budget Restrictions Mitigate: Set a time-phased budge Plan accordingly Must be worked into development plan Managers Timing of Resources Mitigate: Prioritize and allocate resources Have Replacements available Implement timing throughout project Customer Satisfaction Mitigate: Educate & involve through completion Understand project scope Must have involvement start to finish Project Manager Setbacks: unexpected events Mitigate: Plan into budget and time Have a plan B Identify risk throughout project

Summary Objective Milestones Budget Setbacks Customer Satisfaction Risks

References Dr. Susan Michie. (2002). CAUSES AND MANAGEMENT OF STRESS AT WORK. Occupational and Environmental Medicine, 59:67-72. Erik W. Larson, Clifford F. Gray. (2011). Project Management the Managerial Process. New York: McGraw-Hill Companies, Inc. Higginbotham, J. (208, March 31). Project Planning: Identify Milestones, Assumptions, and Tasks. Retrieved September 16, 2011, from Volunteer Centered: http://www.volunteercentered.com/2008/03/31/project-planning-identify-milestones-assumptions-and-tasks/ JOHN R. DRAKE, TERRY ANTHONY BYRD. (2006). RISK IN INFORMATION TECHNOLOGY PROJECT PORTFOLIO MANAGEMENT. JOURNAL OF INFORMATION TECHNOLOGY THEORY AND APPLICATION, 1-11. Kim, S.-c. (2009). Project success indicators focusing on residential projects: are schedule performance index and cost performance index accurate measures in earned value? Canadian Journal of Civil Engineering, 1700. University of Wisconsin. (2006, February 1). Develop High-Level Milestones and Timeline. Retrieved September 16, 2011, from Project Management Advisor: http://pma.doit.wisc.edu/initiate/4/print.html