ERCOT Monthly Operational Overview (July 2012) August 15, 2012.

Slides:



Advertisements
Similar presentations
MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
Advertisements

1 Generation Adequacy Task Force Report to TAC April 7, 2005.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Settlement Stability 2015 Q1 Update to COPS Mandy Bauld ERCOT COPS 04/15/2015.
Market Operations Presentation ERCOT Board of Directors October 21, 2008 Updated as of 10/21/08 Betty Day.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
Matt Tozer ERCOT Manager, Settlements & Billing 9/4/2013 ERCOT Update Management of the Balancing Account CMWG.
1 Market Trials Update NATF June 1, 2010.
CRR Shortfall – Revenue Equalization Part 3 (Continuation from 3/5/08 TPTF discussion) Bill Barnes/Sharon Wang TPTF 3/21/2008.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Market Credit Working Group Update to WMS Wed. Sept 16, 2009.
Project Funding Report November 1, Business Integration Update – Agenda –Project Portfolio Updatep Revision Request Funding Reconciliation.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Temperature Assumptions for Dynamic Ratings in ERCOT CRR Auctions Proposal to differentiate between Day (PeakWD & PeakWE) and Night (Off-peak) October.
MISUG Meeting Materials ERCOT 9/07/ MISUG Agenda 9/07/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3. Follow up.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
Cutover Update NATF 2 November Today’s Agenda Reminders Program Status 24 Hour LFC Test Update Cutover Update Soft Launch 2 November 2010NATF.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Operations Update ERCOT Board Meeting March 18, 2003.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
1 Market Operations Presentation Board of Director’s Meeting December 13, 2005.
March 22, 2011 ERCOT Board of Directors Commercial Market Operations Version 2 - Updated on March 18, 2011 Betty Day.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Settlement Stability 2015 Q1 Update to COPS- DRAFT Blake Holt ERCOT COPS 07/15/2015.
Project Funding Review February 7, Background ERCOT has a $15M project budget in 2013 (same as 2012) –To allow for new additions to the.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
1 Market Operations Presentation Board of Director’s Meeting August 16, 2005.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
1 Market Operations Presentation Board of Director’s Meeting February 16, 2005.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
CRR Deration and NPRR821 WMS 09/06/2017.
Market Trials Update NATF March 2,
Nodal Program Update to Cops
Wind Management at MISO
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Basin Electric SPP Market Update
Presentation transcript:

ERCOT Monthly Operational Overview (July 2012) August 15, 2012

Grid Operations & Planning

3 Content Summary July 2012 Operations –Peak Demand: Actual vs. Forecast On-line Resources: Total at Peak and Wind –CPS1 Monthly Performance –Historical Peak and Minimum Loads –Day-Ahead Load Forecast Performance –Reliability Unit Commitment Capacity (RUC) by weather zone –Generic Transmission Limits (GTLs) –Advisories, Watches and EEAs –Significant System Incidents Planning Activities –Summary –Generation Interconnection Requests –Wind Capacity ERCOT Public August 15, 2012

4 July 2012 Daily Peak Demand: Hourly Average Actual vs. Forecast, Wind Day-Ahead COPs & On-line Capacity at Peak Note: All data are hourly averages during the peak load hour obtained from COPs, and EMMS. ERCOT Public August 15, 2012

5 July 2012 Actual Wind Output plus Curtailments vs. Wind Day-Ahead COPs for All Hours Note: QSEs must use the AWST 50% probability of exceedance forecast as the HSL in their COPs % of Hours when Estimated Uncurtailed Wind Output >= COP HSLs (Target = 50%) 38% ERCOT Public August 15, 2012

6 July 2012 ERCOT’s CPS1 Monthly Performance CPS1 12 Month Rolling Average = % ERCOT Public August 15, 2012

7 July 2012 Monthly Peak Actual Demand ERCOT Public August 15, 2012

8 July 2012 Monthly Minimum Actual Demand ERCOT Public August 15, 2012

9 Day-Ahead Load Forecast Performance in July 2012 Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 14:00 Day Ahead 2009 MAPE 2010 MAPE 2011 MAPE 2012 MAPE Jul 2012 MAPE Average Annual MAPE Lowest Monthly MAPE Lowest Daily MAPE 0.85 Jul – 21 Highest Monthly MAPE Highest Daily MAPE 6.06 Jul – 08 ERCOT Public August 15, 2012

10 Reliability Unit Commitment (RUC) Capacity by weather zone in July 2012 ERCOT Public August 15, 2012

11 July 2012 Generic Transmission Limits (GTLs) GTL: A transmission flow limit more constraining than a Transmission Element’s normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOT’s transmission security analysis applications. Note: This table lists how many times a constraint has been activated to avoid exceeding a GTL limit, it does not imply an exceedance of the GTL occurred. GTLs Jul 11 Days GTLs May 12 Days GTLs Jun 12 Days GTLs Jul 12 Days GTLs Last 12 Months Total Days (Jul11 – Jul12) North – Houston00001 West – North Jul(4,23) 185 Valley Import ERCOT Public August 15, 2012

12 Advisories and Watches in July 2012 Advisories issued for Physical Responsive Capability (PRC) below 3000 MW –None Watches issued for Physical Responsive Capability (PRC) below 2500 MW –One Watch for PRC under 2500 MW issued July 30 due to multiple unit trips. Transmission Watches –None Energy Emergency Alerts –None ERCOT Public August 15, 2012

13 Lake Levels Update – 01 August 2012 Surface Water & (MW) Full Conservation Pool *Level on Jan 1, 2011 *Level on Oct 7, 2011 *Level on Aug 01, 2012 Lake Texana (56) Bardwell Lake (312) Lake Colorado City (407) 2, Lake Ray Hubbard (916) Lake Granbury (983) Lake Houston (1016) Twin Oaks Reservoir (1616) Lake Limestone (1689) Martin Lake (2425) * In Feet above Mean Sea Level ERCOT Public August 15, 2012

14 Planning Summary – July 2012 ERCOT is currently tracking 133 active generation interconnection requests totaling over 35,000 MW. This includes over 20,000 MW of wind generation ERCOT is currently reviewing proposed transmission improvements with a total cost of $153.7 Million Transmission Projects endorsed in 2012 total $446.7 Million All projects (in engineering, routing, licensing and construction) total approximately $9.77 Billion Transmission Projects energized in 2012 total about $325.7 Million. ERCOT Public August 15, 2012

15 County Location of Planned Generation with Interconnection Requests (all fuels) July 2012 ERCOT Public August 15, 2012

16 County Location of Planned Generation with Interconnection Requests (Wind) July 2012 ERCOT Public August 15, 2012

17 Wind Generation – July 2012 ERCOT Public August 15, 2012

18 Generation Interconnection Activity by Fuel – July 2012 ERCOT Public August 15, 2012

19 Generation Interconnection Activity by Project Phase – July 2012 ERCOT Public August 15, 2012

Market Operations

21 Day-Ahead Schedule – July 2012 August 15, 2012ERCOT Public

22 Day-Ahead Electricity And Ancillary Service Hourly Average Prices – July 2012 August 15, 2012ERCOT Public

23 Day-Ahead Vs Real-Time Load Zone SPP (Hourly Average) – July 2012 August 15, 2012 Load Zone West prices were higher due to local congestion caused by transmission outages and low wind in the West Zone ERCOT Public

24 Day-Ahead Vs Real-Time Hub Average SPP (Hourly Average) – July 2012 August 15, 2012ERCOT Public

25 DRUC Monthly Summary – July 2012 August 15, 2012ERCOT Public

26 HRUC Monthly Summary – July 2012 August 15, 2012ERCOT Public

27 Non-Spinning Reserve Service Deployment – July 2012 August 15, 2012 Deployment Start Time Deployment End Time Deployment Duration (Hours) Max Deployment (MW) Reason 7/30 4:06 PM7/30 5:05 PM Capacity ERCOT Public

28 CRR Price Convergence – July 2012 August 15, 2012ERCOT Public

29 Reliability Services – July 2012 Reliability Unit Commitment (RUC) $ in Millions RUC Make-Whole Payments($0.00) RUC Clawback Charges$0.00 RUC Commitment Settlement($0.00) RUC Capacity Short Charges$0.00 RUC Make-Whole Uplift$0.00 RUC Commitment Cost Allocation$0.00 RUC Decommitment Payments$0.00 RUC Cost continues to trend low. July 2012 cost was $0.002M, compared to: A charge of $0.01M in June 2012 A charge of $0.88M in July 2011 August 15, 2012ERCOT Public

30 Ancillary Services – July 2012 Capacity Services $ in Millions Regulation Up Service$3.0 Regulation Down Service$0.8 Responsive Reserve Service$14.1 Non-Spinning Reserve Service$5.7 Black Start Service$0.6 Voltage Services - Reactive Power$0.0 Voltage Services - Lost Opportunity$0.0 Total Capacity Service$24.25 Capacity Services costs decreased from last month, and are much lower than July Cost increases observed in the latter days of the month. July accounted for approximately 30% of the month’s cost. July 2012 cost was $24.25M, compared to: A charge of $34.33M in June 2012 A charge of $49.80M in July 2011 August 15, 2012ERCOT Public

31 Energy Settlement – July 2012 Day-Ahead Market settlement decreased from last month. Real-Time energy settlement decreased from previous month. Decreases are attributable to lower prices. DAM & RTM energy settlement peaked on July Day-Ahead Market Energy Settlement $ in Millions Energy Purchases$ Point to Point Obligation Purchases$56.85 RMR Day-Ahead Revenue$0.00 Energy Sales($503.55) Day-Ahead Congestion Rent$68.60 Day-Ahead Market Make-Whole Payments($0.30) Real-Time Market Energy Settlement $ in Millions Energy Imbalance at a Resource Node($586.79) Energy Imbalance at a Load Zone$ Energy Imbalance at a Hub($233.95) Real Time Congestion from Self Schedules$0.30 Block Load Transfers and DC Ties($5.70) Impact to Revenue Neutrality$58.22 Emergency Energy Payments($0.03) Base Point Deviation Charges$0.37 Real-Time Metered Generation (MWh in millions)33.81 August 15, 2012ERCOT Public

32 Congestion Revenue Rights (CRR) – July 2012 Auction Disbursements $ in Millions Annual Auction($14.91) Monthly Auction($16.25) Total Auction Revenue($31.16) Day-Ahead CRR Settlement($48.51) Day-Ahead CRR Short-Charges$0.01 Day-Ahead CRR Short-Charges Refunded($0.01) Real-Time CRR Settlement($2.95) Real-Time CRR Short-Charges$0.00 Real-Time CRR Short-Charges Refunded($0.00) Total CRR Proceeds($51.46) Day-Ahead Point to Point Obligations Settlement$56.85 Real-Time Point to Point Obligation Settlement($66.39) Net Point to Point Obligation Settlement($9.54) Congestion Revenue Rights were fully funded. Highest CRR settlement observed on July Excess funds available for distribution to load. Distribution of balancing account funds to load for July 2012 was $20.14M, compared to: $15.73M in June 2012 $14.94M in July 2011 High excess funds due to separation in West Hub to West Load zone prices August 15, 2012ERCOT Public

33 Revenue Neutrality – July 2012 Revenue Neutrality Settlement $ in Millions Real-Time Point to Point Obligation Settlement ($66.39) Real-Time Point to Point Options and Options with Refund Settlement ($2.95) Real-Time Energy Imbalance Settlement $63.63 Real-Time Congestion from Self-Schedules Settlement $0.30 DC Tie & Block Load Transfer Settlement ($5.70) Charge to Load$11.12 Revenue Neutrality charges to load increased in July July 2012 was a charge of $11.12M, compared to: $7.03M charge in June 2012 $3.02M charge in July 2011 August 15, 2012ERCOT Public

34 Net Uplift to Load – July 2012 Net uplift to Load decreases over last month. July 2012 was a credit of $2.08M, compared to: A charge of $12.33M in June 2012 A credit of $6.65M in July 2011 Market-Based Uplifts $ in Millions CRR Auction Revenue Disbursement Settlement ($31.16) Balancing Account Proceeds Settlement($20.14) Net Reliability Unit Commitment Settlement$0.00 Ancillary Services Settlement$24.25 Reliability Must Run Services Settlement$0.0 Reliability Must Run for Capacity$0.0 Real-Time Revenue Neutrality Settlement$11.12 Emergency Energy Settlement$0.03 Base Point Deviation Settlement($0.37) Total($16.27) Fee Uplifts ERCOT Administrative Fee Settlement$14.20 Net Uplift Charge to Load ($2.08) August 15, 2012ERCOT Public

35 Advanced Meter Settlement Impacts – July 2012 July 2012: At month end, settling 5.5M ESIIDs using Advanced Meter data. July 2012: 88.9% of the load in ERCOT is settled with 15-min interval data (AMS, Competitive IDR, and NOIE IDR). August 15, 2012ERCOT Public

36 ERCOT Wide Load Volumes by Meter Type – INITIAL Settlement – July 2012 August 15, 2012ERCOT Public

37 Retail Transaction Volumes – Summary – July 2012 Year-To-DateTransactions Completed Transaction TypeJuly 2012July 2011July 2012July 2011 Switches588,755457,57790,42572,044 Move - Ins1,290,3061,247,896212,373191,916 Move - Outs636,806644,162109,055100,829 Continuous Service Agreements (CSA)315,868216,74965,83849,643 Mass Transitions5,51822,0565,5170 Total2,837,2532,588,440483,208414,432 Total since June 1, ,762,097 ERCOT Public August 15, 2012

38 Retail Transactions Summary – July 2012 ERCOT Public SwitchesMove-Ins Move-Outs Mass Transition August 15, 2012

39 Retail Performance Measures (Switch) – July 2012 ERCOT Public 1 st Quarter2 nd Quarter 3 rd Quarter 4 th Quarter August 15, 2012

40 Retail Performance Measures (Priority Move-In) – July 2012 ERCOT Public 1 st Quarter2 nd Quarter 3 rd Quarter 4 th Quarter August 15, 2012

41 Retail Performance Measures (Standard Move-In) – July 2012 ERCOT Public 1 st Quarter2 nd Quarter 3 rd Quarter 4 th Quarter August 15, 2012

Projects Report

43 ERCOT Portfolio Stoplight Report (as of 8/13/2012) ERCOT Public August 15, 2012

44 ERCOT Portfolio Stoplight Report (as of 8/13/2012) ERCOT Public August 15, 2012

45 ERCOT Portfolio Stoplight Report (as of 8/13/2012) ERCOT Public August 15, 2012