LHC Workshop, Jan '05P. Collier AB-OP/LHC1 450 GeV P. Collier AB/OP  Prerequisites  First Turn  Getting Closure  RF Capture  Preliminary Commissioning.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
Beam Commissioning Workshop, 19th January Luminosity Optimization S. White, H. Burkhardt.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
LHC progress Report LHCC Wednesday 23 rd March 2011.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
R. Assmann - LTC Two Beam Operation R.W. Aßmann with W. Venturini and V. Kain LTC Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Ramping & Snapback Andy Butterworth AB/RF Chamonix XIV 17 January 2005.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
June 2006LHCCWG / J. Wenninger1 Orbit response measurements and analysis J. Wenninger AB-OP Principle Software status Example from SPS ring and lines Potential.
1 EMMA Tracking Studies Shinji Machida ASTeC/CCLRC/RAL 4 January, ffag/machida_ ppt & pdf.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
Threading / LTC/ JW1 How difficult is threading at the LHC ? When MADX meets the control system … J. Wenninger AB-OP &
Alignment and beam-based correction
Wednesday 8.9 External crossing angles:
LHC Commissioning with Beam
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Powering the LHC Magnets
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Impact of remanent fields on SPS chromaticity
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Thursday morning – optics correction
CNGS Primary Beam Results 2010
Alice solenoid – orbit distortion
Nonlinear Field Quality Checks
Lost at 12:05 to power converter (RTQX2.R1) problem
Saturday 2/4/ :00-09:00 Problems with SPS:
Planning at 5 o’clock meeting Friday
Wire almost entirely through beam before BLM triggers dump
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Saturday 7th May Sat – Sun night
Machine Tolerances in Cleaning Insertions
450 GeV Preliminary Commissioning: Measurement Programme
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Collimators: Operations - Baseline Assumptions
Optics Measurements in the PSB
Another Immortal Fill….
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Feedbacks & Stabilization Getting them going
Upgrade on Compensation of Detector Solenoid effects
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

LHC Workshop, Jan '05P. Collier AB-OP/LHC1 450 GeV P. Collier AB/OP  Prerequisites  First Turn  Getting Closure  RF Capture  Preliminary Commissioning  Tuning up  Summary

LHC Workshop, Jan '05P. Collier AB-OP/LHC2 Introduction Beam commissioning at 450 GeV is planned to take place in three stages:  A sector test with beam through sector 7-8, several months before  Preliminary commissioning at 450GeV for the whole ring using a special cycle (with different working point and a degauss blip)  Passage to a ‘normal’ ramping cycle in preparation for commissioning the ramp Here will concentrate on the second stage  The first part of this is also valid for the sector test.  In addition, later parts might take place after initial ramp commissioning Many details are contained in the Session VII of Chamonix XII And in the beam commissioning web pages … so a more general overview is given here

LHC Workshop, Jan '05P. Collier AB-OP/LHC3 Prerequisites A set of settings for the magnetic machine:  Using an optics having an increased tune split – Q h =64.285, Q y =  With crossing angles, separation schemes, experimental magnets etc. OFF  Minimizing the dynamic effects by using a ‘degauss blip’ A cycle for each powering circuit must be defined to allow us to recover to a given condition (reproducibility) Some Circuits will be not needed at first:  Spool piece and lattice Octupoles & Decapoles  Non-linear correctors in the inner triplets  Skew sextupoles  Experimental compensation elements … -140 PC’s Leaves ~1570 to power! L. Bottura

LHC Workshop, Jan '05P. Collier AB-OP/LHC4 Convert to Current via a transfer function …  I(t)  Convert strength to integrated field ->b n (t)  TF comes from magnetic measurements : warm & cold  Need to interpolate between measured points of the transfer function - or are provided with a model Prerequisites (2) Settings Generation Other Settings Generation:  Power b 3,b 4, b 5 spool piece magnets + skew quads based on magnet measurements (though only b 3 powered for the first turn)  The RMS is invoked during settings generation when model predictions are required Start with:  Baseline Energy function  E(t) for the chosen cycle  Normalized strengths from MAD – optics file  K(t) for each object  Description of magnet / magnet family e.g. magnetic length In this case only need the injection settings for beam but still need a ‘cycle’ for reproducibility & ‘reset’

LHC Workshop, Jan '05P. Collier AB-OP/LHC5 Prerequisites (3) Other Things:  Beam instrumentation: auto-triggering for the BPM’s. DC-BCT should just work  Beam loss monitors, radiation monitors ready to go  Beam down the pipe from the SPS at the right energy and injected [Bren]  Collimators, Protection elements etc. out of the way -including TL collimators  Screens – will use matching screens in IR4 to see the beam pass by …  Beam Interlock system – -configured to a minimum level – to match our minimum situation.  RF Power OFF Initially – used once we have multiple turns.  RF Low-level system for synchronization tested and available. - used to provide timing reference to fire kickers.  Mountains of Software – the usual stuff  Software interlock system  … and so on … And of course the basics from machine checkout … cold, powered magnets, access system, controls, technical services and the like

LHC Workshop, Jan '05P. Collier AB-OP/LHC6 Automated Threading Not very successful in LEP – but not pushed too much. Tends to be perturbed by: large unphysical offsetscalibration errorscabling errors  BPM’s with large unphysical offsets, calibration errors, or cabling errors (Ring, Plane or Sign) wrong polarity  Correctors with wrong polarity quadrupole misalignments  Large quadrupole misalignments – or settings errors First Turn LEP Trajectory Threading … A reasonable 1 st turn in LEP Bad Pickups cause headaches for automatic threaders Manual Threading  Expect beam to pass 4-5 half-cells before being lost (LEP ~1 octant)  Expect large offsets before beam is lost  Correct over a relatively small range of BPM’s  Iterate many, many times  Hope beam goes further each time!  Needs careful thinking and experience useful! Use low intensity – of course! By the end of LEP we could do the first turn in ~1 hour. Both should be available for LHC commissioning

LHC Workshop, Jan '05P. Collier AB-OP/LHC7  LHC has 8 sectors - Each has to be matched to the beam energy 1st Turn continued  Separation/Recombination Dipoles will act like very strong correctors during the threading … must correct Transfer Function errors early.. Note: not all have been cold measured  Threading is easier with higher order multipole magnets off. (avoiding feed-down)  Cut lattice sextupoles, octupoles, spool piece octupoles, decapoles etc.  Probably leave the spool piece sextupoles powered – since we have the b 3 anyway.  Checking pickup response is best done using difference trajectories with kicks.  Can identify non-responding, polarity reversed and plane inverted BPM OK  Calibration errors less easy – do that later.  Use several correctors, both signs, both planes (both rings) to sample all cases.  Instrumentation  Can have intensity + position from each PU at the same time (for single beam)  How much use will the BLM’s be at this point??

LHC Workshop, Jan '05P. Collier AB-OP/LHC8 Getting Closure ‘ Degauss ’ Cycle Q’ h Q’ v No Correction % Dipole Correction Only using spool piece correctors Natural Q’ Only corrected using lattice sextupoles Both Corrections st turn:- Decoherence is only a few turns Turn the lattice sextupoles on and use them as a ‘knob’ – decoherence time can be used as an observable … Combined with: Continued trajectory correction to decrease the peaks and reduce losses Establishing more than a few turns also requires control over the tunes: Once we have ~10 turns measured …  Average the turns to get an ‘orbit’ – can start correcting that,  At this point get the skew quads on and powered from measurement data  Can extract from the orbit the integer tune.  If the coupling is reasonably well corrected can also extract the fractional tunes (10 turns  0.01) 80 units Q’  6 turns LHC Project Report 308 A. Verdier With a bit of luck and the wind behind us work up towards ~100 turns (Q’ corrected to ~10 units) – Ready for Capture.  Initial Commissioning of the beam dump can also happen here …

LHC Workshop, Jan '05P. Collier AB-OP/LHC9 RF Capture Step 1: Get the energy correct. Can get reasonably close using the average Horizontal offset in the arcs on the first turn trajectory…1 mm corresponds to ~7x10 -4 dB/B Step 3: Energy Matching – Later … but before any serious tuning starts Choose something to fix (dipole field, or f lhc ) [in the SPS it is the frequency] Observe 1 st turn offset – change SPS energy to centre it. Observe closed orbit offset – change either dipole field, or f lhc to correct. Usually needs iteration … Step 2: Initial Capture Get the RF ON and phase to the beam. RF will accelerate the beam onto a new orbit to match the LHC energy Observe the phase slip between RF and the beam Correct using the main field, or the frequency, f lhc. Ignoring a multitude of details! Wall current monitor

LHC Workshop, Jan '05P. Collier AB-OP/LHC10 Preliminary Commissioning (1) For this we need a captured beam – pilot bunch Step 1: Get a reasonable lifetime:  Commission Beam instrumentation- especially Q-meter (single kick) and BLM  Use these to measure and adjust Q, Q’ coupling, orbit etc.  Later need transverse profile measurements  Also, get the External beam synchronized timing working for the BPM’s. Step 2: Initial System Commissioning:  Beam dump: orbit, timing, kick and septum strength – observe trajectory in dump line  May not require MKB for initial commissioning.  Verify synchronization, establish ‘inject & dump’ operation  Commission Beam Interlock System – add inputs as they come into play Step 3: Collimation and Protection elements:  Start moving individual collimators. find beam with each jaw to calibrate the position.  Get the primaries loosely set – for single stage collimation  Close injection protection elements (TDI) again loosely set.  TCDS can also be roughly adjusted to protect the arc Step 3: Should allow us to increase the intensity of the pilot little by little – and iterate – aim for few More Intensity   More Precision

LHC Workshop, Jan '05P. Collier AB-OP/LHC11 (Examples of Bumps with Everything) Preliminary Commissioning (2) (Examples of Bumps with Everything) Systematic Kicks  Use single kicks – look at difference orbit (similar to during 1 st turn studies) both signsseveral strengths  Use each corrector, with both signs and several strengths to can check the response of all of the pickups and the correctors. Polarity and Calibration  Stay below ~1-2 mm in order to avoid non-linear fields Systematic Bumps  Use sliding 3-bump around each ring and each plane. Both +ve and –ve bumps  Start with ~1mm and increase bump until a) bad lifetime, b) beam dumped or lost.  Gives a measure of the aperture – at least any serious restrictions calibrating the individual BLM’s  Can also be used for calibrating the individual BLM’s for known localized losses  Measure Lifetime, tune, non-closure, orbit (both planes) etc. as a function of amplitude  First look at the quality of the optics. Local Coupling and sextupole polarity etc.  Powering the non-linear correctors in the bump – check the corrector polarity  Can also use bumps in the insertion regions & DS for the corrector elements there.  Including the inner triplet correctors – even though we don’t plan to use them for a while …

LHC Workshop, Jan '05P. Collier AB-OP/LHC12 Preliminary commissioning (3) Preliminary commissioning (3) Other Aspects: Alignment: Reposition mis-aligned quads based on analysis of orbit kicks.. How can we detect misaligned dipoles – unless v. bad? Feed down?? Of course any aperture bottlenecks will have to be thoroughly investigated… Two beams: Can extract extra information by commissioning both beams in parallel  Complimentary measurements – e.g. tune in each ring  Comparisons between behaviour in each ring – big kicks  Common elements – e.g. dog-legs, recombination dipoles  Can have both beams at the same time by placing the ‘collision point’ in an arc Progressive Commissioning: Progressive commissioning of beam instrumentation as the need arises for wire scanners, BCT calibration, matching monitors, etc. etc. Most of the activities will be iterative and re-visited several times as the quality of the diagnostics improve.

LHC Workshop, Jan '05P. Collier AB-OP/LHC13 Tuning-UP (1) More System Commissioning:  RF System ‘tuning’  Multiple injection synchronization & rotation systems  Longitudinal FB (may be needed for multi-bunch operation)  TFB – just commission injection damping part for the moment  Transverse profile measurements  Revisit beam dump – activate orbit FB and dump trigger  Tighten collimation and protection settings if needed for the intensity …  Injection tuning and matching of the transfer lines to LHC.  BLM’s revisit calibration and thresholds …  Other BI – e.g. PLL Q-measurements Prerequisite: Sufficient intensity for good quality measurements ~3x Initially 1 bunch, then either 1x4, or multiple injections from SPS Initially beam 1, then beam 2 then 1 & 2 non-colliding final step with correct separation in the experiments

LHC Workshop, Jan '05P. Collier AB-OP/LHC14 Tuning Up (2): Linear Optics Here we enter a measure-fest … Measurement Programme: Also Measure the dynamic aperture as a function of just about everything LEP After correction: V in red LEP : 8 knobs SC quads LHC: ~100 knobs Linear Optics Checks and correction to tighter tolerances: Examples include:  Tune ~0.001, Q’ ~2 units, |c - | < 0.01, Dispersion few cm?  Orbit < 1mm rms. Even better in specific areas. Orbit FB activated.  Beta-beating measurement – 1000-turns measurements system a la LEP  LEP ~20% - corrected  * v, for the rest we didn’t care …  But correction more difficult in LHC : many (hopefully small) sources – Insertion Quads  Analysis tools and Correction Algorithms being worked on  Phase advance,  * measurement etc.  K-modulation for PU offsets?

LHC Workshop, Jan '05P. Collier AB-OP/LHC15 Tuning Up (3) : Other Stuff Non-Linear Optics Checks and correction - Examples include (Frank)  |Q”| < ~1500 (a 2 correction using skew sextupoles to ~20%) {measure Q” + tune vs. Vertical bump amplitude}  Powering of octupole spools: global correction to 20% {minimize Q ’’, then detuning with amplitude}  Decapole spools: arc-by-arc correction to 50% (global 20%) {minimize Q ’’’, then off-momentum tuning with amplitude} ? Much of this can take place later – after initial ramp commissioning? … and probably on the normal cycle After should probably re-visit aperture checks with bumps and dynamic aperture… Don’t forget to Study reproducibility after cycling the machine b 3 spool piece checks  Use combination  bumps (to increase the signal) to check and correct b 3 spool piece powering arc-by-arc to ~10% [ Hayes, Bruning ] Tune scans  Get to know the terrain around the chosen WP Get the separation bumps on and well closed  Re-optimize and re-measure with bumps working  Get the experiments on and check compensation Might not be needed before 1 st pilot physics runs

LHC Workshop, Jan '05P. Collier AB-OP/LHC16 End Game  2 separated beams in the machine – intensities ~3x  Well adjusted beam parameters – at least on the degauss cycle  Polarity cabling, etc. checked for pickups and magnets.  Alignment checked – corrected if necessary. Physical aperture known.  Good understanding of static field errors at injection in the machine.  Correction checked for b 3 (and maybe b 4 & b 5 ) spool pieces  Optics checked and (hopefully) corrected including static beta-beating to <20%  Fully functioning beam instrumentation (at low energy)  With the specified beam intensity and bunch structure  Including Q-history measurements.  Multiple injections tried and tested.  Machine protection shaken down – sufficiently well to consider ramping.  Collimator/ protection settings sufficient for low intensity operation  Orbit feedback activated – at least in beam dump & collimation regions  Application Software thoroughly tested in anger … Exit conditions:

LHC Workshop, Jan '05P. Collier AB-OP/LHC17 What we’ve left for later … Anything to do with 25ns or 75ns operation and ‘High’ intensities  Crossing angles  RF, BI, LFB, Dump, Injection, Collimator & protection commissioning for trains and higher intensities  Transverse feedback and especially its interaction with the BI.  Beam abort gap cleaning.  Electron cloud Anything to do with the normal machine cycle ( Andy Next )  Dynamic effects - persistent currents – decay on the flat bottom  But we should have a good ‘baseline’ of the static effects.  Software, algorithms and corrections to cope with decay  Reproducibility of the machine on the nominal cycle Anything else not needed for the initial pilot physics run:  Alignment optics and measurements for inner triplets.  Inner triplet correctors  Special features for ions ( J. Jowett this aft )

LHC Workshop, Jan '05P. Collier AB-OP/LHC18 Summary Start as simple as possible  Make clear definition of where we want to get to and the path to take  Cut the bits we don’t need. Progressive commissioning of systems as needed  Revisit each system often  Attack only the things we need for the pilot physics goal  The rest can come progressively, later Fast track to complete the phase as quickly as possible  But don’t cut corners – these would come back to bite us  Thorough checks and measurements – especially polarity, aperture and beta-beating. Online Machine Protection to Assist LHC Operators Machine protection tailored to the beam/machine at each stage