DAQ Subsystem Christopher Crawford University of Kentucky Robert Grzywacz University of Tennessee April 18 2012 DoE, Germantown MD.

Slides:



Advertisements
Similar presentations
Nab DAQ + High Voltage Cage Chris Crawford Aaron Sprow.
Advertisements

The Angra Neutrino Detector Detector, VETO and electronics conceptual design Laudo Barbosa (May 18th, 2006) Centro Brasileiro de Pesquisas Físicas (CBPF)
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Development of novel R/O electronics for LAr detectors Max Hess Controller ADC Data Reduction Ethernet 10/100Mbit Host Detector typical block.
Sebastian Böser Acoustic test setup at south pole IceCube Collaboration Meeting, Berkeley, March 2005.
July 16/17, 2002 MUEGAMMA review PSI1 Slow Control.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Napoli October 2007 WG3 - Pierre Edelbruck FAZIA WG3 – Front End Electronics.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Performance of the H.E.S.S. cameras Pascal Vincent (LPNHE.
PSD upgrade: Ar-present and Xe-future 1.- Status of the PSD upgrade 2.- PSD performance after upgrade 3.- Problems during the Ar-run 4.- Future scenarios.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
Yuri Velikzhanin NuTel TV meeting, June 13 (Friday), 2003 Status of electronics for NuTel prototype.
Detectors for Light Sources Contribution to the eXtreme Data Workshop of Nicola Tartoni Diamond Light Source.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
The Nab Experiment Christopher Crawford DNP Fall Meeting, Newport Beach, CA University of Kentucky.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
PSROC, February 2, 2005 Sun Yat-San University Ching-Cheng Hsu National Taiwan University On behalf of NuTel Group Outline :  Overview of NuTel Experiment.
1 A.Tsirigotus Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch The NESTOR O.M.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
1 April 2009 NA62 DAQ meeting1 LKr calorimeter readout project H.Boterenbrood, A.Ceccucci, B.Hallgren, M.Piccini, H. Wendler.
Ge Test-stands at MPI Munich Xiang Liu 1.General 2.Crystals, Test-stands & Results 3.Outlook.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
 Digitisation P.Medina  Pre-processing I.Lazarus GTSM.Bellato GTSM.Bellato  PSA P.Desesquelle R.Gernhäuser 7 th AGATA Week, Uppsala, July 8-11, 2008.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
TPC electronics Status, Plans, Needs Marcus Larwill April
Ciemat Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas Daniel Cano-Ott, DAQ meeting in Huelva, July 18 th and 19 th A new flash.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
15-Aug-08DoE Site Review / Harvard(1) Front End Electronics for the NOvA Neutrino Detector John Oliver, Nathan Felt, Sarah Harder Long baseline neutrino.
R3B - meeting April GSI Readout concepts for the CALIFA detector options dynamic range preamplifier solution digital solution digital readout chain.
Update on the New Developments & Analysis from Hawaii Larry Ruckman & Gary Varner Instrumentation Development Laboratory (ID-Lab) University of Hawaii.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
Analog Trigger for CTA MST CTA MST Trigger & Integration Meeting Berlin, 7 November 2011 Luis A. Tejedor on behalf of GAE-UCM, IFAE & CIEMAT groups 1.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
 13 Readout Electronics A First Look 28-Jan-2004.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
PID meeting SNATS to SCATS New front end design
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Status of 100Mo based DBD experiment
Baikal-GVD (technical report)
STT Status Update Peter Wintz (FZ Jülich) for the STT group
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
F.Guber, A.Ivashkin INR, Moscow
A First Look J. Pilcher 12-Mar-2004
Possible Upgrades ToF readout Trigger Forward tracking
Conceptual design of TOF and beam test results
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Example of DAQ Trigger issues for the SoLID experiment
Commodity Flash ADC-FPGA Based Electronics for an
BESIII EMC electronics
August 19th 2013 Alexandre Camsonne
Readout electronics system for Laser TPC prototype
Presentation transcript:

DAQ Subsystem Christopher Crawford University of Kentucky Robert Grzywacz University of Tennessee April DoE, Germantown MD

Data Collection WBS Elements 1.10 Data collection systems $426k + 25% a) Detector Readout Electronics $349k + 23% b) Slow Control $ 4k + 20% c) HV System $ 73k + 36% * Covered by DOE Project funds Detector DAQ in its Faraday Cage (WBS 1.10)

WPS Detector Readout Electronics $349k + 25% Read out waveform (energy + timing) of each pixel2 x 128 ch. offline pulse shape analysis for improved resolution and PID Form e-p coincidences 50 – 750 keV prompt electron 30 keV proton (HV) delayed by 12 – 40 μs TOF Nearest neighbour coincidences for background rejection Energy and Timing Resolution 2 keV energy resolution of electron 12 bit ADC – must sum energy in adjacent pixels and opposite detector 10 ns TOF resolution of proton; 100 ps systematic 100 MHz – detection of initial proton direction in backscattered events HV Optical Isolation 30 kV potential between detectors and ground Scope:

Detector Schematic

PIXIE-16 Waveform Digitizers trigger logic

PIXIE-16 Waveform Digitizers Filter ADC FPGA

Trigger and Readout Event / Data rate < 5000/s decay rate in active volume; 600/s protons in upper detector Coincident electron in adjacent pixel (7/127), either top or bottom detector Accidentals from decay products <1% for 40 us coincidence window PIXIE-16 waveform digitizer: 100 MHz sample rate, 12 bit ADC 14 pixels * 1 us * 100 MS/s * 12 bit * 5000 /s = 11 MB/s; 12 TB / 2 weeks Trigger scheme Trigger levels: 1) DIGITIZER threshold, 2) FPGA readout, 3) CPU storage Trigger separately on protons / electrons, form coincidences in software Energy sum trigger for adjacent pixels – detection of lower-threshold events Read out 6 neighboring pixels around trigger Local trigger decisions based on hit information from other modules: main FGPA hits PXI bus trigger lines digitizer FPGA fiber optics readout rear I/O module

WPS Detector Readout Electronics $349k + 25% Design/procure/test prototype systemMar 2012-Apr 2013 Design and construct optical isolation rear I/O module convert existing CAT5 cable to fiber optic FIPPI FPGA firmware upgrades – engineers at XIA Overlapping event readout Low-threshold trigger Main FPGA (trigger) firmware upgrades – XIA Multichannel readout (lookup table) Energy summing trigger Procure remaining channels assemble and test complete systemApr 2013-Jan 2014 Work:

WBS Slow Control $4k + 20% Scope: Record operating conditions of detector - temperatures, pressures, beamline current Control movement of shutters; start/stop DAQ Work: Based on the NPDGamma slow control system - procure computer, and I/O cards - modify software developed for Nab data - test system before delivery to ORNL Schedule: Oct 2013 – May 2014

WBS HV System $73k + 36% Scope: Faraday cage for digitizers, preamp power supplies HV supply and isolation transformer for power Umbilical cord with signals, power, and cooling Work: Design support structure and shielding SNS HV safety review Build cables, testing Schedule: Jan 2014 – May 2015 * This system will be based on similar systems used in aSPECT and aCORN experiments