Water Supply Planning A Legal Overview Edward J. Casey Weston Benshoof Rochefort Rubalcava & MacCuish 333 South Hope Street, 16 th Floor Los Angeles, California.

Slides:



Advertisements
Similar presentations
Overview -- Groundwater Management in California Western States Water Council April 2004.
Advertisements

How We View and Value Water in the Bay Region Kathleen Van Velsor. Environmental Planner- Sustainable Silicon Valley Water Summit, Dec. 7 th, 2009.
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
MINING ACCESS TO WATER RESOURCES – TRADITIONS AND DEVELOPING PRINCIPLES MINING ACCESS TO WATER RESOURCES – TRADITIONS AND DEVELOPING PRINCIPLES ALEX GARDNER.
Water Marketing in Texas Ronald Kaiser, Texas A&M University May 4 th, 2001 Texas Rural Land Market Conference.
© Sheppard Mullin Richter & Hampton LLP 2014 CEQA Case Law March 19, 2014: 11:00 am to 11:45 am California Preservation Foundation University of Southern.
Main San Gabriel Basin Management BASIN REPLENISHMENT by Anthony C. Zampiello San Gabriel Valley Water Forum Presented August 28, 2012 SAN GABRIEL VALLEY.
Department of Water Resources Role in Water Transfers Jerry Johns, DWR
Community GPU Forums California Native Plant Society, Monterey Bay Chapter Carmel Valley Association Citizens for Responsible Growth Coalition to Protect.
The Compact  Legally enforceable contract among the Great Lakes States  Provided for in the U.S. Constitution  Ratification by State legislatures 
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
Planning Issues in Agriculture Laws and Regulations Lecture 6 Lecture 6.
21st Century Challenges for California Water Law Stefanie Hedlund Best Best & Krieger LLP.
Outsourcing: The Ethical Issues Steven M. Richman November 2014.
Joint Recovery Plan Update ADWR, AWBA & CAP AWBA Quarterly Meeting September 4 th, 2013.
Douglas P. Carstens Chatten-Brown & Carstens LLP, Hermosa Beach L EGAL A SPECTS OF C LIMATE C HANGE & U SING CEQA TO S UPPORT B ETTER P ROJECTS.
To San Francisco The Delta Sacramento River  Stockton San Joaquin River California Aqueduct Clifton Court Forebay California depends on fresh water from.
Southern California Water Dialogue
Bhfs.comBrownstein Hyatt Farber Schreck, LLP Who Controls the Water? Reforming California Water Law Governance in an Age of Scarcity A Success Story about.
Rodman & Renshaw Conference September 2015 This presentation contains forward-looking statements that are subject to significant risks and.
DRA Perspective on What Recycled Water Applications from Investor- Owned Utilities Should Contain and How They Should be Evaluated CPUC Water Recycling.
Monterey Peninsula Water Management District 1 Confirm Scope of Work and Description for MPWMD ASR Project Item 13 April 18, 2005 Regular Meeting Staff.
Making the Connection Between Water and Land Use Judy Corbett, Executive Director Local Government Commission Smart Growth gets Water-wise.
PROTECTING OUR WATER SUPPLIES FOR THE FUTURE ― THE LEGAL SAFEGUARDS AVAILABLE FOR THE DILIGENT CITIZEN Edward J. Casey October 14, 2006.
TWCA 2009 Mid-Year Conference Groundwater Regulation Panel.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
Technical Workshops on Monterey Peninsula Water Supply Project A July 26 & 27, 2012.
Addressing Cumulative Impacts of Pollution: A CEQA Perspective A Forum Presented by the Contra Costa County Hazardous Materials Commission December 4,
1 Arne Simonsen Chair Delta Protection Commission October 23, 2008 Governor’s Delta Vision Process E.O. S
LAFCO’s and CEQA Discussion Problem The City of San Garbanzo prepared an EIR in connection with a regional commercial project “Big Box Mall” to be located.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
UNC Modification Proposal 0229 Guidelines document.
Tracey Ferguson Project Manager, Integrated Water Resources ATKINS.
California Water Jeffrey Kightlinger, General Manager
SUSTAINABLE GROUNDWATER MANAGEMENT ACT OF 2014 Groundwater Sustainability Agency Governance Formation REGINA RUBIER WATER RESOURCES MANAGER CITY OF STOCKTON.
Water Management and Climate Change in the US- Mexico Border Region Robert Lempert Senior Scientist RAND September 27, 2008.
The Relationship Between Land Use Planning Agencies and SGMA January 26, 2016 Cross Roads of GSAs and Local Land-use Planning Agencies.
MLPA Closures 2. “Children’s Pool Beach is not the only beach located in La Jolla. There are several beaches located adjacent to or in close proximity.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
The Sustainable Groundwater Management Act and DWR’s Role in Sustainable Groundwater Management California Irrigation Institute 2016 Conference January.
San Gabriel Valley From Stormwater to Supply
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
SUMMARY GOLDEN: KEY: WAS IT AUTHORIZED? COURT’S REASONING TYING ZONING WITH SUBDIVISION LAW URBAN GROWTH BOUNDARIES THE THREE BOUNDARIES.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
CarolloTemplateWaterWave.pptx City of Bainbridge Island Water System Plan Policy Discussion April 21, 2015.
Prepared by: Alex Fisch Planning Services Division.
Folsom Water Supply Service Area for Aerojet Properties ( Aerojet-Industrial, Westborough & Easton Place/Glenborough Areas) June 26, 2007.
HAYS CALDWELL PUBLIC UTILITY AGENCY HAYS COUNTY COMMISSIONER’S COURT WORKSHOP JULY 22, 2014.
CITY OF STOCKTON CITY COUNCIL AGENDA ITEM: DATE: PROJECT: APPLICANT: PRESENTOR: AGENDA ITEM: DATE: PROJECT: APPLICANT: PRESENTOR: August 31, 2004 A proposed.
1 EIS CONTENT & USE: ROBERTSON v METHOW VALLEY CITIZENS COUNCIL (207) FACTS  CHALLENGE TO ADEQUACY OF EIS FOR FOREST SERVICE PERMITS FOR SKI RESORT ON.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
Pasadena Water and Power City of Pasadena 2015 Urban Water Management Plan Public Hearing City Council – June 13, 2016 Item 12.
A Water Manager’s Perspective: A View from the Field Jeffrey Kightlinger The Metropolitan Water District of Southern California June 2003 Jeffrey Kightlinger.
1 “Fair Argument” Test Triggering EIR: Friends of “B” Street v City of Hayward Facts & Issue Trial court: city abused discretion in adopting negative declaration.
May 14, Planning Commission Planning Commission May 14, 2015.
Top Five Reasons South Bay Needs WaterFix
Water Resource Management Planning Update
2015 Urban Water Management Plan Overview
Top Five Reasons Orange County Needs WaterFix
Top Five Reasons South Bay Needs WaterFix
Modify Approval of Conditional Use Permit #6222 and Mitigated Negative Declaration for the Arroyo Seco Canyon Project PUBLIC HEARING City Council July.
Top Five Reasons Los Angeles County Needs WaterFix
Water Resource Management Planning Update
Are Tiered Conservation Rates Valid?
Cannery Park Project Public Hearing
LAFCO AND CEQA LAFCO Role as A Responsible Agency
SUSTAINABLE GROUNDWATER MANAGEMENT ACT (SGMA)
Groundwater Rights No state permit system (No Administrative Agency)
Top Five Reasons Los Angeles County Needs WaterFix
Off Site Mitigation Measures under CEQA
Presentation transcript:

Water Supply Planning A Legal Overview Edward J. Casey Weston Benshoof Rochefort Rubalcava & MacCuish 333 South Hope Street, 16 th Floor Los Angeles, California (213) , May 18, 2004

Overview of Presentation ► Review of Case Law Leading Up To SB 610/221 ► Review SB 610/221 (Enacted in 2002) ► Review Legal Requirements for UWMPs ► Identify Open Questions

CEQA Cases Pre – 610/221 ► Not Many CEQA Cases Concerning Water Supply Pre s ► Stanislaus (1995) ► One of First CEQA Cases Dealing with Water Supply ► 25-Year, Phased Project ► Firm Water Supply Only Identified For First Phase (5 years) ► EIR Invalidated Because No Analysis of Long-Term Water Supplies

CEQA Cases Pre – 610/221 ► County of Amador (1999) ► CEQA Challenge To Water Agency’s Adoption of Long-Term Water Supply Program ► Program Planned For Additional Water Supplies To Meet Anticipated Growth In Draft General Plan ► EIR Invalidated For Lack of Analysis of Growth Impacts From Additional Water Supplies

CEQA Cases Pre – 610/221 ► Newhall Ranch – Trial Court Decision (2000) ► Three Sources of Waters – Reclaimed, Flood Flows, SWP ► SWP ► Cannot Assume Full Contractual Entitlements ► Only Evidence Before Court Was Historical Deliveries ► Flood Flows ► Inadequate Evidence Re Ability of Aquifer To Store Water ► Death Knell of “Will Serve” Letter

CEQA Cases Pre – 610/221 ► “Newhall II” (2003) ► Pre – 610/221 EIR ► Water Supply Analysis Assumes 100% SWP Entitlements During Wet Years, 50% During Dry Years ► EIR Struck Down ► Insufficient Evidence Supporting Assumptions ► Key Factor → SWP System Not Fully Built Out

CEQA Cases Pre – 610/221 ► PCL/Monterey Amendments ► “Paper Water” ► Full SWP Entitlement Is A “Hope,” ► “Actual, Reliable” Water Supply Less Than Entitlement ► Connection Between Land Use Planning and Water Supply ► Condemns Land Use Planning Based On “Paper Water” ► Worst Case Scenario ► Need To Analyze Long-Term Shortage Scenario

CEQA Cases Pre – 610/221 ► Save Our Peninsula (Monterey County ) (2001) ► Groundwater Overdraft ► Multiple Issues Need To Be Analyzed

CEQA Cases Pre – 610/221 ► Napa Citizens (2001) ► Airport Development Project ► Source of Water Identified ► EIR Still Struck Down ► Water Source Still Not Firm; Agreements Still Needed ► Not Need Guaranteed Source, But Need To Analyze Back-up Source (Worst Case Scenario)

CEQA Cases Pre – 610/221 ► Friends of Eel River (2003) ► Sonoma County Water Agency ► Proposed Project to Increase Water Diversion from Russian River ► EIR Struck Down Because No Analysis of PG&E Projects That Would Decrease Amount of Water Discharged into Russian River

CEQA Cases Pre – 610/221 ► San Joaquin Raptor (2003) ► New UC Campus at Merced ► Proposed Source of Water Was Groundwater ► Basin Near Overdraft ► EIR Upheld Based on City’s Water Supply Plan ► City’s Proposed Supply Projects Provide Sufficient Basis to Conclude No Significant Water Impacts

Lessons Learned ► Build It, and Water Will Follow ► Days Are Over ► Demonstrate Long-Term Supplies Based on Evidence ► Need To Address Worst Case Scenarios ► Drought/Loss of Supplies/Third Party Actions ► Groundwater Carries Special Problems ► Connection Between Water Supply Planning and Land Use Planning ► Not Need Guaranteed Water Supply ► Reasonable Probability/Certainty

SB 610/221 ► Essential Elements ► Demonstrate Sufficient Water Supply to Meet Project and Cumulative Demand in Normal, Single and Multi- Dry Years Over 20 Year Horizon ► List of Qualifying Projects ► 500 residential units or equivalent water demand ► Substantial Evidence Test Applies ► Projections; Not Guarantee ► Can Rely on Future Water Supplies Depending on: ► Contracts, Capital Budget, Permits, Water Rights ► Special Rules For Groundwater

Guideline Documents ► DWR’s Guidelines for SB 610/221 ► DWR’s Guidelines for Assessing State Project Water ► MWD’s Reliability Report of 2003

UWMPs ► Urban Water Management Plans ► 610/221 Both Provide That Information and Projections in UWMP May Be Used in 610/221 Reports ► UWMPs Prepared Every Five Years ► New Requirements Re Groundwater ► CLWA’s UWMP Challenged in Court ► Challenge Rejected by Trial Court ► Heavy Reliance on Substantial Evidence Test and Expert Opinion

Open Legal Questions ► Attack on Plan Documents ► UWMPs, MWD’s Reliability Report, Etc. ► When Can Rely, Or Not Rely, On Plan Documents?

Open Legal Questions ► Groundwater As Source ► Issue Is Legal Entitlement to Produce Groundwater and Third Party Impacts ► Types of Basins ► Adjudicated ► Managed But Not Adjudicated ► Neither Adjudicated Nor Managed ► Red Flag

Open Legal Questions ► Proving Likelihood of Additional Water Supply in Future ► Required to Show Permits, Plans, Contracts, Capital Budgets ► When Are Proposed Plans Sufficiently Ripe?

Open Legal Questions ► Worst Case Planning – How Much Needed? ► Existing Supplies ► Back-up Plans

Open Legal Questions ► Connection Between Land Use Planning and Water Supply Planning ► Who Does What and When?