Study of wire cutting effects on surfaces of diamond turned copper structures S. Heikkinen CERN TS/MME/MM Team meeting 18.6.2008 Motivation: Why structures.

Slides:



Advertisements
Similar presentations
TD18 – post mortem analysis Inspection 11WDSDVG1KEK SLAC.
Advertisements

COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
Unit 5 Three-View Drawings
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
18/6/2007 M.Taborelli, TS-MME Structure fabrication techniques and possibilities M.Taborelli Disk structures Quadrant structures ….most of it inspired.
Recent 30 GHz CTF2 M. Gerbaux, S. Döbert, Jan Kovermann, R. Zennaro.
CLIC RF structure master schedule and CERN production
News from structure production task force – T18_CERN G. Riddone on behalf of the task force team GR, BE/RF,
Richard F Boyce Injector UpdateL0-1 Accelerator 3 November L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC.
R&D For Accelerating Structures H. Padamsee. TESLA Niobium, one meter length, rf = 1.3 GHz Copper, 53 cm, rf = 11.4 GHz.
Samuli Heikkinen CLIC Workshop October 2007 a short summary of the doctoral thesis on the CLIC fatigue study.
Design and Plans for Introducing Flexible End Parts Steve Krave 15 October 2013.
INFLUENCE OF MACHINE FEED RATE IN WEDM OF TITANIUM Ti-6Al-4V WITH CONSTANT CURRENT (6A) USING BRASS WIRE 指導老師 : 戴子堯 碩研奈米一甲 ma31v205 蘇育儒.
Microscope Lab Do Now: Pick up lab and preread the whole lab, answer pre-lab questions when finished reading. Not before, after!
Fabrication of accelerator structures for CLIC study CLIC Workshop Oct , CERN T. Higo, KEK.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Wire EDM cutting of PCD 報告者:陳思懿 指導教授 : 戴子堯 博士. Outline INTRODUCTION Influence of PCD machining conditions Conclusions 1/10.
TD24 R05 N1 after high-power test analysis plans A. Degiovanni, M. Aicheler, N. Mouriz Irazabal, A.T. Perez Fontenla, R. Wegner CLIC RF Structure Development.
10/2007 M.Taborelli, TS-MME Structure Manufacturing, Achievements and Challenges M.Taborelli -Technology -Shape accuracy -Surface quality -Assembly accuracy.
SEMINAR ON HIGH SPEED MACHINING (HSM). CONTENTS  Introduction  Definition of HSM  Advantages  Application areas  Machining system  Some recommended.
Cornell SRF New Materials Program Nb 3 Sn Development Sam Posen and Matthias Liepe Cornell University TTC Meeting 6 December 2011 Beijing, China.
EuCARD is co-funded by the European Commission within the Framework Programme 7 under Grant Agreement no Reach of NC and SC Technologies, 50 …
Mold Texturing Trevor Thorwart Andrew Meier Josh Hoover.
Preparation of cross-section TEM specimen on sapphire substrate
Surface Treatment Issues for RF Structure Fabrication Juwen Wang SLAC National Accelerator Laboratory X-Band Accelerating Structure Review November, 2014,
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
1.3GHz Input Coupler for ILC
Electrical Methods of Material Removal Chapter 5.
老師:戴 子 堯 學生:陳 立 偉 日期: Outline INTRODUCTION THE DRY EDM PROCESS EXPERIMENTAL SETUP CONCLUSIONS 2.
CLIC Meeting 21/08/2001 G. Arnau Izquierdo EST/SM 1 W single crystal advancement. 1) Manufacturing. 2) Images after EDM. 3) Images after grinding. 3) Images.
CIEMAT contribution to PETS David Carrillo CTF3 Collaboration Meeting January 2007.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
CLIC Accelerating Structure R&D Introduction W. Wuensch X-band workshop
5/7/2007 TS_CLIC_AB M.Taborelli, TS-MME High precision machining and metrology for structures: achievements and open questions M.Taborelli.
10/2007 M.Taborelli, TS-MME M.Taborelli Structure fabrication: dimensional tolerances Contributions of : G.Arnau-Izquierdo, A.Cherif, D.Glaude, R.Leuxe,
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
Bellerophon on Pegasus S. Atieh RF structure development meeting.
Study of heat and chemical treatments effects on the surface of ultra-precision machined discs for CLIC X-band Accelerating Structure Review (24 Nov. 2014)
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
High-gradient rf constraints W. Wuensch X-band workshop
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Half cells for SCRF Cavity - shape ~ 900 mm End cellIntermediate cell.
Date of download: 6/1/2016 Copyright © ASME. All rights reserved. From: Graphene Oxide Colloidal Suspensions as Cutting Fluids for Micromachining—Part.
Fabrication of LHC cavities at CERN N. Valverde Alonso, G. Favre,T. Tardy, F. Pillon, R. Claret, S. Mastoura, E. Rigutto,J. Geisser
High Power Crab Cavity Testing Ben Woolley HG2016 Argonne National Lab. 8 th June 2016.
Results of short module and qualification strategy
INDUSTRIAL ORIENTED MINI PROJECT ON STUDY ON MANUFACTURING OF STEAM TURBINE BLADES D.Shiva Krishna 08141A0307 D.Srinivasa Rao 08141A0316 S.Madhu 08141A0312.
Project meeting , Geneva
ELECTRICAL ENERGY BASED PROCESSES
EN/MME fabrication activities and developments for CLIC
EuCARD Status: September 2010.
Condition of electron beam welding toward a high gradient application
CLIC TD26CCR1 prototype fabrication
FCC R&D WP5 Cavity Fabrication Status May 2017 M
ELLIPTICAL SCRF CAVITIES
Date of download: 11/8/2017 Copyright © ASME. All rights reserved.
Review of rf structure test results
ELECTRICAL ENERGY BASED PROCESSES
ELECTRICAL ENERGY BASED PROCESSES
Alberto DEGIOVANNI CLIC Workshop CERN
Uppsala University, WP 9.2 In-situ discharge experiments inside an Electron-microscope Field emission probe Simple scanning Cut and Slice, voids Upgrade.
Recent high-gradient testing results from the CLIC XBoxes
Diamond Substrates for High Power Density Electronics
LCLS-II High Q0 Cavities: Lessons Learned
Manufacturing Processes
Manufacturing Processes
Experimental Set-Up & Result Fabrication Process & Results
Fig. 5 SEM images of pin and disc wear tests.
Presentation transcript:

Study of wire cutting effects on surfaces of diamond turned copper structures S. Heikkinen CERN TS/MME/MM Team meeting Motivation: Why structures after CTF-3 high power test (and wire cutting) do look like this? Surfaces full of pits

A test was performed Specimen: Output coupler of high power tested 30GHz Mo iris structure Slice cut for reference before wire cutting The rest went through a similar wire cutting process as the structures. Reference slice “Before wire cut” Reference slice “Before wire cut” Test piece “After wire cut” Test piece “After wire cut” 1. Mechanical cut 2. Wire cut

Specimens on a SEM stage After wire cut Before wire cut

SEM images of the diamond turned surfaces Before wire cutAfter wire cut

SEM images of the diamond turned surfaces Before wire cutAfter wire cut

SEM images of the diamond turned surfaces Before wire cutAfter wire cut

SEM images of the diamond turned surface Region close to wire cut Wire cut Diamond turning

SEM image of the rough machined surface far away from the wire cut

Some related structures tested and inspected earlier: 30CNSD1P2.Cu, 30 GHz disc structure brazed diamond turned discs, fabricated high power tested in CTF-3, 2007 wire cut for the post mortem inspections,

Some related structures tested and inspected earlier: 30CNS2P3.Cu, 30 GHz disc structure brazed diamond turned discs, fabricated high power tested in CTF-3, 2007 wire cut for the post mortem inspections,

Some related structures tested and inspected earlier: 30 GHz disc structure brazed diamond turned discs, fabricated <2003 high power tested in CTF-2, <2003 wire cut for the post mortem inspections, 2003

Known phenomena Due to: contaminations inadequate flushing and penetration of the EDM dielectric fluid

Conclusion: Wire cutting causes pitting to the cut and adjacent surfaces Poor flushing due to cavity geometry Flushing difficult to be improved Recommended: Use other cutting techniques