14 May 2013
Aerial of Flood Insurance Rate Map (FIRM) East Fork of Fountain Creek
Aerial View of Existing Creeks
April 11, 2013 Photos looking North – Upstream
April 11, 2013 Confluence of Main Stem and East Fork of Fountain Creek South of the Confluence of Fountain Creek
Administrative Notes Bid Opening will be 3:00 PM, Thursday 30 May 2013 at City Hall Bid Bonds required Please include completed CDOT Forms 605, 606 and 621 CDOT funded project DBE & OJT Goal = zero Davis Bacon wages not required Substantial completion by 30 Sep 2013 All RFI’s should be in writing and sent via to: woodlandpark.org or woodlandpark.org Staging area – TBD and negotiated between the Contractor and property owner
Channel Fill and Reclamation Within the Easement: Per plans and specs City Engineering Specs (Title 7; Section Utility Mains – available on line) 95% Modified Proctor (ASTM D-1557) unless otherwise directed Contractor is responsible for all QC & soils testing City may do some QA testing Outside the Easement: Will require special attention See supplemental plans
Alternative Pipe Materials Proposals will be evaluated separately Decision to use alternative pipe materials will be collaboratively evaluated and approved by the City, the property owner and CDOT Must include: Recent experience with similar 72” and 84” pipe diameters Crew shall also have recent experience with large diameter pipe installations (i.e. Project Superintendent, Foreman, etc.) Provide references Provide QC plan
Trail Ridge Apartments – Grading Plan