14 May 2013. Aerial of Flood Insurance Rate Map (FIRM) East Fork of Fountain Creek.

Slides:



Advertisements
Similar presentations
Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Advertisements

Bob Smith, P.E. Region 1 Benjamin Acimovic, P.E., Region 1
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
Duane Hill, District Engineer
Welcome to the Middle Island Property Owners’ Association Conference Call Thursday, January 15, :00 PM 1 This presentation was revised after the.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Cherokee Bend Phase II, Roadway Pavement: Atoka Trail Request to Complete Roadway Pavement of Atoka Trail to Live Oak Church Road Shoal Lake Homeowners.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Recently installed spill way to restrict water flow to the lower level of Lake Terrace drive. The grate is completely covered with debris. This appears.
Board of County Commissioners 9/27/2011.  Minor Amendment to Existing Special Use Permit for Oak Hall Private School to modify conditions relating to.
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
1 Status Report on H. Ligarde Elementary School Parking Lot Facility Construction Department August 16, 2002.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
1 RMS-QCS Introduction July RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
Back Creek Floodplain SEPTEMBER 2, Why are we here Introductions Almost 300 parcels affected by revised flood study of Back Creek Outline ◦History.
Public Hearing (PH 1) City Council Meeting February 7, 2012.
Working Successfully With Property Managers: An Interactive Engagement
JUNE 19, 2012 BCC APPEAL HEARING ON BZA #SE , April 5, 2012 APPLICANT/APPELLANT: TONY RAHBANY.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
1 RMS-QCS Introduction April RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
Community Development Department Special Exceptions for: Automotive parts (e.g. accessories and tires) and Automotive, Recreational Vehicle, and Boat Dealers.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
1 RMS Training RMS BASICS April Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
April 8, 2008 BCC PUBLIC HEARING ON BZA # SE APPLICANT/APPELLANT: Fernanda Curione.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
City of Palm Coast, Florida City Council Meeting October 2, 2012.
North Olmsted City Schools Butternut Ridge Road North Olmsted, OH Michael E. Zalar, Ph.D. Superintendent Building Our Future Together North.
Community Development Department Community Development Block Grant Application and Housing Assistance Plan.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
IT’S THE 11 TH HOUR And General Engineering is … HOLDING US UP!
Public Hearing (PH 1) City Council Meeting January 17, 2012.
Bay Breeze Point “A Premier Waterfront Community” HOA Fencing Study Group January – October Phase 2 Fencing Study Group Working Papers.
Time is money. Use yours wisely. Bryan McCabe, PE | Pender County Utilities J. Ray Cox, PE | Highfill Infrastructure Engineering.
Department of Property and Procurement Division of Procurement Property & Procurement Economic Development Seminar Friday & Saturday, May 6 & 7, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
Resolution No WATERFALLS REGIONAL POND CHANGE ORDER NO. ONE WATERFALLS REGIONAL POND CHANGE ORDER NO. ONE Contract Cost: $2,969, Contract.
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
Engineering a Good Project Drew Seaman. Engineering: the work of designing and creating large structures (such as roads and bridges) or new products or.
January am.  Acknowledgment of Receipt Form, Page 3  Request for Proposals – Submittal Form, Page 4  Cost Proposal Requested from the top.
25360 Malibu Road. MALIBU LCP REQUIREMENTS FOR A FINDING Malibu LCP Local Implementation Plan Chapter 9 Page REQUIRED FINDINGS AND ANALYSIS Written.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
117th AIR REFUELING WING PRE-BID CONFERENCE W912JA-15-R-0031 Boilers W912JA-15-R-0032 Storm Drainage.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Construction Small Business
Electrical Distribution Design Services
2nd Street Drainage and Paving Improvements
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
REQUEST FOR PROPOSALS (“RFP”) CITY OF DANIA BEACH Bid No
Grant Orientation Session
State Aid Construction
Welcome to the 2015 Façade Program Meeting
Flood Plain Regulations
Grant Orientation Session
AMBASSADOR WEST – CHANGES TO APPROVED PROJECT TO RESET ENTITLEMENT TIME LIMITS (City Ventures) City Council 3/28/11.
Two Valley Trail VIRTUAL TOUR
Two Valley Trail VIRTUAL TOUR
2019 Saddlebag Creek Ranches Home Owners Association Annual Meeting
Monitoring, evaluation, adaptive management
Biltmore C Proposed Water & Sewer Improvement Project
PRE-PROPOSAL MEETING LOGAN WWTF
Item #: 3.1 Public Hearing – Vacating Lot 15 of Cherapple Farms, Plat C, and Lot 17 of Cherapple Farms, Plat E, and approving the final plat of Cherapple.
State Aid Construction
WINONA STATE UNIVERSITY
City of Austin Watershed Protection Department CIP Project design/implementation Thank you for the opportunity to show the committee what the Watershed.
Presentation transcript:

14 May 2013

Aerial of Flood Insurance Rate Map (FIRM) East Fork of Fountain Creek

Aerial View of Existing Creeks

April 11, 2013 Photos looking North – Upstream

April 11, 2013 Confluence of Main Stem and East Fork of Fountain Creek South of the Confluence of Fountain Creek

Administrative Notes Bid Opening will be 3:00 PM, Thursday 30 May 2013 at City Hall Bid Bonds required Please include completed CDOT Forms 605, 606 and 621 CDOT funded project DBE & OJT Goal = zero Davis Bacon wages not required Substantial completion by 30 Sep 2013 All RFI’s should be in writing and sent via to: woodlandpark.org or woodlandpark.org Staging area – TBD and negotiated between the Contractor and property owner

Channel Fill and Reclamation Within the Easement: Per plans and specs City Engineering Specs (Title 7; Section Utility Mains – available on line) 95% Modified Proctor (ASTM D-1557) unless otherwise directed Contractor is responsible for all QC & soils testing City may do some QA testing Outside the Easement: Will require special attention See supplemental plans

Alternative Pipe Materials Proposals will be evaluated separately Decision to use alternative pipe materials will be collaboratively evaluated and approved by the City, the property owner and CDOT Must include: Recent experience with similar 72” and 84” pipe diameters Crew shall also have recent experience with large diameter pipe installations (i.e. Project Superintendent, Foreman, etc.) Provide references Provide QC plan

Trail Ridge Apartments – Grading Plan