Introduction to Construction Dispute Resolution Feniosky Peña-Mora Gilbert W.Winslow Career Development Associate Professor of Information Technology and.

Slides:



Advertisements
Similar presentations
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Advertisements

1. Among the most important advisors to a construction firm are: –Professional surety bond producer –Knowledgeable construction/surety attorney –Construction-oriented.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
What Small and Emerging Contractors Need to Know Understanding Dispute Resolution Options in the Construction Industry © Copyright 2014 NASBP.
The ICC DISPUTE BOARD RULES DRBF 6th Annual International Conference Programme Budapest 6-7 May 2006 Presentation by Katherine González Arrocha Senior.
Training for College Panhellenics Resources: NPC Manual of Information, AFA Annual Mtg 2008 Judicial Procedures Presentation by SMU, Law & Order, NPC Judicial.
What are Carve-Outs? Carve-outs were developed to provide the opportunity to establish an improved benefit delivery system for injured workers and to encourage.
The Use of Alternative Dispute Resolution in Bankruptcy Proceedings * *Portions reprinted by permission of JAMS.
Adjunct Professor of Law, Georgetown University Law Center
Litigation and Alternatives for Settling Civil Disputes CHAPTER FIVE.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
Consumer ADR in the UK Gregory Hunt, Head of Business Relationships The Chartered Institute of Arbitrators.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
DISPUTE RESOLUTION METHODS
Construction Engineering 380 Professional Design Services Chapter 12 Appendix G.
1 Columbia River Forum Columbia River Treaty A Federal Perspective David Burpee Natural Resources Canada November 9, 2005.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
By Aidan, Lochie, Curtis. WORKPLACE DISPUTES  Negotiation: Is a method of compromising disputes within a workplace. This easygoing approach usually.
The Importance of the Qualifications Based Selection (QBS) Process
تقديم وسائل تسوية المنازعات Presentation of dispute settlement means.
Introduction to Construction Dispute Resolution Feniosky Peña-Mora Gilbert W.Winslow Career Development Associate Professor of Information Technology and.
© 2009 Pearson Education, Inc. publishing as Prentice Hall Ch. 4-1 THE LEGAL ENVIRONMENT OF BUSINESS 1 The Legal Environment of Business A Critical Thinking.
ABA Dispute Resolution Section Women in Dispute Resolution December 2014 Dispute Boards: An Introduction Deborah Bovarnick Mastin Law Office of Deborah.
C onflicts, C laims & D ispute F ramework A Study of DRB Process & Cost Savings From An Owner’s Perspective 10 th Annual DRBF Meeting & Conference - Orlando.
Introduction to Construction Dispute Resolution Feniosky Peña-Mora Gilbert W.Winslow Career Development Associate Professor of Information Technology and.
Copyright © 2005 Pearson Education Canada Inc. Business Law in Canada, 7/e, Chapter 2 Business Law in Canada, 7/e Chapter 2 The Resolution of Disputes.
Business Law with UCC Applications, 13e
Compensation events and claims Presented by Prof. Khem Dallakoti.
CPR’S DISPUTE PREVENTION INITIATIVE James P. Groton Sutherland Asbill & Brennan LLP (Retired) Member, CPR Dispute Prevention Exploratory Group.
Third Party Alternative Dispute Resolution. Alternative Dispute Resolution (ADR)?  It involves the application of theories, procedures, and skills designed.
© 2006 Prentice Hall Ch. 4-1 THE LEGAL ENVIRONMENT OF BUSINESS A Critical Thinking Approach Fourth Edition Nancy K. Kubasek Bartley A. Brennan M. Neil.
Dispute Settlement: ALTERNATIVE DISPUTE RESOLUTION Chapter 3.
Introduction to Construction Dispute Resolution Feniosky Peña-Mora Gilbert W.Winslow Career Development Associate Professor of Information Technology and.
ALTERNATE DISPUTE RESOLUTION. Types of ADR available Negotiation Mediation / Conciliation Arbitration.
CONSTRUCTION ADMINISTRATION Claims and Disputes Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.
Contractor / Engineer Conference 2010 Dispute Resolution Process Dispute Resolution Process.
Dispute Prevention The Dispute Resolution Adviser (DRA) System Colin J Wall Global Mediation Services Ltd Prague June 2013.
 Adviser – advises a client on steps to take to avoid possible legal problems.  Drafter – writes contracts and other documents for clients.  Negotiator.
Agency Construction Management :CM NOT AT-RISK
1. 2 Introductions Biography 3 Agenda What is Conflict? Role of ADR ADR Continuum Benefits of ADR Case for Mediation Case Studies ADR Institute of Ontario.
Introduction to Construction Dispute Resolution Feniosky Peña-Mora Gilbert W.Winslow Career Development Associate Professor of Information Technology and.
Resolution of Conflicts, Options under Mexican and Chinese Laws
Prepared by Kenda Murphy, LL.B - KMurphy Consulting and Mercedes Watson, B.F.A., M.A., C.Med - Thought Department Inc.
Change Orders. CO Proposals Initiated by owner or GC –Owner requests estimate for work proposed –GC CO results from changed site condition or response.
© 2005 by Thomson Delmar Learning. All Rights Reserved.1 CALIFORNIA CIVIL LITIGATION ARBITRATION AND ADR.
SETTLEMENT OF TRADE DISPUTES. 1 Procedure for dispute settlement (C4, P2, LL)
Introduction to Construction Dispute Resolution Feniosky Peña-Mora Gilbert W.Winslow Career Development Associate Professor of Information Technology and.
ARBITRATION TASK FORCE ARIASU.S Spring Conference May 2013.
CHANGES AND WHAT THEY MEAN FOR YOU 2013 EJCDC CONSTRUCTION DOCUMENT SERIES Matthew Skidmore, P.E. NC AWWA-WEA 95 TH ANNUAL CONFERENCE.
THE ADR PROCESS ~~~~~~~~~~ KEY ISSUES AND ELEMENTS PRESENTED BY: Anthony N. Palladino Associate Chief Counsel and Director FAA Office of Dispute Resolution.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
Dispute Resolution Services McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
CLOSE PROJECT OR PHASE CLOSING PROCESS GROUP PROJECT INTEGRATION MANAGEMENT.
Introduction to Construction Dispute Resolution Feniosky Peña-Mora Gilbert W.Winslow Career Development Associate Professor of Information Technology and.
© 2005 West Legal Studies in Business, a division of Thompson Learning. All Rights Reserved.1 PowerPoint Slides to Accompany The Legal, Ethical, and International.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
TILAK KOLONNE CHARTERED QUANTITY SURVEYOR, ARBITRATOR, ADJUDICATOR TEL: April 2016 CPD for SLQS OAMN Alternative.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
AN OVERVIEW OF ALTERNATIVE DISPUTE RESOLUTION (ADR) MECHANISMS BY MUENI MUTUNGA.
Managing Difficult Negotiations: Third Party Approaches
MEDIATION and other forms of ADR.
Alternative Dispute Resolution Systems
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
What Is the MASTER Programme?
Alternative Dispute Resolution
OFFICE OF DISPUTE RESOLUTION
Class Introduction We will go through the rationale behind the study of conflict prevention and resolution techniques in the construction industry, as.
Settling Disputes Chapter 4 Law Related.
ADR for Insurance Disputes in Japan
Presentation transcript:

Introduction to Construction Dispute Resolution Feniosky Peña-Mora Gilbert W.Winslow Career Development Associate Professor of Information Technology and Project Management MIT Room 1-253, Phone (617) , Fax (617) Intelligent Engineering Systems Laboratory Center for Construction and Research Education Department of Civil and Environmental Engineering Massachusetts Institute of Technology Stage 3: Standing Neutral

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 2 Definitions WHAT Neutral Third Party Providing Objective Feedback WHO Neutral Advisors, Owner/Agency Review Boards, Dispute Resolution Boards, On-Call Contractor WHY Failure of A/E to Provide Unbiased Feedback HOW Understand Participants’ Relationships and Objectives Resolve Dispute in a Timely Manner with Control Over the Outcome Assess the Different Available Options

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 3 Case Study $187 million State-of-the-art Land Level Transfer Facility in the Northeastern United States Design-build Contract but Defaulting Contractor Lump Sum Agreement with a New Design-build Contractor Representation of Site Conditions not Spelled Out in the Contract Clause for an Adjustment in Price and/or Performance Period if Differing Site Conditions Claims of New Contractor for Substantial Damages (Exceeding $50 million) Due to Inaccurate Representation of Marine Subsurface Conditions in the Preliminary Design Performed by the Defaulting Contractor Third Party Neutral Retained by the Insurance Carrier’s Counsel

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 4 Case Study: Important Issues What Services Might the Neutral Third Party Provide? What Are the Reasons for the Insurance Company’s Selection of an Independent Report? Is This Type of Analysis a Reality Check for Both Parties? Although the Recommendations Are Not Binding Among the Parties, What Effect Might They Have if the Conflict Escalates?

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 5 Outline  Neutral Advisor Owner-Agency Review Boards Dispute Review Board On-call Contractor

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 6 Neutral Advisor Mediator Jointly Pre-Selected as a Dispute Resolver Throughout the Construction Process Great Familiarity with Project Documents Assistance of Stakeholders in Reaching a Win-win Solution Intervention Even Before the Occurrence of Disputes for Consultancy Services

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 7 Neutral Architect Mediator in Post-construction Disputes in Merchant Housing Projects Jointly Selected by Developer and Home Owners Associations (HOA) The Ideal of Impartiality and Fair Dealing

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 8 Disadvantages and Risks Non Binding Advisor’s Decisions and Repercussion of Continuing Disputes on Job Performance A Neutral “Too” Familiar with the Job and Parties Uneducated or Inexperienced Neutral Advisor Neutral Advisor Becoming Partially Biased Over Time

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 9 Outline Neutral Advisor  Owner-Agency Review Boards Dispute Review Board On-call Contractor

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 10 Owner/Agency Review Boards In-house Review Boards for Public Owners, Composed of Senior Officials of the Public Agency City Dispute Review Board in New York City Functioning as a Permanent Arbitration Panel with Binding Authority Major Advantage Second Opportunity to Review with the Owner Unfavorable Decisions Made by the On-site Representative Major Disadvantage Board Biased toward the Owner

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 11 Outline Neutral Advisor Owner-Agency Review Boards  Dispute Review Board On-call Contractor

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 12 Dispute Review Board Panel of Construction Professionals with Technical Background Intervention for Dispute Prevention and Resolution Alternative of the A/E and Arbitration Panel in Conflict Resolution Selection at the Beginning of the Project by Joint Agreement Between Owner and Contractor Real Time Knowledge of Project’s Progress High Cost of Implementation: 0.5-1% of Construction Cost

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 13 CDAB (Canada) Contract Dispute Advisory Board, a DRB with Non-binding Authority CDAB Formed for a Specific Dispute Concept Inception by the Ministry of Public Works and Government Services of Canada in 1987 Three Members: Neutral Chairman, Representative of the Ministry, Representative of the Contractor/Consultant Two Combined Techniques: DRB and Executive Minitrial

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 14 CDAB DART Procedure Contractor/Consultant requests to the Minister the constitution of a CDAB to review and settle a pending claim Minister Reviews the request and determines whether it is necessary to form the CDAB Minister can negotiate a settlement with the contractor/consultant The contractor gets eight weeks to prepare and submit in writing to the Ministry copies of all documents supporting the claim The Ministry gets four weeks to review the documents and prepare its case Both parties make their respective presentations to the Board The Board reviews the information gathered at the presentations and sends a recommendation to the Minister, who them advises the contractor on his/her decision The contractor can accept the proposal by the Minister, or proceed to submit its claim to arbitration or litigation

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 15 Outline Neutral Advisor Owner-Agency Review Boards Dispute Review Board  On-call Contractor

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 16 On-call Contractor Contractor Hired by the Owner to Perform Last Minute Additional Work Orders Need for a Separate Schedule to Control New Contractor’s Activities Importance of Minimizing the Interference Between the Two Contractors Advantages Smooth Completion and Job Closeout Process Prevention of Last-Minute Disagreements Between Owner and Main Contractor

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 17 Outline Neutral Advisor Owner-Agency Review Boards Dispute Review Board On-call Contractor

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 18 Case Study Services Provided by the Third Party Neutral Review and Analysis of Geotechnical Information in Design Drawings and Commissioned Reports Comparison between Geotechnical Information Available to Bidders and Conditions Reported by Contractor Analysis of Entitlement to Additional Compensation Verification of Compensable Costs Analysis of Progress Schedule Output : Expert Report for the Findings Results Rejection of Contractor’s Claims Dispute Settlement in Subsequent Negotiations

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 19 Summary Common Denominators of Techniques Used in the Standing Neutral Stage Third Party Involvement Unbiased Decisions Knowledgeable Expert Cost,Time and Resources Savings Variations Number of Agents Involved Relationship of the Agents with the Project Stage of Involvement

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 20 Different SNT Standing Neutral Technique Neutral Advisor Owner Review Board Dispute Review Board On-Call Contractor Number of Agents 1 Multiple 1 company Relationship of the agent with the project External InternalExternal Stage in which the agents become involved From the beginning of the project When conflicts arise From the beginning of the project Towards the end of the project. Before conflicts arise

© Peña-Mora, et. al. 2002Introduction to Construction Dispute Resolution Chapter 6: Stage 3: Standing Neutral 21 References [ASCE, 1997]: Technical Committee on Contracting Practices of the Underground Technology Research Council. Avoiding and Resolving Diputes During Construction: Successful Practices and Guidelines. ASCE [Bristow, 1998]: Bristow, David. The New CCDC2: Facilitating Dispute Resolution of Construction Projects. A paper delivered to the Canadian Bar Association – Ontario. December, [Croain-Harris, 1994]: Construction industry ADR / Catherine Cronin-Harris. -- New York, NY : CPR Institute for Dispute Resolution, c1994. [ENR, 8/26/1991]: McManamy, Rob. Quiet Revolution Brews for Settling Disputes. Engineering News Record. McGraw-Hill, New York. pp August 26, [Kane, 1992]: Kane, Christopher. Mitigation Construction Contract Disputes. Public Utilities Fortnightly. Vol. 130 (1). pp July [Kemp, 1998]: Kemp, Jack, (1998). Dispute Resolution Using a Neutral Architect. Punch List Vol. 20 (4) Winter [Peña-Mora et al, 2002] : Peña-Mora, F., Sosa, C., and McCone, S. Introduction to Construction Dispute Resolution. Prentice Hall, New Jersey, 2002 [Treacy, 1995]: Treacy, Thomas B., (1995). Use of ADR in the Construction Industry. Journal of Management in Engineering Vol. 11 (1) pp January/February, [Zack a, 1997]: Zack, James G., (1997). Claims Prevention: Offense Versus Defense. AACE. Vol. 39 (7) pp July [Zack b, 1997]: Zack, James G., (1997). Resolution of Disputes: The Next Generation. AACE Transactions. pp