Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
MICE Target Report Chris Booth (for target team) Sheffield 23 rd April 2009.
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
The MICE Target Lara Howlett University of Sheffield.
Progress on Target Design Chris Booth Sheffield 2 nd August 2004.
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
Target Status Report Lara Howlett University of Sheffield.
Target Operation and Status Report Chris Booth for Target Team 20 th October 2008.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
MICE Target Development Chris Booth Sheffield 8 th June 2006.
MICE Electronics Upgrade P J Smith (University of Sheffield) J Leaver (Imperial College) 17 th June 2009.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
Extra Control Electronics? Chris Booth Sheffield 27 th November 2008.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Progress on Target Design Chris Booth Sheffield 14 th July 2004.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
P J SmithUniversity of Sheffield1 MICE Target Electronics Paul J Smith University of Sheffield Fermilab 10 th June 2006.
MICE Target Report Chris Booth (for target team) Sheffield 24 th March 2010.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
Target Test Report Given permission for a maximum of 5000 actuations. Performed 3679 actuations, 3654 with the gate valve open. Ran target at 0.4 Hz to.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
M. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Magnets Dry Run ISIS Scheduling Meeting Latest news on Target Ready to run ? Summary of: Magnets.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Commissioning needs MICO meeting 30 June 2008 MOM ( Roumen Tsenov)
14/1/20097 January 2009MICE CM23 - Harbin - Beamline Session1 MICE Beamloss Data Adam Dobbs.
DESIGN AND OPERATIONAL EXPERIENCE OF THE MICE TARGET Target Drive The linear electromagnetic drive that has been designed to meet these requirements consists.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
1 MICE TARGET STATUS 23 rd February 2007 CM17 - CERN Paul J Smith University of Sheffield.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
MICE MICE Target Mechanism CM38 – Napa Valley P J Smith on behalf of the MICE target team.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
MICE Target Development Lara Howlett University of Sheffield.
Status of Target Design Chris Booth Sheffield 28 th October 2004.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
MICE Target Installation Chris Booth & Paul Smith Sheffield 26 th July 2007.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
The Target Drive For The MICE Experiment Control and Infrastructure Optical Readout and Drive Electronics Target Drive A linear electromagnetic drive has.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Chris Booth Sheffield 29th March 2006
Target Installation Plan
P. J. Smith on behalf of the MICE target team.
MICE Target Report Video Conference 29/11/07
MICE Operations Scenario Run 1
Injectors BLM system: PS Ring installation at EYETS
Cryomodule Assembly Plan
Presentation transcript:

Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008

Chris BoothUniversity of Sheffield 2 Installed Target & Controls Assembled in R78 14 th – 16 th January. Actuator, laser monitoring system, controls racks, data acquisition (Sheffield). Switched high-current supply, stepper motor & gate-valve controls (DL). Good vacuum (3.3×10 –7 mbar). Target actuated 1000 times ok. Stepper motor & interlocks ok. Absolute target position measured w.r.t. beam pipe.

Chris BoothUniversity of Sheffield 3 Stepper motor Actuator Bellows New beam-pipe

Chris BoothUniversity of Sheffield 4 Moved to ISIS (after problems fitting beam-pipe resolved) and connected Sunday 20 th Several damaged fibres discovered. (Neither route nor protection were as had been requested.) Optics (approximately) set up. Stepper motor & interlocks checked. Target raised to magnetically levitated “hold” position & lowered several times. Operation from MICE LCR difficult without network.

Chris BoothUniversity of Sheffield 5

Chris BoothUniversity of Sheffield 6 Permission to operate (without beam) night of Thursday 31 st Gate valve controls corrected and verified. Local network used to control power supply & stepper motor from MICE LCR. (Nice GUI provided by DL!) Target actuated in raised and lowered position (700 in total). Pulses recorded on target DAQ. Operating temperature measured with ISIS cooling. (77°C at 1 Hz, 44 mm dip-depth) Problem with stepper motor “sticking” at limit switches.

Chris BoothUniversity of Sheffield 7

Chris BoothUniversity of Sheffield 8 Requirements for Full Operation Cables and signals from ISIS: synchronisation (correct polarity), local beam loss, beam current, beam position. Need to match receivers to above signals (gain, termination, timing). Network – could only operate a local network. Gate valve to be open. (Was closed after tests. May need access to check vacuum.) Understanding of problem with stepper motor control (under investigation at Daresbury). Procedure for personnel protection. (Limit switch missing.) And, of course, permission from ISIS to operate! (Meeting with ISIS last Friday.)

Chris BoothUniversity of Sheffield 9 “Demonstrator” Target ISIS requirement – we must run second target in R78 for at least 3 times as many actuations as target in ISIS. (Demonstration that dust problem solved.) Note: Should have been at RAL by now! Many technical problems – over half mechanical parts ordered via RAL & DL and produced externally were not to spec. – plus preparation was interrupted in order to operate installed target. Most parts have been recoverable, but this has meant extra machining work –Diamond-edge seals sub-standard. –Mounting holes incorrectly centred on upper & lower flanges. –Incorrect target orientation on shaft. –Magnet clamps incorrectly made. –Optics block (for second system) distorted. –…

Chris BoothUniversity of Sheffield 10 Status of Demonstrator Target Mechanics Stator wiring completed 25 th January. Seals welded at Daresbury 29 th January. Full assembly (stator, shaft, optics), plus individual optics channel alignments completed 30 th January. Electronics Control crate wired, checked (without actuator) 25 th. New PCBs (quadrature amplifiers, 24-bit timer, PS crate) from DL 29 th. (New design, not debugged, lots of problems …!) Problem with hex bridge (switched power supply) resolved Wednesday. Status Full optical alignment completed. Reliability checks completed. External shielding (HV, laser) to be fitted. Crate front panels to be fitted. 14 hour run – 50,000 pulses recorded without problem. System to come to RAL next Wednesday.

Chris BoothUniversity of Sheffield 11 Commissioning of Target (Basic minimum) Start with stepper motor raised Operate for few hundred actuations –Check synchronisation with ISIS (50/64 Hz?). –Adjust timing. –Check readout of beam-loss and ISIS current. –Set to minimum dip depth. Lower stepper motor to normal position and actuate Increase dip until see beam loss –Study stability of target and beam loss (how many pulses?) Gradually increase dip depth within allowed losses –Study correlation of loss with depth (and time?). –Other tests depend on readiness of beam monitors. –Do ISIS want a minimum number of pulses to check induced radiation? –Other tests??