LCG Introduction Kors Bos, NIKHEF, Amsterdam GDB Oct.4, 2006.

Slides:



Advertisements
Similar presentations
Exporting Raw/ESD data from Tier-0 Tier-1s Wrap-up.
Advertisements

Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
ATLAS Tier-3 in Geneva Szymon Gadomski, Uni GE at CSCS, November 2009 S. Gadomski, ”ATLAS T3 in Geneva", CSCS meeting, Nov 091 the Geneva ATLAS Tier-3.
LCG Introduction Kors Bos, NIKHEF, Amsterdam GDB Jan.10, 2007 IT Auditorium.
2012 CALENDAR. JANUARY 2012 Sunday 日 Monday 月 Tuesday 火 Wednesday 水 Thursday 木 Friday 金 Saturday 土
ATLAS computing in Geneva Szymon Gadomski, NDGF meeting, September 2009 S. Gadomski, ”ATLAS computing in Geneva", NDGF, Sept 091 the Geneva ATLAS Tier-3.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
December Pre-GDB meeting1 CCRC08-1 ATLAS’ plans and intentions Kors Bos NIKHEF, Amsterdam.
Ian M. Fisk Fermilab February 23, Global Schedule External Items ➨ gLite 3.0 is released for pre-production in mid-April ➨ gLite 3.0 is rolled onto.
WLCG ‘Weekly’ Service Report ~~~ WLCG Management Board, 22 th July 2008.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
FZU participation in the Tier0 test CERN August 3, 2006.
LHC Tier 2 Networking BOF Joe Metzger Joint Techs Vancouver 2005.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) WLCG GDB, CERN 8 July 2015.
WLCG Service Report ~~~ WLCG Management Board, 1 st September
Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team 12 th CERN-Korea.
LCG Introduction John Gordon, STFC-RAL GDB September 9 th, 2008.
NL Service Challenge Plans Kors Bos, Sander Klous, Davide Salomoni (NIKHEF) Pieter de Boer, Mark van de Sanden, Huub Stoffers, Ron Trompert, Jules Wolfrat.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
WLCG Collaboration Workshop 7 – 9 July, Imperial College, London In Collaboration With GridPP Workshop Outline, Registration, Accommodation, Social Events.
ATLAS: Heavier than Heaven? Roger Jones Lancaster University GridPP19 Ambleside 28 August 2007.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Ian Bird LCG Project Leader WLCG Collaboration Issues WLCG Collaboration Board 24 th April 2008.
LCG CCRC’08 Status WLCG Management Board November 27 th 2007
LCG Introduction John Gordon, STFC-RAL GDB May 2, 2007.
Integration of the ATLAS Tag Database with Data Management and Analysis Components Caitriana Nicholson University of Glasgow 3 rd September 2007 CHEP,
LCG Introduction John Gordon, STFC GDB December14 th 2011.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January One month per page Space to write on your.
2017 monthly calendar template
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
Plans for Service Challenge 3 Ian Bird LHCC Referees Meeting 27 th June 2005.
LCG WLCG Accounting: Update, Issues, and Plans John Gordon RAL Management Board, 19 December 2006.
LCG Service Challenges SC2 Goals Jamie Shiers, CERN-IT-GD 24 February 2005.
LCG Introduction Kors Bos, NIKHEF, Amsterdam GDB Sept
Victoria, Sept WLCG Collaboration Workshop1 ATLAS Dress Rehersals Kors Bos NIKHEF, Amsterdam.
Distributed Analysis Tutorial Dietrich Liko. Overview  Three grid flavors in ATLAS EGEE OSG Nordugrid  Distributed Analysis Activities GANGA/LCG PANDA/OSG.
Service Challenge Meeting “Review of Service Challenge 1” James Casey, IT-GD, CERN RAL, 26 January 2005.
8 August 2006MB Report on Status and Progress of SC4 activities 1 MB (Snapshot) Report on Status and Progress of SC4 activities A weekly report is gathered.
Grid Deployment Board 5 December 2007 GSSD Status Report Flavia Donno CERN/IT-GD.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
The Grid Storage System Deployment Working Group 6 th February 2007 Flavia Donno IT/GD, CERN.
LCG LHC Grid Deployment Board Regional Centers Phase II Resource Planning Service Challenges LHCC Comprehensive Review November 2004 Kors Bos, GDB.
HEPiX IPv6 Working Group David Kelsey david DOT kelsey AT stfc DOT ac DOT uk (STFC-RAL) HEPiX, Vancouver 26 Oct 2011.
WLCG November Plan for shutdown and 2009 data-taking Kors Bos.
LCG Introduction John Gordon, STFC-RAL GDB June 11 th, 2008.
LCG Introduction John Gordon, STFC-RAL GDB November 7th, 2007.
David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 LHCOPN Meeting January 2007 Many thanks to DANTE for hosting the meeting!! Thanks to everyone.
LHC high-level network architecture Erik-Jan Bos Director of Network Services SURFnet, The Netherlands T0/T1 network meeting CERN, Geneva, Switzerland;
ATLAS Computing Model Ghita Rahal CC-IN2P3 Tutorial Atlas CC, Lyon
ATLAS Computing: Experience from first data processing and analysis Workshop TYL’10.
T0-T1 Networking Meeting 16th June Meeting
Jeremy Coles, STFC-RAL GDB April 4, 2007
“A Data Movement Service for the LHC”
LCG Service Challenge: Planning and Milestones
NL Service Challenge Plans
Update on Plan for KISTI-GSDC
Status and Prospects of The LHC Experiments Computing
John Gordon, STFC-RAL GDB March 11, 2009
John Gordon, STFC-RAL GDB April 8th 2009
John Gordon, STFC GDB October 12th 2011
John Gordon, STFC-RAL GDB June 6, 2007
Thanks to everyone for attending!!
Teacher name August phone: Enter text here.
IPv6 update Duncan Rand Imperial College London
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

LCG Introduction Kors Bos, NIKHEF, Amsterdam GDB Oct.4, 2006

LCG 2 From the last meeting Minutes of the Sept. meeting at the GDB wiki page – –Comments ? –Thank you Jeremy Coles !! Minutes, Summary and Actions now also on GDB wiki – Actions from Sept meeting: –

LCG 3 Changes and apologies Estonia will join as a CMS Tier-2 site –Mario Kadastik will be at the November GDB meeting Apologies received –Richard Gokieli (Poland) –Roger Jones (UK) –Ruth Pordes (US)

LCG 4 Oct Aud. –Problem with eIRG meeting in Helsinki on Oct.4-5 Nov –Note unusual place: only phone, no vrvs –Possibly pre-GDB meeting on Nov.7 on Storage Classes again Dec IT Aud. Dates for 2006

LCG 5 Oct.18FTS Admin Day at SARA, Amsterdam –Please sign up Oct.24C-RRB meeting at CERN –Closed meeting I don’t claim this to be the full list ! Other Dates for September 2006

LCG 6 GDB meetings in 2007 To avoid confusion in 2007, the GDB is always on the first Wednesday of the month January 10 February 7 March 7 April 4 in Prague May 2 June 6 July 4 August 1 (probably not) August 31 in Vancouver September 5 October 3 November 7 December 5 The CERN IT Auditorium has been reserved those days Decide before the end of 2006

LCG 7 GDB in 2007 Hi Kors, I forgot that I was supposed to contact you about having a GDB meeting at TRIUMF in association with CHEP'07. In talking to Randy Sobie, we thought the following would be good: -- Friday, Aug.31: GDB at TRIUMF -- Saturday/Sunday, Sept. 1-2: LCG (Tier-2) meeting in Victoria -- Sept.3-7: CHEP'07 in Victoria This would mean that people would have to fly in to Vancouver on Thursday. We can arrange for a bus from TRIUMF to the airport after the meeting on Friday so people can get to Victoria easily (30 minute flight). Alternately, we could have the bus drive everyone to Victoria via the ferry, which would be much more scenic. Let me know if this works; we can work out the details later. Cheers, Mike Vetterli

LCG 8 Again and again and again … CERN migration to SLC4 Change to SL4 64-bits needs a new version of VDT Distribution still expected “in October”? 31 st of October? Some LXPLUS and BATCH nodes already on SL4 SLC4 full rollout at CERN still “in the autumn” ? Well planned transition period: –When do the sites change over ? –When do the LHC experiments change over ? –When do we stop the WLCG support for the SL3 version ? –May have different timing for EGEE …

LCG 9 Super Computing 2006 SC06 is in Tampa, Florida Nov – There is a first time EGEE booth CERN participates with CalTech Participating: UK (RAL), FNAL/SLAC, ANL, CalTech/CERN, NL(SARA/NIKHEF), FZK, NDGF(?), EGEE, OSG. Alice/ROOT, who else? New WLCG flyer in the make! WLCG poster?, EGEE poster(s)? IC demo based on Google Earth! Network demo? Mona Lisa? LHCOPN flyer or poster? Shall we set up a mailing list?

LCG 10 Big Files Small files are –Takes more time to transfer (tcp/ip protocol) –Takes more time&space to store, specially on tape –Takes more time&effort to retrieve from tape –You get too many of them … Bigger files are –More appropriate for raw data transfer & storage T0-T1 raw data data distribution –Useful for dataset definition: grouping of files All ESD data belonging to one luminosity record (Atlas) and ESD data goes to all Tier-1’s but also to many Tier-2’s But bigger files are also –More difficult to copy into your (AFS) home directory.. Quota! –More difficult to copy onto your laptop What are the limiting factors? Applications?

LCG 11 Maximum Files sizes File sizes mostly limited to 1 or max 2 GB Reactions to my suggest larger is possible –May be as big as a tape: 200 GB now –May span several tapes: 1TB Not 50 GB yet: ‘leaves too much dead wood’ Increases with increased disk sizes, i.e. time Preferred seems now 10 GB May grow to 50 GB beyond 2010 Is there a plan?

LCG 12 Network test suite OPN will be described by David Foster this afternoon –We know the T0-T1 network and rates quite well –We know the T1-T1 network and rates also well –We know less well the T1-T2 network and rates Design a plan to test T1-T2 connections –E2e routing and bandwidth measurement –The same tool to be used at each site Compare measured bandwidth with requirement Develop a test suite –based of iperf ? –Launched as part of SAM Advice on a solution if there is a problem Action on Don Petravnick, KB, Bruno Hoefft Any help or suggestion much appreciated

LCG 13 Fail-over solutions At least one Tier-1 site is down almost all the time After repair has to take in raw data at twice the rate –Not the best condition to try a new fix If a 10% T1 is down the others could also take 1% more –Assuming there are 11 T1s and they are all equal Requires a ‘democratic’ raw data distribution –True for all experiments? Who distributes the raw data? Experiments or CERN? Relaxes hardware purchases –10% overcapacity OK but factor 2 is ‘expensive’ Rebalancing done at the end of the year

LCG End of Introduction Kors Bos, NIKHEF, Amsterdam GDB Oct.4, 2006