DOE Program Review 5/17/06 A. Bross Muon Accelerator R&D DOE Program Review May 17, 2006 A. Bross.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Beam Test of a High-Pressure GH 2 -Filled RF Cavity (for efficient muon beam cooling for a MC or NF, since the low-Z ionization energy-loss absorber and.
DOE HEP Review May Office of Science Challenges of Normal Conducting RF cavities for a Muon Collider Derun Li On behalf of the US Muon Accelerator.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002.
2/7/2002 RolMUCOOL/MICE1 20b. Gaseous Energy Absorber, 21a. High Pressure RF Cavities New Money for New Approaches DOE Small Business Innovation Research.
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
MUTAC Review 3/16/06 A. Bross MuCool Overview and Plans Muon Cooling R&D MUTAC Review March 16, 2006 A. Bross.
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
MuCool Test Area RF Workshop 111/15/2010 Muons, Inc. Loaded Pillbox Cavity Milorad Popovic & Katheryn Decker French (with Mike, Chuck, Katsuya, Al and.
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
-Factory Front End Phase Rotation Optimization David Neuffer Fermilab Muons, Inc.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
FFAG Workshopfermilab April 2005 f Summary: FFAG WORKSHOP nonscaling electron model muon FFAGs C. Johnstone Fermilab.
MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011   1.Motivation & OverviewSteve Geer 2.Accelerator R&DVladimir.
1 Alan Bross MUTAC April 9, 2008 MuCool Program Overview Muon Cooling R&D Alan Bross.
The Neutrino Factory and Muon Collider Collaboration R&D Program and Participation in the IDS.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MUCOOL RF Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 18, 2007.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
A. Bross MUTAC Meeting BNL April MuCool Overview Muon Cooling R&D Alan Bross.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
Source Group Bethan Dorman Paul Morris Laura Carroll Anthony Green Miriam Dowle Christopher Beach Sazlin Abdul Ghani Nicholas Torr.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Steve Geer OsC RAL 21 June, Muon Accelerator Program MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S.  
MICE : the Muon Ionization Cooling Experiment M. Yoshida (Osaka Univ.) for the MICE Collaboration Osaka - Overview and Status -
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
805 MHz Status IIT NFMCC Meeting March 12-15, 2006 A. Moretti March 12, 2006.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Topical workshop on The Neutrino Factory and Muon Collider Oct 2007 RF Systems for a Neutrino Factory Rebecca Seviour Cockcroft Institute Lancaster University.
Non-scaling FFAGs in UK EMMA Requirement for (at least) one non-scaling FFAG clear: - multi-resonance crossings - huge/tiny momentum compaction - asynchronous.
RF studies at Fermilab MuCool Test Area Fermilab MuCool Test Area MuCool Test Area (MTA) at Fermilab is a dedicated facility at the end of the LINAC built.
Recent progress of RF cavity study at Mucool Test Area Katsuya Yonehara APC, Fermilab 1.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
MICE: The International Muon Ionisation Cooling Experiment MOPLT106 Abstract The provision of intense stored muon beams would allow the properties of neutrinos.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
NFMCC Meeting 3/12/06 A. Bross MuCool Overview Muon Cooling R&D NFMCC Meeting March 12, 2006 A. Bross.
Harold G. Kirk Brookhaven National Laboratory Report from the NFMCC MUTAC REVIEW Lawrence Berkeley National Laboratory April 8, 2008.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
NFMCC Meeting 3/12/06 A. Bross LiH Absorbers Muon Cooling R&D NFMCC Meeting March 12, 2006 A. Bross.
A. Bross MICE CM17 February MuCool RF Program 805 and 201 MHz Studies.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
MICE RF review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MUTAC 04 - April A. Bross MuCool Overview and Plans Muon Cooling R&D MUTAC 04 A. Bross.
Progress of high pressure hydrogen gas filled RF cavity K. Yonehara APC, Fermilab 11/02/111 Joint MAP & High Gradient RF Workshop, K. Yonehara.
Katsuya Yonehara Accelerator Physics Center, Fermilab On behalf of the Muon Accelerator Program 5/22/121International Particle Accelerator Conference,
August 8, 2007 AAC'07 K. Yonehara 1 Cooling simulations for Muon Collider and 6DMANX Katsuya Yonehara Fermilab APC MCTF.
Muons, Inc. Feb Yonehara-AAC AAC Meeting Design of the MANX experiment Katsuya Yonehara Fermilab APC February 4, 2009.
Research and development toward a future Muon Collider Katsuya Yonehara Accelerator Physics Center, Fermilab On behalf of Muon Accelerator Program Draft.
RF R&D (Issues) for Muon Ionization Cooling Channels
UK Neutrino Factory Conceptual Design
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
Design of the MANX experiment
Presentation transcript:

DOE Program Review 5/17/06 A. Bross Muon Accelerator R&D DOE Program Review May 17, 2006 A. Bross

DOE Program Review 5/17/06 A. Bross Muon Accelerator R&D  Our activities focus on studying the accelerator physics of a Neutrino Factory and Muon Collider and developing the accelerator technologies that are required to make these facilities a reality  This work is being conducted within the Framework of the US Neutrino Factory and Muon Collider Collaboration (NFMCC) and consists of u Design and Simulation s Includes participation in international studies such as the International Scoping Study for a Future Neutrino Factory and Super-Beam Facility (ISS) u MuCool u RAL u Targetry – CERN  Approximately 7 FTE physicist effort

DOE Program Review 5/17/06 A. Bross Design and Simulation C. Johnstone, D. Neuffer, K. Paul, S. Poklonskiy K. Yonehara

DOE Program Review 5/17/06 A. Bross Overview The International Scoping study of a Future Neutrino Factory and super-beam facility Neutrino Factory Muon Collider FS2A Concept

DOE Program Review 5/17/06 A. Bross Design and Simulation - Some Specific Areas of Study Cool here  Capture/Bunch/Rotation/Cool  Time  Energy Two fixed point acceleration: half synchrotron oscillation + path between fixed points Linear nonscaling FFAG H 2 filled cavities

DOE Program Review 5/17/06 A. Bross  Capture/Bunch/Rot/Cool Transverse emittance Acceptance (per 24GeV p)  Change pressure to 150Atm  Rf voltage to 24 MV/m  Transverse rms emittance cools to ~0.008m  Acceptance ~0.22  /p at ε T < 0.03m  ~0.12  /p at ε T < 0.015m  About equal to Study 2B

DOE Program Review 5/17/06 A. Bross Cooling simulation results 0 0.4m-0.4m 0.4m 0.5GeV -50m50m

DOE Program Review 5/17/06 A. Bross Electron Model (EMMA) Host: Daresbury Laboratory U.K. downstream of their 8-35 MeV Energy Recovery Linac Prototype (ERLP) of the 4th Generation Light Source (4GLS Unprecedented momentum compaction Asynchronous gutter acceleration Resonance Crossing Evolution of phase space Validate concept for muon acceleration Injection reference orbit Extraction reference orbit Proton Model (PAMILA) Provisional Patent: Fermilab Host: Oxford University, U.K. Tune-stabilized Nonscaling FFAG with no nonlinear fields Strong + weak focusing machine Applications Carbon therapy Proton driver Injection reference orbit FFAG Studies

DOE Program Review 5/17/06 A. Bross MuCool A. Bross, S. Geer, A. Moretti, B. Norris, Z. Qian

DOE Program Review 5/17/06 A. Bross MuCool Program  Currently consists of 9 institutions from the US and Japan RF Development ANL Fermilab IIT JLAB LBNL Mississippi Absorber R&D Fermilab IIT KEK NIU Mississippi Osaka Solenoids LBNL Mississippi  Mission u Design, prototype and test all cooling channel components (SFOFO) u 201 MHz RF Cavities, absorbers, SC solenoids u Support MICE (cooling demonstration experiment) u Perform high beam-power engineering test of cooling section components

DOE Program Review 5/17/06 A. Bross  R&D Focus of MuCool u Component testing Fermilab s RF Cavities –High RF-power Testing s Absorbers –Technology tests –High power-load testing With beam s Magnets

DOE Program Review 5/17/06 A. Bross MuCool Test Area  Facility to test all components of cooling channel (not a test of ionization cooling) u At high beam power s Designed to accommodate full Linac Beam s 1.6 X Hz – 2.4 X p/s –  600 W into 35 cm LH MeV u RF power from Linac (201 and 805 MHz test stands) s Waveguides pipe power to MTA

DOE Program Review 5/17/06 A. Bross MTA Hall

DOE Program Review 5/17/06 A. Bross MTA  The MTA is the focus of our Activities u RF testing (805 and 201 MHz) u High pressure H 2 gas- filled RF u LH 2 Absorber tests  Two parts of infrastructure yet to be completed u Cryo Plant u Beam Line

DOE Program Review 5/17/06 A. Bross Phase I of RF Cavity Closed Cell Magnetic Field Studies (805 MHz)  Data seem to follow universal curve u Max stable gradient degrades quickly with B field  Sparking limits max gradient  Copper surfaces the problem Gradient in MV/m Peak Magnetic Field in T at the Window

DOE Program Review 5/17/06 A. Bross Phase II of 805 MHz studies  Study breakdown and dark current characteristics as function of gradient and applied B field in Pillbox cavity u Curved Be window Test s TiN coated s Cavity has been conditioned to 32MV/m without B field s Measurements at 2.5T –So Far – stable gradient limited to about 14MV/m u Button test s Evaluate various materials and coatings s Quick Change over

DOE Program Review 5/17/06 A. Bross RF R&D – 201 MHz Cavity Design  The 201 MHz Cavity is now operating u Recently reached 16MV/m at B=0 (design gradient!)

DOE Program Review 5/17/06 A. Bross High Pressure H 2 Filled Cavity Work Muon’s Inc  High Pressure Test Cell  Study breakdown properties of materials in H 2  Just finished run in B field  No degradation in M.S.G. up to  3.5T

DOE Program Review 5/17/06 A. Bross  2D Transverse Cooling and  Figure of merit: M=L R dE  /ds M 2 (4D cooling) for different absorbers Absorber Design Issues H 2 is clearly Best - Neglecting Engineering Issues Windows, Safety

DOE Program Review 5/17/06 A. Bross Convective Absorber Activities  First Round of studies of the KEK absorber performed in the MTA u GHe used to input power

DOE Program Review 5/17/06 A. Bross Convective Absorber Activities II

DOE Program Review 5/17/06 A. Bross Convective Absorber Activities III  Next Round of tests will use a modified absorber  Test u Electrical Heater u New Temperature sensors u LH liquid level sensor Absorber Body being modified in Lab 6 at Fermilab Instrumentation will be used in MICE

DOE Program Review 5/17/06 A. Bross LiH Test Program  Produce encapsulating cast (not pressed) samples u Small disk (5-10 cm) for intense radiation exposure s Look at Material stability primarily s Temperature Profile u Large disk (30 cm) for detailed thermal conductivity studies s External Cooling + Internal Heating s Potential absorber for MICE Phase I –Non-instrumented, no cooling

DOE Program Review 5/17/06 A. Bross MICE A. Bross, M. Ellis, S. Geer, A. Moretti, D. Neuffer, M. Popovic, R. Rucinski

DOE Program Review 5/17/06 A. Bross Muon Ionization Cooling Experiment MICE Focus Coils Coupling Coils Liquid Hydrogen Absorbers RF Cavities Tracking Spectrometers Matching Coils Beam Diffuser Radiation shield Magnetic shield

DOE Program Review 5/17/06 A. Bross MICE – Precision Emittance Measurement  Expect 10% cooling (input 6π mm rad beam).  Wish to measure this change to ~ 1%.  Require measurement of emittance of beams into and out of cooling channel to 0.1%!  Cannot be done with conventional beam monitoring devices.  Instead, perform a single particle experiment: u High precision measurement of each track (position, momentum, time, energy). u Build up a virtual bunch offline. u Analyse effect of cooling channel on many different bunches. u Study cooling channel parameters over a range of initial beam momentum and emittance.  Presence of X-rays and electrons from RF cavities and safety issues relating to operation of LH 2 absorbers affects specification of tracker.  Solution chosen – Scintillating Fibres readout with VLPCs.

DOE Program Review 5/17/06 A. Bross Fermilab MICE Responsibilities  Scintillating Fibre Tracker: u Fibre Mirroring u Ribbon fabrication u Connector polishing  VLPC readout system: u VLPC cassettes u Cryostats (4) u AFEIIt u VLSB  Software: u G4MICE u DAQ / Controls and Monitoring u Tracker Quality Assurance

DOE Program Review 5/17/06 A. Bross MuCool and MICE  Muon Ionization Cooling Experiment (MICE) u Demonstration of “Study II” cooling channel concept s Has Phase I UK funding ($20M)  MuCool Collaboration interface to MICE u Design Optimization/develop of Study II cooling channel s Simulations u Detailed engineering s Full component design s Systems integration s Safety u RF cavity development, fabrication, and test u Absorber development, fabrication, and test u Development of beam line instrumentation u MuCool will prototype and test cooling hardware including MICE pieces for which the collaboration is responsible  Fermilab is also contributing to the cryogenics and readout electronics for the two fiber trackers used in the spectrometers.

DOE Program Review 5/17/06 A. Bross MERIT N. Mokhov, S. Striganov

DOE Program Review 5/17/06 A. Bross MERIT –Mercury Intense Target  Test of Hg-Jet target in magnetic field (15T)  Submitted to CERN April, 2004 (approved April 2005)  Located in TT2A tunnel to ISR, in nTOF beam line  First beam ∼ April, 2007  50 Hz operation at 2.2 GeV  4 MW

DOE Program Review 5/17/06 A. Bross Fermilab Contribution to MERIT  Developed Full Mars Simulation u Particle fluxes, energy deposition, absorbed dose and residual activity in the experimental hall u Absorbed dose and activation of mercury system u Secondary particle production  Study/define diagnostics needed for experiment u Radiation load in components u Radiation shielding u Particle production in secondary beam

DOE Program Review 5/17/06 A. Bross Plans for the Remainder of the Year  Design and Simulation u Continue with participation in the International Scoping Study (NF) u NF Front-end detailed simulation  MuCool u After a long pause due to the loss of our 805 MHz RF test facility in Lab G at Fermilab, we are now up and running again s 805 MHz RF studies (with and without B field) –Be Window tests –Materials tests –Surface treatment s 201 MHz RF test program off to a Rousing start! –B field tests –Curved Be Windows u Second round of tests with KEK LH 2 convective absorber u Prototype and test encapsulated LiH absorbers RF Highest Priority!

DOE Program Review 5/17/06 A. Bross Plans for the Remainder of the Year II  MICE u Need to have trackers ready to commission at Rutherford Lab in April u Purchase fibre and perform mirroring. u Produce ribbons (3 trackers = 45 ribbons ~ 70k fibres). u Produce and commission 2-cassette cryostats.  MERIT u Mars Simulations s Calculate radiation levels in secondary tunnels in order to determine the survivability of electronics s Develop final plan for instrumentation to measure particle fluxes –Scintillation Counters –Cerenkov