Nason Creek Salmon Habitat Conditions* Development, and road building have affected riparian (streamside) habitat, large woody debris and gravel recruitment.

Slides:



Advertisements
Similar presentations
Kevin L. Hoover Waters Edge Hydrology, Inc. – Wetland Conservation Approaches.
Advertisements

Implement the Grande Ronde Model Watershed Program Administration and Habitat Restoration Projects Project Lyle Kuchenbecker, Project Planner.
Confederated Tribes of the Umatilla Indian Reservation Umatilla River Basin Anadromous Fish Habitat Enhancement Project Project No Presented.
Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Lolo Creek Watershed Project #
Implement Actions to Reduce Water Temperatures in the Teanaway Basin BPA FY 2002 Columbia Plateau Province Proposal Project ID #
Project Introduction Consists of 1,760 deeded acres timber, sagebrush, and wet/dry meadow habitats. Includes Big, Lake, and McCoy Creeks.
Restore and Protect Red River Watershed Nez Perce Tribe Fisheries Watershed Program.
LOWER SALMON RIVER Tributary Protection and Enhancement.
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Upper Toppenish Watershed Restoration Project ( ) Yakama Nation Division of Natural Resources.
PINE HOLLOW WATERSHED ENHANCEMENT PROJECT Sherman County Soil & Water Conservation District.
Restoration of Columbia River Floodplain Functions to Steigerwald Lake
Grazing Management for Healthy Riparian Areas Authors: Gene Surber, MSU Extension Natural Resources Specialist Bob Ehrhart, Research Specialist, RWRP,
Stream Corridors Christine Hall Natural Resources Conservation Service North Jersey RC&D Slides 1-12.
Alabama Best Management Practices for Forestry Alabama’s Best Management Practices for Forestry “… are voluntary guidelines to help maintain and protect.
2010 Squak Valley Park Restoration Project City of Issaquah.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Natural Riparian Resources Vegetation Landscape/Soil Water.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
EEP Watershed Planning Overview August 12, Ecosystem Enhancement Program Nationally recognized, innovative, non-regulatory program formed in July.
Department of Forestry 2004 Stream Habitat Restoration Guidelines
Range Practices 1 Objectives and Range Practices under FRPA & Objectives & Objectives The Focus is on Results.
Most Common Conservation Practices Forestry Illinois.
A Review of Stream Restoration Techniques and a Hierarchical Strategy for Prioritizing Restoration in Pacific Northwest Watersheds North American Journal.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Bank Stabilization Streambank or channel.
Clackamas River Basin Council Lower Columbia River Conservation and Recovery Plan Implementer’s Perspective August 19, 2013.
S e s s i o n 5 Managing riparian land for terrestrial wildlife.
Comprehensive Planning for Lake and Stream Protection Brie Begiebing Water Resources Specialist Portland Water District.
Project Activity: Riparian Zone Restoration Scott Compton, Watershed Program Manager Valles Caldera National Preserve.
Taking the Next Step: Implementing the TMDL. What IDEM Provides to Help With Implementation  Compiling all the data in one place  Data-driven recommendations.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
SFS Best Practices Presentation Key “Best Practice” Drivers for the Crop Sector 1.Reduce Nutrient, Sediment and Herbicide Runoff 1.Riparian buffer strips,
RUTHERFORD SOIL AND WATER CONSERVATION DISTRICT CLEAN WATER MANAGEMENT TRUST FUND GRANT Travis Ringo, Rutherford SWCD.
How do humans affect watersheds and the hydrologic cycle ?
1 Questions Addressed What are the options for reducing pollutant inputs to Lake Tahoe? Pollutant Reduction Opportunities.
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Indiana’s Coastal Nonpoint Pollution Control Program Coastal Advisory Board Meeting April 18, 2007.
City of Bellingham Habitat Restoration Master Plan TAG Meeting December 5, 2012 ESA | VEDA Environmental | Northwest Ecological Services.
Understanding Creeks, Rivers, and Riparian Areas.
Price Creek Watershed Project A joint project of the Iowa & Benton County Soil and Water Conservation Districts IOWATER Meeting – November 13, 2007.
Importance of the Lower Wenatchee River in Salmon Recovery* The Lower Wenatchee is a critical migration corridor for all ESA listed species Of the total.
Coos Watershed Association Watershed Restoration Projects.
Conceptual Modeling as a Tool for Developing a Watershed Management Plan An aid to understanding linkages Barbara Washburn California Watershed Assessment.
Main Creek Water Quality Report Sandy Wingert UDWQ PRWC October 8,
CENTRAL MUSCATATUCK WATERSHED. BMPs Cost-Shared by Central Muscatatuck Watershed Project.
Riparian Areas: Functions and Conditions Authors: Gene Surber, MSU Extension Natural Resources Specialist Bob Ehrhart, Research Specialist, RWRP, Univ.
Additional Primary Headwater Habitat Stream Parameters.
Habitat Mapping of High Level Indicators at Multiple Scales for Fish and Wildlife.
Strategies Under Consideration. Three Types of Strategies Planning and Regulatory Capital Projects Programmatic Efforts.
Iowa BMPs for soil erosion prevention. BMP context BMPs needed for managed land (duh!) Strategies differ by land- use – Ag/crops (>71%) +/- CRP, etc –
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Design and Implementation of Large Wood Structures at Twelvemile Creek Prince of Wales Island Tongass National Forest The Nature Conservancy TEAMS Enterprise.
Observations and Ideas for Payment for Ecosystem Services in Central Asia.
Fish and Watershed Restoration Efforts in the Ninemile Drainage: Potential, Progress, and Opportunity Clark Fork R.
Department of Forestry 2004 Stream Habitat Restoration Guidelines
Where critical areas & agriculture meet
A Review of Stream Restoration Techniques and a Hierarchical Strategy for Prioritizing Restoration in Pacific Northwest Watersheds North American Journal.
Hydrosphere Notes Part 9-Land Use.
Thorp Mill Ditch Assessment ( )
Challenges Facing Riparian Ecosystems
Strategies to Reduce P Loading and Sedimentation on Forestry Operations in Vermont First few slides will provide some background information on what we.
Kootenai River Habitat Restoration Project 2017 Update
Presentation transcript:

Nason Creek Salmon Habitat Conditions* Development, and road building have affected riparian (streamside) habitat, large woody debris and gravel recruitment (trees and rocks), and limit channel movement. Water temperatures may limit salmon recovery (Lower Nason Creek is on State 303(d) list for water temperature). *Paraphrased from the Upper Columbia Salmon Recovery Board’s Biological Strategy (22 May 2003)

Salmon Recovery In Nason Creek* Enhance Riparian Habitat: Improve riparian habitat using native riparian vegetation Reduce road density Install livestock exclusion fencing and upland watering stations Protect Riparian Habitat: Condition development to be consistent with state or local regulations or permits Prohibit sand and gravel removal in inappropriate areas Avoid or mitigate impacts of upland development where it could impact channel conditions Establish and protect riparian buffers using regulatory and incentive mechanisms Acquire priority riparian areas through: –purchase; –conservation easements; and/or; –transfer/purchase of timber, farm, grazing or land development rights Provide incentives and compensation to landowners to retain buffers. Continue public information and outreach efforts to educate and inform citizens *Paraphrased from the Upper Columbia Salmon Recovery Board’s Biological Strategy (22 May 2003)

Salmon Recovery In Nason Creek* Enhance Channel Movement: Increase stream sinuosity and decrease entrenchment (meander reconstruction) Add LWD in the form of rootwads, log jams, and similar structures that mimic natural formations Decommission, modify, or relocate roads, low- priority dikes, bridges and culverts Protect Channel Movement: Uphold existing land use and instream work regulations that limit riparian area, floodplain and wetland development Educate the public on the importance of stream channel movement Allow stream channels to develop and flood naturally Manage stormwater runoff from existing and new development and road construction using detention, treatment and infiltration measures *Paraphrased from the Upper Columbia Salmon Recovery Board’s Biological Strategy (22 May 2003)

Salmon Recovery In Nason Creek* Water temperatures may limit salmon recovery. Establish and protect riparian buffers Implement Total Maximum Daily Loads that address temperature Restore river features such as pool-riffle sequences, meander bends, backwaters, and side Fence livestock out of riparian areas; Manage stormwater runoff from existing and new roads and developments using appropriate measures Decrease the stream width-to-depth ratio Decommission, modify, or relocate roads, low- priority dikes, bridges and culverts Improve upland water infiltration through road decommissioning, reduced soil compaction, direct seeding activities, increasing native vegetation cover, CRP participation, etc. Enhance the extent and function of wetlands and wet meadows. Enhance spring inputs to streams Improve natural stream form and function. *Paraphrased from the Upper Columbia Salmon Recovery Board’s Biological Strategy (22 May 2003)