Status Report on the Validation Framework S. Banerjee, D. Elvira, H. Wenzel, J. Yarba Fermilab 15th Geant4 Collaboration Workshop 10/06/2010 1.

Slides:



Advertisements
Similar presentations
EHarmony in Cloud Subtitle Brian Ko. eHarmony Online subscription-based matchmaking service Available in United States, Canada, Australia and United Kingdom.
Advertisements

The Geant4 physics validation repository
Presented by Mina Haratiannezhadi 1.  publishing, editing and modifying content  maintenance  central interface  manage workflows 2.
A content management system (CMS) is a computer program that allows publishing, editing and modifying content on a web site as well as maintenance from.
ACAT 2008 Erice, Sicily WebDat: Bridging the Gap between Unstructured and Structured Data Jerzy M. Nogiec, Kelley Trombly-Freytag, Ruben Carcagno Fermilab,
Minerva Infrastructure Meeting – October 04, 2011.
The SAM-Grid Fabric Services Gabriele Garzoglio (for the SAM-Grid team) Computing Division Fermilab.
Thomas Finnern Evaluation of a new Grid Engine Monitoring and Reporting Setup.
Overview of SQL Server Alka Arora.
Summary of Parallel Session 3A : Hadronic Validation J. Yarba Fermilab 17th Geant4 Collaboration Workshop 9/14/
Global Customer Partnership Council Forum | 2008 | November 18 1IBM - GCPC MeetingIBM - GCPC Meeting IBM Lotus® Sametime® Meeting Server Deployment and.
Rsv-control Marco Mambelli – Site Coordination meeting October 1, 2009.
AUTOBUILD Build and Deployment Automation Solution.
Terry Henry IS System Manager, SharePoint SME Micron Technology Inc.
03/27/2003CHEP20031 Remote Operation of a Monte Carlo Production Farm Using Globus Dirk Hufnagel, Teela Pulliam, Thomas Allmendinger, Klaus Honscheid (Ohio.
HPS Online Software Discussion Jeremy McCormick, SLAC Status and Plans.
:: ::::: ::::: ::::: ::::: ::::: ::::: ::::: ::::: ::::: ::::: ::::: :: GridKA School 2009 MPI on Grids 1 MPI On Grids September 3 rd, GridKA School 2009.
3rd June 2004 CDF Grid SAM:Metadata and Middleware Components Mòrag Burgon-Lyon University of Glasgow.
Distribution After Release Tool Natalia Ratnikova.
Apr 30, 20081/11 VO Services Project – Stakeholders’ Meeting Gabriele Garzoglio VO Services Project Stakeholders’ Meeting Apr 30, 2008 Gabriele Garzoglio.
Nick Brook Current status Future Collaboration Plans Future UK plans.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES PhEDEx Monitoring Nicolò Magini CERN IT-ES-VOS For the PhEDEx.
Contents 1.Introduction, architecture 2.Live demonstration 3.Extensibility.
Belle MC Production on Grid 2 nd Open Meeting of the SuperKEKB Collaboration Soft/Comp session 17 March, 2009 Hideyuki Nakazawa National Central University.
LCG Middleware Testing in 2005 and Future Plans E.Slabospitskaya, IHEP, Russia CERN-Russia Joint Working Group on LHC Computing March, 6, 2006.
Oracle 10g Database Administrator: Implementation and Administration Chapter 2 Tools and Architecture.
ILDG Middleware Status Chip Watson ILDG-6 Workshop May 12, 2005.
Dual Readout Dec 18 th 2007 Hans Wenzel SLIC and multiple readouts. Hans Wenzel Fermilab Warning: Work in progress! Current Status Where to find executables,
The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within.
GEM Portal and SERVOGrid for Earthquake Science PTLIU Laboratory for Community Grids Geoffrey Fox, Marlon Pierce Computer Science, Informatics, Physics.
Stuart Wakefield Imperial College London Evolution of BOSS, a tool for job submission and tracking W. Bacchi, G. Codispoti, C. Grandi, INFN Bologna D.
Status of the LHCb MC production system Andrei Tsaregorodtsev, CPPM, Marseille DataGRID France workshop, Marseille, 24 September 2002.
And Tier 3 monitoring Tier 3 Ivan Kadochnikov LIT JINR
Continuous DB integration testing with RAT „RATCOIN”
Nguyen Tuan Anh. VN-Grid: Goals  Grid middleware (focus of this presentation)  Tuan Anh  Grid applications  Hoai.
David Adams ATLAS DIAL/ADA JDL and catalogs David Adams BNL December 4, 2003 ATLAS software workshop Production session CERN.
Module 8 : Configuration II Jong S. Bok
Confidential Continuous Integration Framework (CIF) 5/18/2004.
David Adams ATLAS DIAL: Distributed Interactive Analysis of Large datasets David Adams BNL August 5, 2002 BNL OMEGA talk.
9 Copyright © 2009, Oracle. All rights reserved. Deploying and Reporting on ETL Jobs.
1 The EDIT System, Overview European Commission – Eurostat.
INFSO-RI Enabling Grids for E-sciencE ARDA Experiment Dashboard Ricardo Rocha (ARDA – CERN) on behalf of the Dashboard Team.
SAM Sensors & Tests Judit Novak CERN IT/GD SAM Review I. 21. May 2007, CERN.
The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures contract no Workflow repository, user.
DSpace System Architecture 11 July 2002 DSpace System Architecture.
The GridPP DIRAC project DIRAC for non-LHC communities.
Recent Enhancements to Quality Assurance and Case Management within the Emissions Modeling Framework Alison Eyth, R. Partheepan, Q. He Carolina Environmental.
Benchmark 2 progress report and future directions Sergey Lyskov
Grid Remote Execution of Large Climate Models (NERC Cluster Grid) Dan Bretherton, Jon Blower and Keith Haines Reading e-Science Centre
Global ADC Job Monitoring Laura Sargsyan (YerPhI).
November 1, 2004 ElizabethGallas -- D0 Luminosity Db 1 D0 Luminosity Database: Checklist for Production Elizabeth Gallas Fermilab Computing Division /
Geant4 is a toolkit to simulate the passage of particles through matter, and is widely used in HEP, in medical physics and for space applications. Ongoing.
INFSO-RI Enabling Grids for E-sciencE Using of GANGA interface for Athena applications A. Zalite / PNPI.
Sep. 23 rd, 2013 Geant4 Collaboration Meeting 1 Hans Wenzel, for the Physics Validation Task Force Parallel Session 1B – Physics Validation Tools Sep 23.
Metric Studio Cognos 8 BI. Objectives  In this module, we will examine:  Concepts and Overview  An Introduction to Metric Studio  Cognos 8 BI Integration.
Gennaro Tortone, Sergio Fantinel – Bologna, LCG-EDT Monitoring Service DataTAG WP4 Monitoring Group DataTAG WP4 meeting Bologna –
Validation db status and plans (what happened since the Collaboration meeting) Hans Wenzel 10th Physics Lists and Validation Tools working group meeting.
The GridPP DIRAC project DIRAC for non-LHC communities.
Origami: Scientific Distributed Workflow in McIDAS-V Maciek Smuga-Otto, Bruce Flynn (also Bob Knuteson, Ray Garcia) SSEC.
Simulation Production System Science Advisory Committee Meeting UW-Madison March 1 st -2 nd 2007 Juan Carlos Díaz Vélez.
INFSO-RI Enabling Grids for E-sciencE File Transfer Software and Service SC3 Gavin McCance – JRA1 Data Management Cluster Service.
Geant4 GRID production Sangwan Kim, Vu Trong Hieu, AD At KISTI.
Web Application & Validation Hans Wenzel 20 th Geant4 Collaboration Meeting September 28, 2015.
Open Science Grid Configuring RSV OSG Resource & Service Validation Thomas Wang Grid Operations Center (OSG-GOC) Indiana University.
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) gLite Grid Introduction Salma Saber Electronic.
1 GlueX Software Oct. 21, 2004 D. Lawrence, JLab.
Multi-threading and other parallelism options J. Apostolakis Summary of parallel session. Original title was “Technical aspects of proposed multi-threading.
Simulation Production System
Overview of the Belle II computing
Oracle Architecture Overview
Presentation transcript:

Status Report on the Validation Framework S. Banerjee, D. Elvira, H. Wenzel, J. Yarba Fermilab 15th Geant4 Collaboration Workshop 10/06/2010 1

Overview Motivation and Benefits Overview of the system and the Workflow Deployed Tools & near-term plans Computing Resources and future plans Summary Julia Yarba, FNAL – 10/06/2010 2

Motivation and Benefits Motivation: – Standardize testing among developers Benefits: – Improve the consistency of the tests – Completion of tests on definite timescale – Access to the results in the central location – Share the tools and resources – Share the comparison reference – Track history as the models evolve Julia Yarba, FNAL – 10/06/2010 3

System Overview Geant4 application code + Ascii tables - in CVS – Build executables & select subset/groups or all tests Computing Resources (more later) Applications to perform the following: – Execute (incl. parallel jobs for CPU-heavy tests) – Merge and Compare – Examine, Store (Publish) and Display Requirement & Design Documents: Joint effort with EM – talk by A.Schaelicke Julia Yarba, FNAL – 10/06/2010 4

Workflow and Proposed Applications Monitoring Merge & Compare Launch/Run Scoring & Storage Publish & Browse Temporary Storage Permanent Storage Julia Yarba, FNAL – 10/06/2010 5

Storage, Display and Publishing Julia Yarba, FNAL – 10/20/2009 Human: examine results, comment make decision if to store Human: examine results, comment make decision if to store Storage : Root files (coming soon) Comparison plots (GIF) Metadata Access ctrl PostgresSQL + Web-based (JSP) Publishing/Display 6

DB and Web Application up and running The DB is backed up. The setup is documented: Julia Yarba, FNAL – 10/06/2010 Publishing Results (password protected) 7

Open Issues & Near-term Plans Improve & clean up Publication tools Upload large volume of existing data (tools for multiple uploads in progress) Add features for uploading Root files Improve indexing and searching Interactive overlay/comparison Maintenance Anything else ? Manpower needed ! Julia Yarba, FNAL – 10/06/2010 8

Computing Resources Dedicated resources available at FermiGrid – Guaranteed run-time environment – Geant4 build provided via central install being exported to worker nodes (e.g. /grid/app on Fermigrid) – Job monitoring and diagnostic is (relatively) easy Other grid sites can be added if interested “Opportunistic” use of resources on-site possible OSGMM installed and documented; need to try Manpower needed to implement production tools Julia Yarba, FNAL – 10/06/2010 9

Execution, Results Collection Launching Jobs Merge, Analyze/Compare: vs exp.data regression Low Level Monitoring: Check if ALL jobs finish Prompts Merge, etc. Proc1 Proc2 ProcN root log Application I: shell scripts, JDL scripts (preserve possibility to run interactively) …….. Application II: Shell or python scripts Application III: Root macro’s, shell scripts Julia Yarba, FNAL – 10/06/2010 log EOJ 10

Summary G4 Validation Framework is joint effort HAD+EM Storage, Display and Publication tools deployed at the dedicated server at DESY-Zeuthen DB is backed up, setup documented Collection of validation results partially transferred to the new system; need to complete ! Various improvements – in near-term plans Next big step – production tools Manpower absolutely needed ! Julia Yarba, FNAL – 10/06/