STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.

Slides:



Advertisements
Similar presentations
RPC Purifiers’ studies /status/ IR, RG
Advertisements

Aging, High Rate and Shielding L. Lopes Lip-Coimbra.
FUTURE IRRADIATION FACILITIES AT CERN Lucie Linssen PH/LCD - for the Irradiation Facilities WG  Introduction.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Gas Detectors Ageing, Materials, Validations Input to RD51 WG2 (Basic detector R&D) Mar Capeans CERN, December 10 th, 2008.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
02/07/2014R. Guida CERN/PH-DT-DI1 RPC R&D Collaboration PH-DT Topics of Interest Studies of gas systems performance and development of dedicated gas modules.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Optimization of the Resistive Plate Chamber operation with a closed loop gas system at the Large Hadron Collider experiments M. Capeans, I. Glushkov, R.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
The RPC Closed loop Gas System Slides from Bianco and Guida.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement WP8 – Improvement and.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
The LHCb Muon System and LAPE Participation Burkhard Schmidt CERN - EP/LHB Presented at the CNPq Workshop Rio de Janeiro, 12 January 1999.
M.Moll, M.Silari, H.Vincke – 3.April Feedback  In total 134 forms filled:
Introduction to Irradiation Facilities 1. Challenges at LHC and Why we need Irradiation Facilities (Mar CAPEANS) 2. PH Department Proton and Neutron Facilities.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
Siena 2002 Siena, 24/10/2002 G. Passaleva New results from an extensive aging test on bakelite RPC G. Passaleva INFN Firenze.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
S.Colafranceschi 20 June Stefano Colafranceschi LNF Frascati CERN Universita’ di Roma – La sapienza An overview on gas studies, purifier materials.
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI1 Status of procurement:
General Introduction Markus Nordberg (CERN DG-DI-DI) 1
30/4/2010Mar CAPEANSDT Steering Board meeting White Paper R&D WP7 Facilities and Component Analysis for Detector R&D.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
CERN accelerator chain (operating and approved projects)
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Expected wire accumulated charge at 3000 fb-1 for various chamber types.
The Next Generation of a Gamma Irradiation Facility GIF++
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Outlook by the Physics Coordinator
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT.
WP8 – Improvement and equipment of irradiation beam lines
R. Guida PH-DT-DI Boston Students Program CERN, 16/1/2013
Irradiation Facilities Questionnaire
CERN Testbeam facilities
Presentation transcript:

STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C. 1

WP R&D Status Report 3/11/08 M.C. 2  Facilities and Component Analysis for Detector R&D  Timescale:  Lines of activity:  Mar Capeans, together with C.Rembser for GIF++, lead this WP Construction of SLHC compatible Gamma and Hadron irradiation facilities Component Analysis for Detector R&D: LHC RPC Gas Studies Material Studies & Test Reference Lab Component Analysis for Detector R&D: LHC RPC Gas Studies Material Studies & Test Reference Lab Clients: CERN users Clients: RPCs, LHC/SLHC, RD51, NA62, etc

SLHC-compatible Irradiation Facilities WP R&D Status Report 3/11/08 M.C. 3  Activity started in the framework of the Working Group for Future Irradiation Facilities, created at the end of  In this context, the Group launched a broad web-based survey of requirements (Gamma, proton and mixed field, high energy high Z ions) in February  WP7 shall include the work to upgrade:  the high rate, large area gamma facility GIF (GIF++), and  the PS, high fluence, proton and neutron facilities.  The bad news: DevDet project, submitted to the EC FP7 program and with WPs including the upgrade of those facilities, failed. Need to see how to keep alive the collaboration/activities foreseen there.

GIF++ WP R&D Status Report 3/11/08 M.C. 4  Current Limitation of GIF: old 60 Co source, no particle beam… Shutdown is foreseen for end 09  The analysis of answers to the GIF++ questionnaire shows that the users can be easily clustered in two groups:  Those interested to test radiation hardness of materials, small prototype detectors, electronic components and radiation monitors or dosimetry under a strong photon flux.  Users focused on the characterization and understanding of the long-term behavior of large particle detectors. In addition to the high rate photon background a simultaneous, high energy (SPS), low rate and narrow muon beam is needed.

GIF++ Specs WP R&D Status Report 3/11/08 M.C. 5  SPS West Area Particle beam: muon beam (~ 10 4 particles per spill traversing an area of 10 cm x 10 cm) with option of an electron beam. Beam momentum ~ 100 GeV  Source: 137 Cs (662 keV) ~10TBq; 2 Gy/h at 50 cm  Photon rate attenuation in steps and up to 5 orders of magnitude  Clever peripheral infrastructure  Uniform Irradiation area: _Specs_GIF++_V2.pdf

Upgrade of PS p, n facilities WP R&D Status Report 3/11/08 M.C. 6  Current limitations: parasitic operation (DIRAC), access via primary beam area, personnel exposure, limited space, limited rate. Machine Community prefers 450 GeV/c and Experiment Community needs 24 GeV/c PS vs. SPS being worked out Targeting overall work program and timescale similar to GIF++ Feedback for proton facility dominated by Inner Tracker communities of the experiments (known users)

Timescale WP R&D Status Report 3/11/08 M.C. 7 Design Construction & Procurement Commissioning Ready June 08 – April 09 Collection of User Requirements Proposals by AB (Nov 08) Approval of: Final Technical Description Cost books Contributions May 09 – Dec 09 Jan 10 – May 10 May 10

Component Analysis for Detector R&D ➤ LHC RPC Gas Studies WP R&D Status Report 3/11/08 M.C. 8 Background: when RPCs are operated in a high radiation environment, many different chemically very reactive impurities are created which are potentially dangerous for the detector materials and the closed- loop gas system. HV Off The current study aims at the understanding of these processes in the GIF irradiation field and the development of methods to mitigate or reverse the degrading effects: Identifying harmful impurities in the gas Finding suitable Filters Optimizing operation in LHC

RPC studies at the GIF (R.Guida, I.Glushkov) WP R&D Status Report 3/11/08 M.C. 9 Fluoride concentration as a function of RPC efficiency (HV) for different concentrations of the components in the RPC gas mixture (C 2 H 2 F 4 + iC 4 H 10 +SF 6 ) >> R.Guida Impurities identified by GC/MS in the returned gas mixture for heavily irradiated RPCs (~300 Hz/cm 2 ) >> I.Glushkov  Running at the GIF since 6 months (1 cGy/h over a large area of the detectors)  Six CMS double gap RPC  Small scale gas system, equivalent to the systems installed at the LHC, plus a custom made filter rack that allow parallel studies of different filtering agents

RPC studies at the GIF (R.Guida, I.Glushkov) WP R&D Status Report 3/11/08 M.C. 10 Characterized the filtering capacity of 6 different purifying agents, their lifetime and how to use them optimally with the complex RPC gas mixture. Tests will continue focusing on the identification of impurities dangerous for RPC operation and how to avoid them

Component Analysis for Detector R&D ➤ Material Studies WP R&D Status Report 3/11/08 M.C. 11  Objective: some effort will be devoted to compile the knowledge available on materials, gas systems components and filtering techniques, and on tests and operation procedures developed during the R&D LHC detector phases.  Status: just taking off Materials DB framework being established Agreed data collection with gas detector communities of LHC experiments Agreed on the scope to maintain a ‘Test Reference Lab’ heavily used by the ATLAS TRT community (specialized Lab in B.155)  Add data on structural materials (discussion with PH engineers in the next days)

Meetings WP R&D Status Report 3/11/08 M.C. 12  Irradiation facilities  Meetings with CERN Departments are held in the framework of the Irradiation Facilities Working Group  Dedicated meetings with users take place every 3-4 months  RPC studies  Topic discussed within the RPC Task Force Meeting organized by A.Sharma. It includes LHC RPC groups and takes place every 2-3 weeks.  Materials  Contacts with Experiments and TS as needed

Resources WP R&D Status Report 3/11/08 M.C. 13 Approximate resources over 4 years: 13 FTE & 1000 kCHF  In 2008: ~2.3 FTE and 100 kCHF material budget (9 months of Associates )

Expenditure: Budget, Actual, Projected WP R&D Status Report 3/11/08 M.C. 14 Projected Actual Budget

Expenditure WP R&D Status Report 3/11/08 15 M.C.

WP7 Work Plan WP R&D Status Report 3/11/08 M.C. 16  2008 Gas studies at ISR (lab facility) and dedicated GIF set-up Materials DB framework and establish benchmarks (SLHC) Define User Requirements for Upgraded Irradiation Facilities  2009 Consolidation of cost-effective RPC operation parameters for LHC Set-up Reference Aging Lab, collect existing data on materials Preparation and approval of a Technical Design Proposal for Irrad. Facilities (AB Dept) Procurement and Construction Phases of Upgraded Irradiation Facilities  2010 Implement optimal filtering elements in LHC RPC gas systems Deliver Material Books Irradiation Facilities > Target date ‘Ready for Users’: May  2011 Update Material Books Irradiation Facilities > First report of results ✔ Just Started ✔

Next difficult efforts WP R&D Status Report 3/11/08 M.C. 17  Funding proposal for irradiation facilities  Materials DB (IT work)