Entry Capacity Trading Transmission Work Stream, 5 April 2007.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Mod 485: CMP-LTUIOLI Progress Update 3 April 2014.
Entry Capacity Substitution Transmission Workstream – 6 th August 2009.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Transfer & Trades Special Transmission Workstream
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Transfer & Trades Special Transmission Workstream
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DRSEC Update Transmission Workstream 06 November 2008.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Assignment of NTS Entry Capacity Review Group 221, 10th December 2008.
Industry Dialogue on xoserve Services 14 th September 2007.
Transfers and Trades Special Transmission Workstream
Force Majeure Existing FM situation: Up to 200GWh/d capacity shortfall due to the rejection of NG’s planning application for a PRI in Corse / Tirley area.
Gemini Release 4 UKLC Update 8 th February Gemini Release 4 – UKL13820  UK Link Committee is requested to approve the following:  Implementation.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Entry Capacity Overrun price calculation
Exit Capacity User Commitment – Transmission Workstream update
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
COR1072 Enduring Transfer and Trade Arrangements
CSS Update for CoMC 19th September 2018
Exit Capacity Substitution and Revision
Transmission Workgroup June 7th 2012
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Modification 501 slides for Workgroup
Long Term Non Firm Capacity Update
Entry Overrun Calculation
Richard Fairholme E.ON UK
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
Assignment of NTS Entry Capacity – Work currently being Undertaken
Assignment of NTS Entry Capacity – Previous Work Undertaken
Exit Overruns in the Enduring Regime
Entry Capacity Transfers - Constrained Period
Transmission Workstream 05 November 2009
Presentation transcript:

Entry Capacity Trading Transmission Work Stream, 5 April 2007

Background  Our aim is to have a means of transferring sold NTS Entry Capacity between ASEPs prior to 1 October 2007  National Grid NTS has previously proposed:  Ongoing trading process  Trades to be time stamped and placed in queue  Application of ex ante trade rates based on:  individual request for a donor-recipient pair  other trades are not considered concurrently  Suitable for small numbers of trades  Could manage for the same shipper the same donor- recipient pair for 6 months of trades in 5 days  We are looking to develop an offline trading process supported by a means of amending Users holdings within Gemini. Other are also looking to do the same

Ideal Process Licence Obligation Methodology Statement UNC Modification Systems Development Implementation All elements need to be in place to successfully undertake the trading process

Mod 138  Eon have raised Mod 138 which:  Is similar to the AMTSEC process outlined in Mod 133  Invites applicants to transfer sold capacity to sold out ASEPs  Has a window to submit trades (bids under Mod 133)  Utilises the donor/recipient concept  Requires ex-ante trade rates for every donor/recipient combination  Use of pro-ration where aggregate trades/bids breach the nodal maxima

Mod 138  National Grid NTS is supportive of a number of elements within the Eon proposal:  Use of a trade window  Trades being limited to those ASEPs and for those months where capacity is sold out  Use of pro-ration where aggregate trade requests breach an ASEPs nodal maximum  National Grid NTS does have concerns about some elements  Providing exchange rates ex-ante  Timing of the trade window  Two day allocation process

For discussion  As an alternative to the current proposed National Grid NTS Mod, we could facilitate the transfer of sold NTS entry capacity via a Trade Registration Window (timing of which to be discussed)  Trades to be accepted for those ASEPs where capacity has been sold out (similar to AMTSEC)  ASEPS progressed in order of highest bid paid at AMSEC  Shippers would need to provide National Grid NTS with:  Recipient ASEP  Quantity (cannot breach nodal maximum)  Potential donor ASEP(s)  Month (one trade will be for one month)

For discussion  National Grid NTS would look to provide the User with a guidance range of potential exchange rates.  User would need to confirm which donors they want to be considered, the minimum quantity at the recipient ASEP and their minimum acceptable exchange rate  National Grid NTS will then process each donor in a merit order – to be determined / views sought  All trades at the donor will be pro-rated where nodal maximum breached  Donors processed until nodal maximum reached  Allocations undertaken offline and results fed back to Users

Issues (1)  Irrespective of the final implemented proposal there are a number of issues that will have to be overcome  Provision of ex-ante exchange rates – exchange rates can be calculated for a fixed moment in time, once one trade takes place all rates will need to be recalculated. This creating an iterative loop where exchange rates are recalculated after each trade is confirmed or rejected.  Timing of window – Mod 138 requires the trade window to be prior to the AMTSEC process. The impact of trading upon transfers needs to be explored:  Trades would have a higher exchange rate if transfers done first at the same donor  Time taken to process the trades may delay AMTSEC  To complete both systems in time may be a challenge for IS implementation

Issues (2)  National Grid NTS has explored two potential solutions for reflecting Users updated holdings within Gemini:  Option 1 - Xoserve Datafix Users holdings  This option whilst technically feasible is not ideal as there are a number of issues associated with it:  The breakdown of Users entitlements will not match their aggregate entitlements as the trade values are not captured  There will be no audit trail on Gemini  Each datafix will need to be scripted & tested prior to implementation  Each will have to be approved via the associated Global Change Activity Request Process (GCAR) which only meets on a Wednesday, requiring each datafix to be scripted, tested and signed off by the preceding Friday  The use of datafixing is for fix on fail instances not as a solution option for business process, to use this would be contrary to Xoserve policy.

Issues (3)  This option proposes significant risks to the integrity of the Gemini system and its data.  There are a number of timescales associated with this option:  4-6 weeks for governance processes (Change Order etc)  6-8 weeks to cover both analysis and acceptance testing periods.  If the analysis determines that functional change is required in order to meet this solution then additional timescales would apply.

Issues (4)  Option 2 Creation of a National Grid Trading Account – This is also feasible and again has a number of issues associated with it:  The account will be liable for negative overrun charges  These charges will feed the NTS Entry Capacity Neutrality calculation  The account will have an end of day entitlement which will attract a neutrality smear  There will be issues with resource and environments due to the Oracle upgrade  Ongoing manual operational costs would be incurred to ensure that any charge/credits/invoices for this account are suppressed  The timescales are the same as for Option 1.

Our proposed way forward  Evaluate the two enhanced models based on your feedback:  Model 1:  Sold out ASEPs only  Prioritisation via AMSEC price  Window for applications for each ASEP  FCFS within window  5 days + 2 days per request for a donor-recipient pair  Model 2:  Application window for all sold out ASEPs  Shippers put forward donors  NG NTS provides exchange rate guidance  Shippers commit to minimum quantities and minimum exchange rates  NG NTS works through each ASEP, based on AMSEC price, with donors placed in a to be agreed merit order  All requests are dealt with in an overall window (initial estimates suggest one day per recipient-donor combination)  Views??