Real time performance estimates of the LHC BPM and BLM system SL/BI.

Slides:



Advertisements
Similar presentations
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Advertisements

BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
20 September 2000 LHC slow timing implementations brainstorming on slow timing Wednesday 20 September M.Jonker.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
1 Linac/400 MeV BPM System Status Nathan Eddy PIP Meeting 8/8/12.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Distributed BI Systems BLM, BPM, BTV and BRAN Laurette Ponce & Fabio Follin Thanks to: Anthony Rey, Enrico Bravin, Rhodri Jones, Bernd Dehning, Mariusz.
Simple Solutions to Simple Problems Global Trigger of a Post Mortem Event Don McGilvery Australian Synchrotron.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
BI-TB on BST Systems Introduction (L. Jensen) Hardware for SPS/LHC masters and receivers (old and new) (JJ. Savioz) Software for masters and receivers.
BCT for protection LHC Machine Protection Review April 2005 David Belohrad, AB-BDI-PI
LHC Sector Test1 LHC Sector Test - Beam IntroductionMike LamontIntroductionMike Lamont Proposed tests with beamBrennan GoddardProposed tests with.
J. Varela, LIP-Lisbon/CERN LEADE WG Meeting CERN, 29 March 2004 Requirements of CMS on the BST J. Varela LIP Lisbon / CERN LHC Experiment Accelerator Data.
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
LHC Collimation Project Integration into the control system Michel Jonker External Review of the LHC Collimation Project 1 July 2004.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
E.B. Holzer Chamonix XV workshop, Divonne-les-Bains January 24, BI Group Commitments and Major Issues for Distributed Systems E.B. Holzer, J.J.
Fermilab February 17, 2003Recycler BPM Front-end1 Duane C. Voy
1ICALEPCS, October 15-19, 2007, Knoxville, Tennessee Association Euratom-Cea Ph. Moreau Association EURATOM-CEA Département de Recherches sur la Fusion.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
TC 25th October1 LHC Real-time requirements What is real-time? What is latency? The time between asking for something to be done and it being done The.
The 1 st year of TMS operations Stéphane Bart Pedersen BE-BI-SW November 2011.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Post Mortem Workshop Session 4 Data Providers, Volume and Type of Analysis Beam Instrumentation Stéphane Bart Pedersen January 2007.
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
VME64x Digital Acquisition Board (TRIUMF-DAB) Designed to handle 2 channels of 12-bit 40MHz Data Will be used for both the LTI & LHC beam position system.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
TC 25th October1 Real-time A system -- e.g., application system, computer system, operating system -- operates in real time to the degree that those of.
The LHC Beam Position System Ad-hoc Working Group on LHC Experiment-Machine Parameter and Signal Exchange 26 th March 2002 Rhodri Jones (SL/BI)
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
LHC RT feedback(s) CO Viewpoint Kris Kostro, AB/CO/FC.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Some thoughs about trigger/DAQ … Dominique Breton (C.Beigbeder, G.Dubois-Felsmann, S.Luitz) SuperB meeting – La Biodola – June 2008.
Use of a Diamond BLM System in the LHC Ring
RF acceleration and transverse damper systems
A monitoring system for the beam-based feedbacks in the LHC
2007 IEEE Nuclear Science Symposium (NSS)
J. Wenninger AB-OP-SPS for the non-dormant AB feedback team,
M.J. Barnes : Canadian Involvement with LHC
Use of a Diamond BLM System in the LHC Ring
ATF/ATF2 Control System
The ELENA BPM System. Status and Plans.
Diagnostics for ThomX Nicolas HUBERT, Marie LABAT, Moussa EL-AJJOURI, D. PEDEAU, Synchrotron SOLEIL Iryna CHAIKOVSKA, N. DELERUE, LAL.
VELO readout On detector electronics Off detector electronics to DAQ
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Thursday morning – optics correction
Distributed BI Systems
Remote setting of LHC BLM thresholds?
Combiner functionalities
Wire almost entirely through beam before BLM triggers dump
BEAM LOSS MONITORS The BLM system Status of the monitors
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
LHC dry-runs (BE-BI view)
Report on Beam Loss Monitors
LHC BLM Software audit June 2008.
Beam Interlocks for Detectors and Movable Devices
Beam instrumentation and background monitoring
Presentation transcript:

Real time performance estimates of the LHC BPM and BLM system SL/BI

29/03/2000SLTCJJG - SL/BI - 2 Contents BLM/BPM System Layout. BLM/BPM Functionality Requested. BLM/BPM Real Time Behavior. First Conclusions. Open Issues.

29/03/2000SLTCJJG - SL/BI - 3 The Beam Position Monitors (BPM) (cf. LHC BI Conceptual Design Report)  For each transfer line 26 H and 27 V  106 monitors.  For the main rings about 1000 monitors (H & V).  The specifications for the rings and transfer lines beam position systems are very similar  a common approach for the readout electronics and for the calibration system is planned.  TI8 BPMs and CO Infrastructure (Timing, Network, Middleware…) have to be ready in TI8 for February 2004 injection test.  A prototype digital acquisition board (DAB) is in development at TRIUMF (part of Canadian contribution to LHC funded until May 2000). It will be delivered and tested in the SPS (BA4) this summer.

29/03/2000SLTCJJG - SL/BI - 4 The Beam Loss Monitors (BLM) (cf. LHC BI Conceptual Design Report)  The beam halos will be cleaned by means of multiple collimators in the two insertions at IP3 and IP7. The dedicated BLMs will NOT be housed in the BPM crates.  The tertiary halo which will escape from the cleaning insertions will be concentrated around the quadrupoles BLMs will be located close to the quadrupoles and housed in the BPM crates.  All BLMs will be permanently surveyed in order to dump the beam to prevent magnet quenches.

29/03/2000SLTCJJG - SL/BI - 5 BPM/BLM System Layout (1/2) BPM ~ 500 PUs (H and V) distributed around each ring. Housed in 250 crates around tunnel  4 PUs per crate with their 40 MHz processing electronics (analogue and digital). To ensure enough bandwidth to readout non RT data-sets (multi-turn data, post mortem data, etc.), a standard 10 Mbit/s Ethernet connection for each station via ATM gateways to the PCR has been proposed. BLM 6 detectors per QD/QF quadrupole pair ( 3 detecting losses from each ring) Those share the 250 BPM crates  12 detectors per crate with their electronics measuring loss rates individually for each of the 12 batches. 1 Mbits/s WorldFIP segments (each handling up to 6 crates) are considered for transmitting the RT data-flow via the ATM gateways to the PCR.

29/03/2000SLTCJJG - SL/BI - 6 BLM/BPM System Layout (2/2) Ethernet: General purpose (Mass data retrieval, setting...). ATM : RT communications between PCR and US/UJ/RE. WorldFIP: - 10Hz RT Orbit Correction (Front End->US/UJ). - Beam Loss Monitoring (Front End->US/UJ). BST: - 11kHz. Turn clock (Main Signal) - All Synchronization signals. (fast timing 40 MHz) - All Synchronous commands. Ring (* 250) -> Up to 6 crates per Wfip Bus, 4 BPMs & 16 BLMs per crate BLM/BPM Crate... R.Reboot R.Console Network Switch (10 Mbits/s) US/UJ/RE (* 24) Local BST Drivers Ctrl Station (PPC) BI WorldFIP Master * 2 PCR WorkStation/PPC (HPUX, LinuX, NT…) Network Switch (GigaEth) PCR Remote Reboot Remote Console BST Master (? TTC ?) Network Switch (ATM)

29/03/2000SLTCJJG - SL/BI - 7 BI Crate Layout (if VME is chosen)

29/03/2000SLTCJJG - SL/BI - 8 BLM/BPM VME Crate (if VME is chosen)

29/03/2000SLTCJJG - SL/BI - 9 Beam Orbit Measurement Functionality For the global orbit feedback with closed loop bandwidth of 1 Hz a readout of average orbit data at 10 Hz is foreseen. For the other applications (1000 turns, Optic Measurements…) it will be possible to trigger on request the acquisition of N consecutive turns of any M bunches, where N x M may not exceed For the post mortem (frozen by beam dump), the circular storage in the DAB of about the last second of orbit data is currently considered.

29/03/2000SLTCJJG - SL/BI - 10 Beam Loss Monitors Functionality To prevent magnet quenches, the BLM electronics will measure loss rates individually for each of the 12 batches integrated over 10 ms  100 Hz measurement rate. If data has to be concentrated to apply beam abort algorithm, we will need to transmit to PCR at least beam average rates at 100 Hz. For the post mortem (frozen by beam dump), we could maintain locally parallel circular buffers at 100 Hz and 1 Hz (e.g. could have last 256 s every 1 s and 2.56 s every 10 ms for each detector and batch).

29/03/2000SLTCJJG - SL/BI - 11

29/03/2000SLTCJJG - SL/BI - 12 First Conclusions Every single piece of the puzzle is feasible, BUT we must keep in mind that the assembly, tuning and commissioning of the entire system will be a very difficult task that will need time, collaboration, competence and experience. We need the TI8 BPM system to be ready for February Due to this, we have to define and chose the HW (VME, Wfip 2.5Mb/s, ATM, Optic Fiber,…) and SW (PPC, LynxOS,...) development platform this summer and stick to it. We need answers to the open issues in the coming months....

29/03/2000SLTCJJG - SL/BI - 13 Why So Early Radiation qualification problems may induce long delays. People availability. We will have to deal with a very complicated system.

29/03/2000SLTCJJG - SL/BI - 14 Open Issues LHC Front End Platform... Beam Dump… (When, How…) Post Mortem… (When, What...) BLM/BPM acquisition RT transmission… Optic Fiber in the Tunnel... BST … (What, How…) BLM/BPM/WorldFIP/ATM synchronization… Absolute time stamp...