DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
André Augustinus 16 June 2003 DCS Workshop Safety.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Familiarization and Operation
Engineer Training Troubleshooting TJ8300 / TJ8500 Troubleshooting.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
The procedure to replace CALO rectifier (AC/DC converter) 1.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
Should be on Up to hear patient button presses Down to mute. In either case the #1 and #2 lights should light with each button press. Leave the 5 to the.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
MDT PS DCS for ATLAS Eleni Mountricha
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Web Based Monitoring DT online shifter tutorial Jesús Puerta-Pelayo CIEMAT Muon_Barrel_Workshop_07/July/10.
User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (written by Michela) HV part updated by Oleg Maev 4-November-09.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
Performance Tests and Control for the TRD-HV A. Markouizos, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE DCS Workshop CERN.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
DCS Plans and Pending Activities for 2013/14 Shutdown Muons in general Replacement/upgrade of DCS computers OS migration to Win-7, Win-2008 or SL6 PVSS.
22 October 20151/23Fabio Vinagre -- TileCal DCS TileCal DCS Expert tutorial - DCS 22 October 2015.
Muon System Safety Issues Burkhard Schmidt.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
26JUN08Calo Piquet Training Session - Xvc1 DCS and DSS Xavier Vilasis.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
PHOS DCS guide (for PVSS based products only) Alexander Mamonov Last update: 1 th October, 2010.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
Chamber Monitor Panel Emiliano Furfaro 16 october 2012.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
Service Section Technical Training December 2005.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
DCS Instructions K. Grogg, M. Weinberg, M. Grothe 1/24/20161.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
22-March-2010CSC DCS Instructions1 Top Level of CSC DCS UI Communication Status Majority Logic Subsystem Panel HV, LV, FEDS CSC End View * CSC * PCrates.
RPC DSS & DCS Action Matrices Review Anton Dimitrov CMS Action Matrix Review 2015, 06.Mar.2015, CERN, Geneva.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 TRT DCS: Shifter Basics Main goal – make sure TRT Detector is in good condition: - TRT FSM node: state READY and status OK - no alarms in the alarm screen.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
S. Batsouli DAQ Trouble-shooting. DAQ Trouble-shooting -1 1.If some of the atp/ seb/ ebc machines are not initialized correctly (appear red after the.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
ESR for the muon DT Minicrate System
Dry contact sensor HDL-MSD04.40 HDL-MSD08.40.
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
ATLAS MDT HV – LV Detector Control System (DCS)
How SCADA Systems Work?.
ESR for the muon DT Minicrate System
DT Infrastructure: LV, HV, Gas
K. Grogg, M. Weinberg, M. Grothe
Pierluigi Paolucci & Giovanni Polese
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010

General Info The Technical Shifter should call DT Infrastructure Expert (165507) given as a backup If you need an expert you can call: (Alberto) (Marina or Daniele)

DT Safety Considerations Overheating: - Inside the detector (MiniCrates) due to Cooling Plant failure (MUON Circuit), affects all MC, or obstructed flow-limiter, affects two MC in adjacent sectors. - Electronic modules inside Tower or USC Racks, due to Cooling Plant failure (Racks Circuit) that affects all racks, or a turbine failure that affects only the modules inside one rack. The most dangerous case is a turbine failure in a tower rack containing Sector Collector crates. Water Leaks: - Are detected by “leak detection” cables inside the detector and tower racks. Major leaks can also induce HV trips in one or more chambers.  DT expert (165507, backup: 79930) should be called for any error induced by Overheating or Water leaks Gas Failure: - Not critical, the DT chambers can be operated for ~ day without gas flow

DT States ON: - LV ON - HV ON: wires +3600V, strips +1800V, cathodes -1200V Standby: - LV ON - HV ON: wires +1900V, strips +1800V, cathodes -1200V Dormant: - LV ON - Sector Collector mezzanine boards (opto couplers) OFF - HV ON: wires +1900V, strips +1800V, cathodes -1200V OFF: - LV OFF - HV OFF  The DT should be in Standby mode when the Magnet is ramping.

strutsAction=%2FsubmitDetector.do%3Bjsessionid%3D898af9ec30d87aa1ed a6b953ea e18.e34Lb hiLbx8Nay0LbxqRbN8Naxb0n6jAmljGr5XDqQLvpAe%3FSelectedDetector%3DDT DT State vs Machine/Beam State

How to connect to PVSS from home (I) RemoteDesktop connection to the Terminal Server: - Connect to cerntscms01 as mudcs (usual pwd) - tunnel on lxplus → Source port: 8881, Destination: cerntscms01.cern.ch: RemoteDesktop connects to→ localhost:8881 For MAC Users: you can use CORD

How to connect to PVSS from home (II)

DT Detector Panel 1) 2) 7) 4) 5) 6) 3) Error conditions flagged by Red color on tabs and audio alarm (to be implemented): 1) Cooling 2) UX / USC Turbines, Smoke alarms 3) MC Temperatures/Communication Error 4) Water Leaks 5) LV Temperatures 6) Gas System 7)More than 1 MC LV error 8)HV Problem 6) 1) 5) 8)

Yoke Circuit Flow Error No action required Minicrate (MUON) Flow Error Cooling Plant Problem  Call DT Expert (165507) MC will switch OFF after 15’ Rack Circuit Flow Error Cooling Plant Problem  Call DT Expert (165507) LV, HV switch OFF after 20’ Supply T > 18°C Cooling Plant Problem  Call DT Expert (165507) DT-DCS shutoff in 30’ Time windows can be reset from “Reset Timeouts” button Cooling Problem

Tell the Technical Shifter to contact CCC and find out the time estimate to fix the problem Call immediately: (Alberto) or (Marina or Daniele)

UXC Rack Problem

Turbine is OFF (current ~ 0.4A)  Call DT Expert (165507) High Voltage USC: HV OFF in corresponding wheels within 300 seconds. Time window can be reset by apposite button LV USC S4F02: No Action Required USC Rack Problem

Check that affected components have been switched OFF Individual modules can be switched OFF by clicking the “ON” button Entire Wheel can be switched ON/OFF from the “Wheel ON-OFF” panel The LV Panel can be reached from the Detector Panel clicking the “MAO” button Caution: Toggle Buttons if pushed will change state MAO Panel actions described in page 6

A drop of water in one of the leak detection cables will trigger an alarm and the corresponding buttons will turn red.  Call DT Expert (165507)  No further action required from shifter Water Leak

A3100 Modules power the SC crates and have the largest load hence the high T. In Standby mode the SC Mezzanines will be off and the Temperatures will be lower. If the Temperature is above 40°C in several modules there is a cooling problem in the “Rack circuit” Time Histories are available from the buttons LV Boards Temperature Problem

Gas Alarm due to: Stopped gas flow  DT Chambers are safe without gas circulation for ~ 1day.  Do NOT call expert during the night Communication Error  Data are not stored in DataBase  Call DT Expert (165507) from 08:00 to 23:00 Button becomes RED when Communication is lost Gas Problem

HV Problem During the day: Call DT Expert (165507) During the night: Open ‘HV Layers Info’ panel: if you have >2 entries in the ‘Layers in STANDALONE’ column Or >5 entries in the ‘Layers not ON’ column Call DT Expert (165507)

All Previous Problems Call immediately: (Alberto) or (Marina or Daniele)

YB+1YB+2 MiniCrates Temperature If Temperature exceeds 40°C for 1 or 2 MC call Expert and it will help you to Switch OFF the MC If high T appears in several MC it is a cooling problem To Reach this panel MiniCrate Temperature Problem

In one MiniCrate - Switch OFF the MiniCrate (see next slide) In several MiniCrates - Probable Cooling Problem, call immediately: (Alberto) or (Marina or Daniele)

How to switch off one Minicrate You can choose if doing it yourself or asking the Technical Shifter to do it If you want to do it: - ask the Technical Shifter to Release the partition (DT+, DT- or DT0) - Take(*) the partition - Perform the action - When you’re done Release(*) the partition - Tell the Technical Shifter to Take(*) back the partition (*) see next slide to learn how to Take and Release Give a SWITCH_OFF_LV command from the Chamber Panel

How to Take/Release a FsM node Click the open lock and then ‘Take’ How to Take a node How to Release a node Click the lock and then ‘Release’

MiniCrates Communication Error In case communication is lost between PVSS and the MC control program, the Wheel Banner will turn red and blinking and the chambers will turn orange. Click the “Reset” button on the wheel and send “MC_Reset” from the top node. The LV will be switched OFF after 30’.  Call DT Expert (165507) You must “take” the “DT_Detector” to do any action and “release” it once you are done

MiniCrate Communication Problem In one wheel Restart the CCB Server for that wheel, as explained in the DT Expert FAQ twiki: In ALL the wheels Call DT Field Manager

MiniCrate with Boards Off 2.00 Try to switch ON the MiniCrate (from DCS GUI -> Power All) once - If command fails or boards switch off again, call DT Field Manager If the boxes are not green it means the LV channels actually tripped; in this case call the DT Field Manager

HV and LV can be switched OFF with a fast but safe procedure from the “Emergency Stop” buttons

Automatic DCS/DSS Actions

Problem Granularity HV LV FailureFraction of DT affected 1 channel1 layer 1 A8771 chamber 1 A8761 sector 1 SY15274 or 8 sectors (in 1 or 2 wheels) 1 HV rack1 or 2 wheels FailureFraction of DT affected 1 channel (A3050 or A3009)1 chamber 1 A30501 or 2 chambers 1 A3009 or 1 Easy 3000S crate1 sector 1 MAO (except S12)1 or 2 sector (N.B. MAO S12 = 1 wheel/2 SC crates) 1 A31006 sectors/1 SC crate 1 LV Rack (except X2 Near)1 quadrant (N.B. X2 Near = 1 wheel/2 SC crates) 1 Branch Controller (A1676A)half wheel SY1527 in S4whole detector