Leakage Model Development Proposals – Shrinkage Forum Discussion Wednesday 14 December 2011.

Slides:



Advertisements
Similar presentations
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Advertisements

UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Copyright © 2005 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Own Use Gas Review of Pre-heater.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
MIPI / RG140 Update Chris Shanley. Agenda  Review Group Background  MIPI Project - Background  RG140 Principles to be delivered via MIPI  Functionality.
School Funding Formula (Agenda item 7). Overview Provide an overview of the formula headlines Final schools funding formula 2015/16 Base Formula.
Shrinkage Forum Monday 27 June 2011, 31 Homer Road.
Copyright © 2005 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Own Use Gas Review of 2000 Model.
Shrinkage Forecasts - Factors David Simpson September 2014.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
MP0131: Meter Error Notifications Liz Spierling – July 4 th 2007.
LDZ Shrinkage - a National Grid Overview Chris Warner Mod 0194/RG 0208 June 2008.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
Shrinkage Forum 04 June 2013 Roy Malin. 2 Best Practice - Areas of Inconsistency AreaBackgroundAction Definition of All-PE systems Used to identify networks.
Shrinkage Forum 22 January 2014 Roy Malin /15 Shrinkage Proposals  Initial proposals issued December 2013  Proposed Shrinkage Quantities calculated.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
LDZ Shrinkage Forum Jonathan Dennett Elexon 22 nd June 2006.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Structure of Charges Year-end review for DCMF 22 November 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
Fair Go Rates System Dr Ron Ben-David Chairperson MAV Rate Capping Forum 26 November 2015.
Customer Charge On behalf of all DNs 25 October 2010.
RbD Subgroup Dean Johnson 8 th April 2008 RbD Subgroup Dean Johnson 8 th April 2008.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Allocation of Unidentified Gas Statement – Interim Report findings 17 th September 2012.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Review Group -140 Thoughts on additional information requirements.
Industry Dialogue on xoserve Services 14 th September 2007.
CAP169 02/04/09. 2 Today  Agree Terms of Reference  Timetable going forward  Discussion of Part 1 and Part 2 Finalise and agree  Discussion of Part.
Steven Oliver October 2012 Australia’s Country-Specific Emission Factors 1.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Pennsylvania Climate Change Act
Background Current balance of LDZ System and Customer charges
Interactions with the implementation of RIIO-T1
Annual Review of Shrinkage and Leakage Model
Code Governance Review UNC Modification Proposals
RIIO-GD1:network charging volatility
Transmission Workstream 4th July 2007
Mod 0621 Amendments to Gas Transmission Charging Regime
Rebecca Knight Mod 644 UIG Analysis.
Leakage Model Modification Update
0476 Alignment of DN Charging Methodology with RIIO-GD1 Arrangements
Mod 0621 Amendments to Gas Transmission Charging Regime
Leakage Model Modification Update
Assured Pressures Proposal
Pricing and Margins Manager National Grid Distribution
Development Work Group 194
Presentation transcript:

Leakage Model Development Proposals – Shrinkage Forum Discussion Wednesday 14 December 2011

2 Proposals  Two proposed changes to the National Leakage Model to improve its accuracy  Update low pressure service population assumptions  Update AGI Venting calculation

3 Why are we proposing these modifications now?  Transporters have to submit final business plans for RIIO-GD1 in April These will include our leakage projections.  We believe the proposed modifications provide for a more accurate and robust estimation of leakage and that these should be reflected in the baseline allowances  The current Transporter Licence requires Transporters to consult on modifications to the leakage model; this process takes two-three months

4 Low Pressure Service Modification - Background  Existing Metallic Main  Mixture of Steel and PE Services  Steel Service Leakage Rate 10.6m 3 p.a. per service  PE Service Leakage Rate 2.2m 3 p.a. per service  Existing PE Main  Predominantly PE Services (est 98%)  PE and Steel connections to PE mains found not to leak (2002/03 National Leakage Tests)

5 Low Pressure Service Modification - Mains Replacement  Mains Replacement  Steel service connections ‘re-laid’ in PE and connected to new main  PE service connections ‘transferred’ to new main

6 Low Pressure Service Modification - Current Model  Current Methodology  No. of Metallic Services determined using the original model applied up to 2006/07 (the year used to establish GDPCR1 baselines)  No. of replaced services deducted from starting values  Issues  Original model service population assumptions date back to early 1990s  Major assumption in original model is that a fixed proportion (one-third) of all services on mixed material networks are metallic  Condition replacement of services from early 1990s to 2006/07 not reflected in estimate  National assumption, i.e. same service population assumption for each LDZ

7 Low Pressure Service Modification - Proposed Model  New method of estimating the number of PE and Steel Services  Use the latest service ‘Re-lay’ and ‘Transfer’ data associated with mains replacement to estimate current population of metallic and plastic services, respectively  Use data from mains replacement work as representative of population as a whole  Determine No. services per km of metallic main  Propose to use three years mains replacement data to provide robust sample (6000km in comparison to 43,000km remaining for National Grid)  Establish a new Network specific baseline service population for 2010/11  Going Forward  As in the current model, no. of replaced services deducted from ‘Steel Service to Metal Main’ starting values  In addition, no. of transferred services deducted from ‘PE Service to Metal Main’ starting values

8 Low Pressure Service Modification – Number of Transfers and Re-lays 2008/092009/102010/11 Length Weighted Avg Transfers /km EoE LN NW WM Re-lays /km EoE LN NW WM

9 Low Pressure Service Modification – How will this work?  E.g. for East of England  Connections to Metallic Mains =  Steel Service connections to metallic mains = Re-lay Rate (42/km) x length of metallic main +  PE Service connections to metallic mains = Transfer Rate (44/km) x length of metallic main  Connections to PE mains = Total Number of Services – Connections to Metallic Mains  PE Service connections to PE Mains = 98% x Connections to PE Mains  Steel Service connections to PE Mains = 2% x Connections to PE Mains

10 Low Pressure Service Modification - Impact on Leakage Assessment LDZ 2010/11 Leakage GWh Current Model Proposed ModelChange EA % EM % NT % NW % WM % 1,6671, %

11 Low Pressure Service Modification – Metallic service proportion (mixed material networks) Metal Service Proportion EA21% EM19% NT18% NW23% WM29% National Grid22%

12 Low Pressure Service Modification - Benefits  Service population assumptions are more up-to-date and Network specific  Better estimate of forward leakage reduction associated with service replacement, as PE transfers taken into account

13 AGI Venting - Current Model  Current Methodology  ‘Fixed’ values based on a 1994 Watt Committee report  National estimate  Derivation unknown  National value apportioned across LDZs at time of Network Sale  Approximately 5% of over all emissions

14 AGI Venting -Background  Two routinely venting components  Positioners  Controllers  Venting occurs both in steady state and during control actions  Each AGI usually has a number of Positioners and Controllers  Positoners and Controllers originally designed to work with compressed air but modified to work with gas, as readily available on site.

15 AGI Venting - Pneumatic Control Mechanism

16 AGI Venting - Proposal  Proposed Methodology  Use manufacturers published data to estimate steady state venting  Actual emissions used in operation difficult to estimate, as depends on number of control actions. Propose a 25% uplift to reflect non-steady state emissions.  Typical operating pressure 70psi (4 Barg)  Site specific pressure may be difficult to determine

17 AGI Venting – National Grid Estimate Steady state venting rate (scf/m) Specified operating pressure (psi) Estimated mean NG operating pressure (psi) Venting rate per device (scm/day) Mean number of units on site Annual venting rate (scm/yr) Estimated 25% increase due to non steady state conditions (scm/yr/site) Positioners ,56065,700 Controllers ,65229,565 Total76,21295,265 LDZNo. Sites Estimated Venting (scm)Impact Proposed Model Current Model Volume (scm)Energy% EA141,333,7101,434, ,891-1 GWh-7% EM363,429,5401,353,0902,076,45022 GWh153% NT171,619,5051,556,86862,6371 GWh4% NW504,763,2501,817,7052,945,54531 GWh162% WM131,238,4451,565, ,575-4 GWh-21% 13012,384,4507,727,2844,657,16649 GWh60%

18 AGI Venting - Summary  Original AGI venting estimate:  Provenance?  Fixed, therefore, no incentive to reduce  Proposal  Site specific estimate  Provides incentive to reduce venting  Issues  Non-steady state venting difficult to estimate  Should be included for completeness of Shrinkage estimate  May be inappropriate to form part of an incentive

19 Benefits of Proposals  Key criteria for the Leakage Model  More Accurate  More Robust  Reflects Network specific data

20 Next Steps - Consultation  Consult on changes – January/February 2012  Any other changes?  28 Day Consultation Period  Proposal needs to be independently assessed – February 2012  GL Noble Denton were selected via a competitive tender for the previous modification

21 Next Steps – Implementation Options  Implement in current Price Control Period  Requirement to amend Environmental Emissions Baselines  Changes applicable to 2011/12 and 2012/13 leakage assessments and Shrinkage calculations  Implement in RIIO GD1  Baselines would include estimated impact of proposed modifications