Team 23 –RATMAZES Tyler Ferro, PM Andy Thouvenot, APM Adam Watkins Paul Stofko Dominic DiGregor David Coats Client Dr. Eric Jacobs Advisor Dr. Nazeih M.

Slides:



Advertisements
Similar presentations
Cory Fulkerson (Project Manager) - Mechanical Engineer John Graham - Computer Engineer Clayton Hooks - Electrical Engineer O’Raphael Okoro - Electrical.
Advertisements

© ABB AB, Corporate Research - 1 5/19/2015 abb Project Breakdown Structure Creation.
Operant Conditioning Chamber F09-23-RATMAZES Members Paul Stofko, EE (PM) Tyler Ferro, ECE Adam Watkins, CpE Dominic DiGregor, CpE Andy Thouvenot, ME David.
The Tail-Gate Information System Team: Paul and David Wickert Advisor: Dr. Mark Wickert.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 3 Tuesday 10/24 – Monday 10/30.
CSSE221: Software Dev. Honors Day 25 Announcements: Announcements: Now returning programming mini-exam feedback, HW7, and some capsule quizzes. Now returning.
Fall 2007 Schedule of Due Dates M/F: due at 3pm in ERC 536 W: due at class time start oral reports on 10/17 overview of project in 5-10 minutes.
Claims Service-Oriented Architecture Performance Prototype Team Hooloovoo.
MSD P07302Design Review1 Motor Controller Subsystem MSD P07302 Project Sponsor: KGCOE Project Members: D. ShenoyProject Manager S. TallauSoftware Design.
Testing Dr. Andrew Wallace PhD BEng(hons) EurIng
Senior Design 1 Team Shortnose Sucker: Project Auto-Shifting Bicycle Team –Tim Slevin-Vegdahl (Fall Team Lead) –Joan Javier (Spring Team Lead) –Cyrus Medrano.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
F10-52-PAINTMRK:.  Faculty Technical Advisor:  Dr. Kambiz Farhang  Team Members:  Seth Carter, ME (PM) ▪ Valve & Bolt System  James Morrow, ME ▪
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
TEAM PCG Ben Co (Fall Team Lead), Wendelin Mueller, Garrett Gustafson, and Julia Weimar-East On Project LightBox Primary Faculty Advisor: Dr. Nuxoll Secondary.
Project Plan. Project Plan Components Project Overview – Description and Strategy Business Case Summary Key Deliverables and Scope Critical Success Factors.
Senior Design 1 Android Pilot Nation 2.0 Team Cuckoo’s Nest –Stewart Wilson –Marshall Miller –Oliver Peery –Michael Kness University of Portland School.
Highly Flexible Design for Gantry Robot Systems Team: F08-77-FLXGANT1 Client: Logic One Robots Contact: Bill Egert, Engr VP.
Request for Proposal (RFP)
1.2 NASA: PixelSense Interface Project. Team Members To design an expandable interface for displaying and monitoring the many systems in different space.
Intel Script Editor Northern Arizona University Computer Science and Engineering Design Conference Presentation Spring 2002 Presented by The ENSCRYPT Team.
Mixed-Signal Option for the Teradyne Integra J750 Test System
New Advanced Higher Subject Implementation Events Qualifications Update: Computing Science.
Spring CS-EE 481 Lillevik 481s07-l2 University of Portland School of Engineering Senior Design Lecture 2 Technical staff Prototype phase: DEP, TOP.
TEAM PCG JANUARY PROGRAM REVIEW Garrett Gustafson (Spring Team Lead) Ben Co, Wendelin Mueller, and Julia Weimar-East Project LightBox Primary Faculty Advisor:
SDN Research Speaker :Robert Huang Advisor :Dr. Kai-Wei Ke Date:2014/Nov./4 1.
Remote Pet Feeder Project Status Update Team member1 Team member2 Team member3 Team member4 9 February 2016.
The B uff. The Buffs Outline 1. Summary of last presentation 2. Current iteration and Progress 3. Plan for next iteration.
Software Testing-STLC
Small Business Superannuation Clearing House - Transition to ATO
Timeline Roadmap Template
Software Verification and Validation
Project Genome Mapping
By: Project Manager Date: dd mmm yyyy
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
Project timeline # 3 Step # 3 is about x, y and z # 2
<Location> – <Project Name>, Sponsor: <name>
STEP 8 - CLOSING PHASE: TRANSITION SUPPORT

SWEN 5230 Your Project Title
The 9 steps to successful project implementation
Team member1 Team member2 Team member3 Team member4 Feb. **, 2009
2K Cold Box Cost, Schedule & FDR Summary
How To Use 1 Delete the lines and text you don’t need 2
This Presentation Pack is brought to you by
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
<<Project Name>> – Engagement Status
Team member1 Team member2 Team member3 Team member4 October 2016
GOMACTech-04 Technical Program Committee Timeline
Rock O’ The Range ListenUP
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
Proposals & Project Specifications
Safety Group Program Timeline
01 DRAW YOUR TIMELINE HERE JAN. MAR. JAN. MAR. FEB. APR. FEB. APR.
Transfer to Operations
Drafting Group: Final Meeting Drafting Group: 1st Meeting
Rock O’ The Range Listen UP
Rock O’ The Range ListenUP

Project timeline # 3 Step # 3 is about x, y and z # 2
IT Managed Services Transition Weekly Activity Report: May 28th, 2019
Executive Project Kickoff
IT Managed Services Transition Weekly Activity Report: May 14th, 2019
How to use 1 Delete the lines and text you don’t need 2
Safety Group Program Timeline
Team meetings Purpose for the meeting - GOAL
How To Use 1 Delete the lines and text you don’t need 2
SDLC (Software Development Life Cycle) Role Play
Presentation transcript:

Team 23 –RATMAZES Tyler Ferro, PM Andy Thouvenot, APM Adam Watkins Paul Stofko Dominic DiGregor David Coats Client Dr. Eric Jacobs Advisor Dr. Nazeih M. Botros

Outline Executive Summary -DC List of Deliverables - PS Principle Responsibilities - PS Discussion Project Description - AT Literature Review Summary -DD Timeline - TF Action Item List - TF Resources Needed - AW Summary - AW

Executive Summary Project Background Develop modular chamber Update outdated DOS software More user-friendly Total Dollars Needed: $1055

List of Deliverables Control box prototype Test chamber prototype Soundproof box prototype Code developed during the design process Documentation developed during the design process Documentation developed during the test phase

Principle Responsibilities

Discussion Project Description Client Objectives Additional Objectives Literature Review

Timeline Activity 21- Jan 28- Jan4-Feb 11- Feb 18- Feb 25- Feb4-Mar 11- Mar 18- Mar 25- Mar1-Apr8-Apr 15- Apr 22- Apr 29- Apr Verify specs & Design Make parts for chamber and box Build Chamber and soundproof box Testing & Debugging Build subsystems

Action Item List ActivityPersonDate AssignedDate DueStatusComments Verify specifications and designTF11/17/20091/21/2010 0% Verify specifications and designAT11/17/20091/21/2010 0% Verify specifications and designDD11/17/20091/21/2010 0% Verify specifications and designAW11/17/20091/21/2010 0% Verify specifications and designPS11/17/20091/21/2010 0% Verify specifications and designDC11/17/20091/21/2010 0% Check progress of ordered partsTF11/17/20091/21/2010 0% Check progress of ordered partsAT11/17/20091/21/2010 0% Check progress of ordered partsDD11/17/20091/21/2010 0% Check progress of ordered partsAW11/17/20091/21/2010 0% Check progress of ordered partsPS11/17/20091/21/2010 0% Check progress of ordered partsDC11/17/20091/21/2010 0% Team Progress MemoPS11/17/20091/28/2010 0% Build chamber manipulation devicesPS11/17/20092/25/2010 0% Build chamberAT11/17/20093/4/2010 0% Build sound proof boxDC11/17/20093/4/2010 0% Review software for controlsTF11/17/20094/1/2010 0% Final quality check Review software for controlsDD11/17/20094/1/2010 0% Final quality check Review software for controlsAW11/17/20094/1/2010 0% Final quality check

Resources Needed DescriptionPrice Soundproof Chamber $195 Chamber $181 Manipulanda $53 Control $426 Miscellaneous$200 Total $1055

Summary Project Overview Schedule Resources Needed

Questions?